Loading…
Loading…
8,334 results • Best match
Sinking of 02 (two) no.100mm x 50mm dia. having 5 nos. Strainer upto 300 mtr (Average) depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different places of Namkhana Point i.c.w. Ganga Sagar Mela 2024.
Painting and Lettering to Ordinary K.M. Post, 5th K.M. Post etc. Railings of Kachuberia Gangasagar Road from 0.00 kmp to 30.00 kmp, Chayergheri to Sridham via Chemaguri Road and Road No - 5 at Sagar Island under DHHD for ensuing G.S. Mela 2024
Temporary Hogla Structure for Police and Temporary Special Latrine Supply and Installation of Change Room on hire basis at Sea Beach area adjacent to the Road No. 4 and 5 in connection with G.S. Mela 2024 under Kakdwip Sub-Division, PHE Dte.
Construction of temporary hogla structures for Cloak Room at Bathing Zone in Sea Beach, Zig Zag Barricading and Barricade with drop gate in front of Kapil Muni Temple in connection with G.S. Mela 2025 under Kakdwip Sub-Divn of Alipore Divn, PHE Dte.
Emergent Repairing and Maintenance work in stretches and beautification work of NH-117 from Km 98.00 and Km. 111.71 in connection with ensuing Ganga Sagar Mela 2022 under N.H. Division-I in the district of South 24 Parganas during the year 2021-22.
SUPPLY AND INSTALLATION 3 NOS OF SOLAR STREET LIGHT 4 WINGS (I) NEAR RASH MELA MATH AT PURBA NALUA,NALUA-G.P (II) NEAR DHARMARAJ MANDIR AT GAMBHIRBAD, NALUA-G.P (III) NEAR NALUA BAZAR AT PASCHIM NALUA , NALUA G.P. UNDER MATHURAPUR-I PS
Fitting, fixing Fire Hydrant Lending (FHL) Valve on the existing pipe line, fixing bamboo post for demarcation for Fire Fighting and allied works (for Zone-II area) in connection with G.S. Mela 2025 under Kakdwip Sub-Divn of Alipore Divn. PHE Dte.
Sinking of 01 no. 125mm x 80mm dia. upto 105m deep Tube well and Fire Fighting Arrangement including Pump House, Cloak Room and Ancillary Works in connection with Ganga Sagar Mela 2022 at Outram Ghat Transit Point under Alipore Division, P.H.E Dte.
Hire and labour charges for Supplying and Installation of Luxury Swiss Cottage Tents at Narayanpur MPCS Ground 30 x 16 inclusive Branding all taxes 4 nos tent x 480 sq. ft. x 7 days as per direction for ensuing G. S. Mela- 2023
Construction of temporary 2 nos. wooden Tower at Benuban 2no. Getty Ghat Point and Kachuberia 3no. Getty Ghat Point and 1no wooden tower (7.50 mtr height) at Kachuberia point and 5 nos. Bamboo Tower at Kachuberia Point i.c.w. Ganga Sagar Mela 2022.
Installation of decorative pandle on hire basis for 12 days made by Bamboo and wooden frame and decorative colour cloths and supply of chair, table on hire basis as per requirement in the temporary dining area for Press Campus i.c.w. G.S Mela 2023.
Special repairs to 2 (Two) nos semi-permanent Jetty(Jetty No. 3-5) along right bank of river Muriganga at mouza Kastala, Block P.S. - Sagar, Dist. - South 24 pgs, under Sagar (I) Sub-Division, of Kakdwip (I) Division, in connection with G.S. Mela
Installation of decorative pandal on hire basis made by Bamboo and wooden frame and decorative colour cloths and supply of chair and table on hire basis as per requirement for Press (I, II, III) campus and others i.c.w. Ganga Sagar Mela 2024.
Temporary structure of Hanger for PILGRIM SHED 60 x 60 inclusive Branding all taxes 5 nos Hanger x 3600 sq. ft. x 7 days at Kachuberia in Jetty No.- 5, as per direction for ensuing G. S. Mela 2023 under Sagar P.S.
Hanger structure for the uses of PILGRIM South Side 200 x 62.5 inclusive Branding all taxes 2 nos Hanger x 12500 sq. ft. x 7 days at Indira Maidan, Namkhana as per direction for ensuing G. S. Mela 2023 under Namkhana PS.
Construction of Temporary Special Latrine, hogla structure and Supply and Installation of Change Room on hire basis at Sea Beach area adjacent to the Road No. 2, 3 and Laying brick flat soling at 11no. A Type structures i.c.w. G.S. Mela 2024.
Sinking of 1 (One) no. 125mm x 80mm dia. upto 105m deep Tubewell and Fire Fighting Arrangement including Pump House, Cloak Room and Ancillary Works in connection with Ganga Sagar Mela 2024 at Outram Ghat Transit Point under Alipore Division, PHE Dte.
