Loading…
Loading…
8,329 results • Best match
Construction of temporary structures of Police Camp in connection with GS Mela-2025 under Kakdwip Sub-Division of Alipore Division, PHE Dte.
Emergent electrical works supply of materials at Mohana Inspection Bungalow as per direction for ensuing G. S. Mela- 2023 under Kakdwip P.S
Construction of brick pave road Pilgrim road -8 at mouza- Kalinagar under Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2022.
Renovation to office of the Sub-Divisional Officer (Kakdwip) including allied works under Kakdwip Irrigation Division in connection with GS Mela-2026
Construction of Ramp for ease of movement of pilgrims from 1 - 1A road to sea beach for Gangasagar Mela 2026 under GBDA
Providing sanitary Napkin vending machine with incinerator at ladies toilet blocks of Kolkata Bus stand in connection with Ganga Sagar Mela - 2025
Illumination and water supply arrangement including hiring of generator at Bangabasi ground near Outram Ghat in connection with Ganga Sagar Mela 2025
Making temporary gate with decorative illumination arrangement near K1 Bus Stand Ganga Sagar Main Island in connection with Ganga Sagar Mela 2024
Supply and delivery of submersible pumping machinery at Purusattampur and adjacent W/s scheme, sagar block in connection with GS Mela - 2025
Installation of Water Purifier Machine at Kalir Mela Prangan, Mouza-Krishnanagar, JL No.- 123 Plot No-1482 under Khejuri-I Panchayat Samity.
Construction of temporary small Vehicle stand at Harwood point in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity , South 24-Parganas
Environmental pollution control Herbal Spray at different projected areas of Ganga Adjoining Blocks at Ganga Sagar Mela-2026 under SBM-G Programme
Alied works in different ghats along R/Bank of river Hooghly of Baidyabati Municipality for Sraboni Mela under PS Serampore, Dt Hooghly
TEMPORARY LIGHTING ARRANGEMENT FOR SRABANI MELA IN FRONT OF DURGESHWAR SHIVA TEMPLE AT NIMTOLA GHAT STREET IN WARD NO-20, BR-II
Special drive for replacing of paver blocks, relaying of kerb stones and ancillary works at Salt Lake Central park Mela ground, Bidhannagar.
Erection of temporary structure including fitting fixing and supply of materials at Galsi High School under Galsi II Dev Block on hire basis in connection with celebration of Biswa Adibasi Dibas 2023
Erection of Electrification Work including fitting fixing and supply of materials at Galsi High School under Galsi II Dev Block on hire basis in connection with celebration of Biswa Adibasi Dibas 2023
Provision for temporary High Speed Internet Service during the programme to be attended by VVIP at Red Road, Kolkata on 15.08.2026 in connection with the Celebration of Independence Day, 2026 Backup Feed
Provision for temporary High Speed Internet Service during the programme to be attended by VVIP at Red Road, Kolkata on 15.08.2026 in connection with the Celebration of Independence Day, 2026 Main Feed
EO_GBDA_63_2022-23
EO_GBDA_39_2020-21
designing, branding and implementing the work for the programme of Bengal Pre Puja Handloom and Handicrafts Exhibition 2025 at Dilli Haat,
Arrangement for Chhat Puja Festival (Pandel, Light, Sound system) in Debi Ghat (35 No Ward) and Dum Dum Park Pond (28 No Ward).
Repairing of MAR - 2222 with 25 mm thick SDBC and other relevant items in AA - I, New Town, Kolkata before ensuing Puja Festival.
TEMPORARY LIGHTING ARRANGEMENT ON THE OCCASSION OF CHATT PUJA FESTIVAL-2025 AT DIFFERENT GHATS OF MUNSIGAUNGE ROAD, CANAL ROAD IN WARD NO-75.
TEMPORARY LIGHTING ARRANGEMENT ATJHALDER MATH, MONDAL TEMPLE LANE, KUMAR PARA AREAS AND DIFFERENT GHATS FOR UPCOMING FESTIVAL IN WARD NO-81, BR-X.
PROVISION OF ARRANGEMENT TO MAINTAIN THE HIGH VOLTAGE MACHINERIES UNDER RIVER WATER PUMPING STATION BY COMBATING THE FESTIVAL AND STORMY DAYS AT IGWTP
Estimate for hiring charges of long boom excavator for dumping of immersion idol structure during puja festival at Belgachia Trenching Ground under HMC.
