Loading…
Loading…
2,492 results • Best match
Repair and Renovation of Electrical Work of various community center under Zone 3 and 4 under limit of Municipal Corporation Gurgaon.
Repair and Renovation of Electrical Work of various community center under Zone 1 and 2 under limit of Municipal Corporation Gurgaon.
A/mtc. of Office Building, Gen Set in Office Building Sector-13P at Hisar. A/mtc. of Electrical Installation work in HSVP Office Building in Sector-13P, Hisar
Execution of electrical works upto 11 KV HT-LT level strictly as per Nigams Standard Design and specification in the area of jurisdiction of OP Circle DHBVN Narnaul
Supply and Erection of Electrical Cables and other electrical works for High Mast Lights At Five Pond in Ward No 02 M.C Nissing. For L and C Society
The proposal under consideration covers the cost of civil, public health and electrical works including street light in residences of 14 type houses (10 Nos.), 12 type houses.
Renovation of Sick Animal Shed with extension upto 8 animals & construction of Vehicle parking shed at ABRC of ICAR-NDRI, Karnal. (SH: Electrical Provisions). Subwork/Packages: Electrical Works
A/mtc of Electrical Installation (E.L.), A.C., Fan in HSVP Office Building Sector 20P-II at Sirsa for the year 2026-27. (Rates taken in DNIT are excluding GST)
WIRING WORK, EARTHING WORK, REPAIR OF METALLIC RACKS, METALLIC PAINT WORK, PAINTING OF INTERNAL WALLS, FABRICATIND AND ERECTING CABLE TRAY
The provision of 1.5 / 2.0 ton 5 - star split AC, wiring and related accessories have been made in this estimate.
Installation, configuration, wiring and testing charges of Complete Bus Bar Protection Scheme/Panels (02 nos. Panels) at 220kV substation Tepla.
Renovation of Electrical Wiring System of 64 Flats of A7 and A8 Towers at NHPC Residential Colony, Sec-41, Faridabad
Provision of Control Panel, Repeater Panel, Smoke Detector, MCBs alongwith wiring and other accessories have been taken in this estimate
Fabrication of MS Shed with electrical wiring fittings complete in all respect at TWell No. M 27 Sector 9 Panchkula
ARMO Electrical Sub Station Generator at NSTI Office building at Panipat, Haryana Subwork/Packages: Providing Electrical Wiring work in Secretarial
Repair Work Electrical work of lighting work including inside and outside of construction of QC lab at Hafed Complex, Kurukshetra road, Pehowa
Split Air Conditioner, Online UPS, Desktop, Computer Table, Computer Chair, All-In-One Printer, Set of Items for Networking and Electrical Work
Operation and Maintenance of 68 MLD capacity STP at Dhanwapur and 168 MLD MPS at Sector - 9A, Gurugram which includes Civil, Mechanical and Electrical works complete in all respect
Empanelment of firms for execution of electrical works upto 11 KV HT LT level under OP Circle DHBVN Rewari for the year 2021 22 on Labour Scheduled Rates Rewari
SERVICING, REPAIRING/REPLACEMENT OF DEFECTIVE PARTS IN EXISTING ELECTRICAL INTALLATION AT SAI, NCOE, ROHTAK. Subwork/Packages: SERVICING, REPAIR/REPLACEMENT OF DEFECTIVE PARTS IN EXISTING ELECTRICAL INSTALLATION AT SAI, NCOE, ROHTAK.
The wiring work will be got executed in copper wiring with modular switches as MS conduit. The EI load comes to 177 Kw. Hence 2 Nos. load bank of suitable size one for light load and one for power load have been proposed in this estimate. Further flo
From KM Stone 64 to 68 on Left Hand Side NH248A going from Gurgaon to Firozpur Zhirka District Mewat State Haryana under Gurgaon Divisional Office of Delhi and Haryana State Office
Civil Work Electrical work of lighting work including inside and outside of construction of QC lab and toilet block at Hafed Complex Taraori
Civil work Electrical work of lighting work including inside and outside of construction of QC lab and toilet block at Hafed Complex Ladwa
Civil work Electrical work of lighting work including inside and outside of construction of QC lab and toilet block at Hafed Complex Kirmich
Networking and electrical work to be provided in the proposed computer lab to be set up in basement of Administrative Block Sec-51
Const. of Division Sub Division office building civil works, Public health, Septic tank, R.W.H System, Landscaping works, Electrical works, Boundary wall, Earth filling and Dismantling of old SDO Building etc.
