Loading…
Loading…
4,363 results • Best match
Rectification of Transformer, AVR, VCB with related allied works at Pathardoba w/s Scheme under BMD, PHE, Dte.
SITC of 02 No. 11 kV, 800A, HT VCB Panel[ 1 No. Incoming+ 1 No. Outgoing] Indoor Type
Repairing of HT VCB at Head Works site at Pansuli under RCFA III Zone I Water Supply Scheme.
Replacement of faulty HT Oil circuit Breaker by installing Single Panel VCB at East Kolkata sewage pumping station.
PLUG AND SOCKET, INSULATOR, BRSNG, 11KV, PRCLN, FIXED CONTACT ASSEMBLY FOR BREAKER, VCB SHUNT TRIP COIL, POTENTIAL TRANSFORMER
Custom Bid for Services - Servicing, Overhauling & Testing of VCB Similar Category Operation and Maintenance Power House/Power Plant
SPARK PLUG, KNUCKLE BEARING, WHEEL BEARING FRT, OIL FILTER, FUEL MOTOR, DOOR CATCH, HOSE, AUXILLERY WATER TANK, SOLENOID SWITCH, FUEL WATER SEPRATOR, CENTRE BOLT, STOP LIGHT SWITCH, BEARING AXUAL ROLLER, STARTER 4 ST RELAY, MAIN LINE SWITCH, GEAR LEVER R KIT, REPAIR KIT AIR DRYER
Modification of control room as per WBSETCL standard with False ceiling inside control room and pertition of A E Room And PLCC ROOM And 11 KV Switch gear Room And Ladiese Toilet at B zone 132 KV Substation Under Durgapur Area Office Of WBSETCL
All as per BOQ
Supply and installation of Main switch, MCCB and some ancillary works and laying of cable for AHU at Nazrul Mancha, Kolkata
Supply and installation of self priming pump, outdoor type light fitting and MCCB at the new market new complex under KMC
Replacement of MCCB in the incomer and other allied works at Tirat Mouza Pump House under Tirat Mouza Water Supply Scheme.
Construction of barbed wire fencing with RCC post and concrete pathway to RMU alongwith fixing of gate at DSS 16, 17, 18, 25 and 26 at NTAA IIB under Newtown Division.
Supply and Laying of feeder cables from LT Panel to Sub-main of Lifts and Air-conditioning units and allied electrical works in connection with Electrical wiring an other associated works at New Administrative Building-II, Barasat, North 24 Paraganas
Repairing and reassembling 125KVA Oil Cooled Voltage Stabilizer LT Panel at Intake site and Repairing Rectification work of HT AVR at WTP of Sub Surface water based piped water supply scheme under Tapan Western Sector in the district of Dakshin
Construction of meter room and balance work of pump house for installation of pump an LT panel at tail regulator gate of I an W Department for alternate arrangement of intake point Fulbari water Treatment plant of Siliguri Municipal Corporation at
Up gradation of substation by augmentation of transformer capacity and replace LT panel oil type HT gear at Bolpur SDH, Birbhum-----Supply and Laying of armoured copper control cables, , S and F of chequered plate, C channel with cable duct
Cons. of Prop Up-gradation of Rural Hospital to 100 bedded State General Hospital along with Residential Officers Staff Qtrs at Sainthia, in the dist. of Birbhum ..SITC OF 500KVA INDOOR TYPE SUBSTATION, SUPPLY and LAYING CABLE LT PANEL, MAIN SWITCH
Shifting of Sub-LT Panel from Laundry Block to PGT Hostel with allied Electrical Installation work for construction of Working Women Hostel by demolishing Laundry Block, Garage and kitchen for NTS in the premises of Chittaranjan Seva Sadan COGCH, Kol
As per bid document
Repairing , servicing and overhauling of 3 nos. 4000A LT Incomer ACB including other allied works at Keorapukur SSE Pumping station under Kudghat unit / S and D department.
MAINTENANCE OF THE HT PUMP MOTOR NO-1,2 AND 3 PREMISES WITH SWITCHGEAR FLOORS, VALVE YARDS, OFFICE ETC BY SWEEPING, CLEANING AT PRESSURE STATION 2 IGWTP
Supply, Delivery and Installation, testing and commissioning of Four (4) no Auto-manual control panel with time switch rating upto 20KW Submersible P/M set and other allied works at Dasnagar Khelar math, Golir Mukh, Nibra and allied area
Supply, delivery, installation of Cast Iron made wood base system and Supply, delivery installation of 440V, 3Ph AC Control Panel for wooden pyre system an allied electrical works at Banstala Burning Ghat under HMC for Air Pollution Control System.