TEMPORARY LIGHTING ARRANGEMENT DURING DURGA PUJA FESTIVAL ON BOTH SIDE FOOTPATH FROM BOSE PUKUR SHITALA MANDIR TO BIJAN SETU WITHIN WARD NO.-67
RESTORATION OFPAVER BLOCK FOOTPATH AT ELLIOT ROAD, ROYD STREET (BOTH SIDE) AND R.A.K ROAD (EASTERN SIDE) ENSUING PUJA FESTIVAL IN WARD NO-61.
Thorough repairing and maintenance of 04(Four)nos. Dumper Placer (Layland Hino) under Dhapa Garage/SWM-II for coming ID-UD-ZOHA festival
SHED FOR RIKSHA STAND AND OTHER FESTIVAL PURPOSE AT BOOTH No 66 WARD NO 13, LOCATIONNEAR HOUSE OF BABU DAS WITHIN HALISAHAR MUNICIPALITY.
TEMPORARY DECORATIVE ARRANGEMENT AT CITIZENS PARK, CORNFIELD ROAD, BALLYGUNGE PLACE ON OCCASION OF X-MAS FESTIVAL 2022 IN WARD NO. 68 BR-VIII.
TEMPORARY LIGHTING ARRANGEMENT FOR SAB-E-BARAT FESTIVAL AT M.B.G. LANE, EKBALPUR ROAD, MOMINPORE ROAD AND IN DIFFERENT PLACES IN WARD NO-78
TEMPORARY LIGHTING ARRANGEMENT FOR UPCOMING FESTIVAL 2024 RANIKUTHI TO PALLYSHREE AND GD BIRLA TO NETAJINAGAR NARKELBAGAN ETC IN WARD NO-98, BR-X
ARRANGEMENT TO MAINTAIN THE CSR I AND CSR-II WITH THE CONNECTED PUMPING STATIONS TO COMBAT STORMY THE AND FESTIVAL DAYS AT IGWTP.
Fabrication of the Stall of West Bengal Tourism at Allen Park along with various related works on the occasion of Christmas Festival 2020
MISCALLENEOUS WORK FOR STREET LIGHTING SYSTEM AT DHALIPARA, NAZRUL SARANI AND DIFFERENT ROAD DUE TO FESTIVAL OF MUHARRAM-2024 IN WARD NO-143.
Providing uniquely colour coaded and numbered backlit identifiers at Bathing zones of beach of Ganga Sagar in connection with Ganga Sagar Mela - 2024
Providing Deluxe Pre Fabricated FRP Bio Toilet and Urinals etc On hire basis at Parking Zone in connection with Ganga Sagar Mela 2025
Hiring of Laser and sharfy light for Jetty, Lost and Found and information tower at Kachuberia in connection with Ganga Sagar Mela 2023
Erection of temporary barricading at different places of Sagar Island in the district of South 24- Parganas on ensuing of Gangasagar Mela-2023.
Deployment of qualified and trained manpower for round the clock monitoring and coordinating at Lot-8 Point in connection with Gangasagar Mela 2024
Brick Soling at different Hogla shed for Hospital and etc. in Connection with Gangasagar Mela -2025 under Kakdwip Panchayat Samity, South 24-Parganas
Repair of brick Paved Road from Rail Line to NH-117 at Mouza Narayanpur under Kakdwip Irrigation Division I.C. with G.S. Mela-2024.
Construction of temporary structures for other Govt. Organisations and Police Staffs in connection with G.S Mela-2022 under Alipore Division, P.H. Engineering Dte.
Providing uniquely colour printed designer box on hire basis from Ashram more to Bakultala at Kachuberia in connection with Ganga Sagar Mela - 2024
Illumination and water supply arrangement including hiring of generator at Kolkata Bus Stand near Outram Ghat in connection with Ganga Sagar Mela 2021
Construction of temporary structures for Volunteer Organization in connection with G.S Mela-2023 under Kakdwip Sub-Division of Alipore Division, P.H. Engineering Dte.
Replacement of defective of electrical accessories at different water supply scheme Sagar Block at Ganga Sagar in connection with Ganga Sagar Mela-2024.