SITC heat pump, Hot Water Piping and valve With Insulation, nitril rubber Insulation, ball valves, gun metal or brass non return valve, charges, Electrical works, MCB for Heat pump, cable
Annual maintenance of Electrical installation (EI) including light fixture, ceiling fan, exhust fan, with all associated material in HSVP Office Building sec-15, Sonipat for the year 2025-26. (Excluding GST)
16mm 4 Core Aluminium Armored Cable, Labour Charges for Underground Cable Laying with Electric Connection Charges, 16mm 2 Core Aluminium Cable, Outside Junction Cable Box with Accessories, 100 Watt LED Flood Lights with Wiring MCB Junction Box and ... with Wiring MCB ...
16mm 4 Core Aluminium Armored Cable, Labour Charges for Underground Cable Laying with Electric Connection Charges, 16mm 2 Core Aluminium Cable, Outside Junction Cable Box with Accessories, 100 Watt LED Flood Lights with Wiring MCB Junction Box and ... with Wiring MCB ...
Civil work Electrical work of lighting work including inside and outside of construction of QC lab and toilet block at Hafed Complex Ajrana Kalan
RENOVATION OF COMMUNITY CENTRE (CIVIL WORK, PLUMBING WORK and ELECTRICAL WORK ) IN VILLAGE DAULATABAD, NEWLY EXTENDED AREA, ZONE NO.-01, GURUGRAM ,UNDER MCG AREA
Construction of new SDO office building inclung building work, road work, electrical work, sanitary work, boundary wall, water tank and septic tank etc. complete
Annual Maintenance of Water Supply Scheme i.e. Kiloi Dopana District Rohtak for 03 Months from the Date of Commencement (Pumping Machinery and Electrical Work)
Recall Annual Maintenance of Water Supply Scheme i.e. Kansala District Rohtak for 10 Months from the Date of Commencement (Pumping Machinery and Electrical Work)
errection of ceiling fans wall frame exhaust fan and wiring etc at water works in Sector 10 Ambala Complete in all respect
Pdg. wiring, PVC Pipe, LED Lights, SPN MCB, SPN Enclosure, SP MCB and Cable tray etc. has been made in this estimate
Construction Of Sub Division Office Building i/c Civil works, Public Health, Septic tank, Rain water harvesting system, landscaping works, electrical works, Boundary wall and Dismantling of Residential Qtrs. at Newal.
Empanelment of firms for execution of electrical works upto 11 KV HT/LT level for the FY 2025 2026 on Nigams Labour Scheduled Rates under jurisdiction of Op Circle DHBVN Rewari
Construction of 11KV Electrical sub station building (40 x 22) in the campus of Anjanthali Farm, MHU, Karnal (Civil Internal Electrical Works) (Re invited 1st time) (Appro. Cost Rs. 17.38 lakh)
Recall Annual Maintenance of Water Supply Scheme i.e. Ladhot Bhiyanpur District Rohtak for 06 Months from the Date of Commencement (Pumping Machinery and Electrical Work)
Special Repair of Dolphin Chowk, MDC, Panchkula (Including civil, electrical work and running, operation, watch and ward of fountain for the period of 12 months)
Const. of Sub division office building i/c Civil work i.e Public health, Electrical work, Rain water hervasting system, Septic tank and Landscaping work etc.
Civil work, plumbing work, electrical work, parking shed, earthfilling, septic tank, water tank etc work in new SDO office at Badrola under OP circle Faridabad
Sauna Bath Supply, Sauna bath Intallation, Sauna bath Testing, Sauna bath Commissioning, Sauna bath all Civil Works, Sauna bath Plumbing Work, Sauna bath Electrical Work
Execution of electrical works upto 11 KV HTLT level strictly as per Nigams Standard Design and specification in the area under jurisdiction of OP Circle DHBVN Bhiwani for the year 2024 25
Execution of electrical works upto 11 KV HT/LT level strictly as per Nigam Standard Design and specification in the area under jurisdiction of (OP) DHBVN, Faridabad for the year 2023-24
The proposal under consideration covers the cost of civil, public health and electrical works. Provision mainly for following items job has been made in this estimate i. Providing false ceiling 15 mm
-Repair and maintance Floor tile ,door and Electrical wiring and white washing work at 220kv s/stn Sec-1 JE Construction Room Manesar.