Emergency supply and positioning with trial run of Telescopic Tilting type lighting tower motorized version including luminaries, control panel etc at Near Beach end of Road No-1A , Ganga Sagar Main Mela ground in connection with G.S Mela 2025
Supply, Erection,Testing, Commissioning of 15 KVA, 415 Volt, 50 Hz, 3 Phase, Silent type DG Set with manual control panel and necessary arrangements for Masunda Girls High School, Ward-12, New Barrackpore. Make - Cummins or Kirloskar or Volvo
Emergency supply and positioning with trial run of Telescopic Tilting type lighting tower motorized version including luminaries, control panel etc at Near Beach end of Road No-6 , Ganga Sagar Main Mela ground in connection with G.S Mela 2025
Emergency supply and positioning with trial run of Telescopic Tilting type lighting tower motorized version including luminaries, control panel etc at the Near Tiger Baba Asram Main Island , G S Main Mela ground in connection with G.S Mela 2025
Supply, delivery, installation of 20 HP submersible pump motor set and electrical control panel with allied works in newly constructed replaced well at Power house DTW based pumping station (P.H No-02) of Sultanpur-III zone located under NDDM
Overhauling of main pump motor set, Jocky Pump motor set, Diesel Engine driven pump set and control panel (total pumping mechanism system) including comprehensive maintenance for the fire pumps at Naihati State General Hospital BKPSDI 26-27(SL 02)
Supply, installation and Commissioning of Storm Water horizontal Pump Control panel non return valve and all other accessories for DEVELOPMENT OF PROJECT UTSADHARA TO DEVELOP THE RIVER BANK OF GANDHIGHAT under BKP Divn PWD during the year 25-26
Supply delivery and installation of centrifugal pumping machineries, flowmeter with necessary substitutes and allied electrical panel at existing pump house of Sindrichasmore w/s scheme under PMD, PHE Dte. in the District of Purulia.
Up keeping of all electrical installation, Air-conditioning machine, Gyeser, 30KVA Diesel generator set, Electrical panel, outside area illumination system and allied works of Manbhumparidarshan abas bungalow at PHE campus, Purulia under Purulia Mech
INSTALLATION OF KIOSK COMPRISING OF ELECTRICAL PANEL BOX ALONGWITH LAYING OF UNDERGROUND POWER CABLE FOR OPERATING NEW TUBEWELL AT MURRARIPUKUR ROAD AND 72/1 TOPSIA ROAD(SOUTH) IN WARD NO 32 AND 59 RESPECTIVELY.
CABLE 1.1KV, 2C, Cu, PVC, 1.5MM2, CLAMP GRNDG GI, 70MM2, TAPE RBR, 2 INX10M, TIMER RELAY, 550VAC, THNR PAINT INSLTN, SHEET RBR, 3MM, FUSE CRTRG HRC, LNK, 32A, PACKING, GRPHT ABS, 16MM RND, ADOPTER NW BOX RH TO NW, TESTER HND DRVN INSLTN, MEGGER, ... BOARD ACB , ... No., VCB SHUNT ... TERMINAL ACB , ... LAMP VCB 3.3 ... AMP ACB , ... IMFD ACB , ...
Execution of Electrical erection work by Construction of 33KV outdoor bay installation of 33KV outdoor VCB CT PT with Structure indoor 11KV shunt trip VCB 1 IN 1 BC 3 OUT 1BA CR Panel etc work for installation of 01 No 6.3 MVA PTR
Restoration of 11KV 3 panel VCB at CWPH of Puncha water supply scheme under Bankura Mechanical Division,P.H.E. Dte.
SUPPLY OF MATERIALS FOR OVERHAULING AND REPAIRING OF 4 NOS. VCB AND 1 NO. 100 KVA TRANSFORMER AT EWS.
Repairing, Testing and commissioning of 11 KV 800 A Biecco make burnt out VCB at Lat Bagan Pumping Station.
Construction of CT,PT,VCB , Cable Trench at Bagmundi 33/11 KV Sub-Station under Purulia Division, Dist- Purulia
Supply and installation of 6.6kV VCB Panel, Adapter including allied electrical works at New Market New Complex under KMC
Restoration of defective VCB of HT motor no. 3 along with some spare component for Md. Ali Park BPS.
SUPPLY, DELIVERY, INSTALLATION AND COMMISSIONING OF NEW CURRENT TRANSFORMERS OF 11KV INCOMER AND OUTGOING VCB SWITCHGEARS AT BANSDRONI BPS
Supply ,delivery and storage at site of manual operated Power Distribution Board cum MCC panel at Burning Ghat beach side Road no.1 Substation of Ganga Sagar Mela Ground in connection with Ganga Sagar Mela 2024
Supply ,delivery and storage at site of manual operated Power Distribution Board cum MCC panel at beach side Road No.2A and 3A Substation of Ganga Sagar Mela Ground in connection with Ganga Sagar Mela 2024
MCB - Miniature Circuit-Breakers for a.c. operation - IS/IEC 60898 Part 1 (Q2), Molded Case Circuit Breakers (Mccb)- IS/IEC:60947 (Q3)
MCB - Miniature Circuit-Breakers for a.c. operation - IS/IEC 60898 Part 1 (Q2), Molded Case Circuit Breakers (Mccb)- IS/IEC:60947 (Q3)
Copper Alloy Fancy Taps For Bathroom - as per IS:8931 Latest, Molded Case Circuit Breakers (Mccb)-IS/IEC:60947, LED Lamps- bulb
TIMER, RELAY, 550V AC, SWITCH, ICTP, 415V, 400A, 3P, BRKR CRCT, MCCB, 200A, 440V, FIX LGHTG, 230V, 150W, LED, SCRW, PT, 3P
Overhauling of Vertical Turbine Pump No 01 Make WPIL Q 3400 m3 per hr H 20M with supply and fixing of necessary spares as required and replacement of surge protection capacitor inside the HT Panel No 2 along with allied works at RWPS Halisahar