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Urgent Clearing, Painting work to facilitate safe movement of vehicles from Kmp 56.000 to Kmp 98.000 with repairing of 2nos. Culvert Parapet wall in connection with Ganga Sagar Mela 2024, under N. H. Division-I in the district of South 24 Parganas.
Carriage of Mobile Toilet Unit from G.S Mela Ground to Outram Ghat Point at Kolkata and back from Outram Ghat Point to nearby PHE Godown within 40km and supply of Chemical Toilet with attendant etc. at Outram Ghat Transit Point i.c.w. G.S.Mela 2021.
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 2240 sq. ft. x 7 days at Bamunkhali East Side as per direction. for ensuing G. S. Mela 2023
Maintenance and operation of 3 Nos Wooden Jetty at Chemaguri point under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Gangasagar Mela 2023, , 2nd call of e-N.I.T No - WBIW/SDO/SISDIVISION/e-NIT- 01e/2022-23 of Sa
Sweeping and cleaning painting of road kerb steel railing and other allied works of Diamond Harbour Road in between metro pier no 188 to 204 in different stretches under Alipore Division in connection with Gangasagar Mela 2024 during the year 2023 24
Repairs of bituminous road from old bus stand to 100 m extended portion from jetty no-5 for a total length of 1350 m at Mouza - Kastala of sagar Irrigation Sub-Division under Kakdwip Irrigation division in connection with Ganga sagar mela-2023
Construction of concrete Toe of Sundarban embankment for a length of 130 mtr at 1 no jetty at mouza-Kachuberia on the right bank of river-Muriganga under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela
Dressing of flank and painting to Road side tree from km 22.76 to km 56.00 of NH 117 in connection with ensuing Ganga Sagar Mela 2025 under N.H. Division No.I in the District of South 24 Parganas during the year 2024-25
Sweeping and cleaning painting of road kerb steel railing and other allied works of Diamond Harbour Road in between metro pier no 211 to 231 in different stretches under Alipore Division in connection with Gangasagar Mela 2024 during the year 2023 24
Installation of Tubewell at i)Mejbil Mandir, ii) Near the house of Ratan Barman at Charak Mela, iii) Near the house of Dhananjay Barman ICDS, iv) Near the shop of Rajib Barman, v) Near the house of Gopal Shil in Purba Kathalbari GP
Construction of Temporary Pandel and wooden platform for the period of 09.01.25 to 17.01.25 at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela- 2025 under South 24 Pgs Highway Division P.W.(R)Dte.
Sweeping and cleaning painting of road kerb steel railing and other allied works of Diamond Harbour Road in between metro pier no 151 to 174 in different stretches under Alipore Division in connection with Gangasagar Mela 2024 during the year 2023 24
Re-excavation of Chemaguri Khal for a length of 1200 m from Ch. 0.00 km to Ch. 0.700 km Ch. 2.000 km to Ch. 2.500 km under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela-2020
Construction of 01(one) no. 60 ft. Bamboo Tower and 02(two) nos. 45 ft. Banboo Tower for installation of VHF Antenna and CCTV Data Operating System respectively at Lot-8 Point in connection with Gangasagar Mela 2023 under Diamond Harbour Sub-Division
Installation of decorative pandle on hire basis for 12 days made by Bamboo and wooden frame and decorative colour cloths and supply of chair and table on hire basis within the temporary dining area for Press campus etc. i.c.w G.S Mela 2022.
Construction of 01(one) no. 60 ft. Bamboo Tower and 02(two) nos. 45 ft. Banboo Tower for installation of VHF Antenna and CCTV Data Operating System respectively at Lot-8 Point in connection with Gangasagar Mela 2025 under Diamond Harbour Sub-Division
Construction of Temporary Pandel and wooden platform for the period of 09.01.2024 to 17.01.2024 at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela-2024 under South 24 Pgs. Highway Division P.W.(R)Dte.
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations icw Ganga Sagar Mela 2023
Construction of Temporary Pandel and wooden platform for the period of 09.01.2024 to 17.01.2024 at Bus Buffer zone at Pailan Education Park in Bishnupur-I Block beside NH-117 during Ganga Sagar Mela 2024 under South 24 Pgs Highway Division PW(R)Dte.
Hire and labour charges for Supplying and Installation of Luxury Swiss Cottage Tents at Chemaguri 24 x 16 inclusive Branding all taxes 4 nos tent x 384 sq. ft. x7 days as per direction for ensuing G. S. Mela 2023 under Sagar P.S.
Construction of temporary car parking along with apporach roads towards different units i.e rooms, stores, kitchen etc. in the premises of P.H.E.D camp office at PR-8 Ground of Lot-8 point in connection with Ganga Sagar Mela 2025 under Diamond Harbou
Temporary Installation of Hanger structure shed for Ordinary Dormitory for Support Staffs inclusive Branding all taxes 1 no Hanger 130 x15 1950 sq. ft. x 7 days at D M Circuit House as per direction for ensuing G. S. Mela 2023 under S
Maintenance of buffer zone ramp at Halder Chowk by pumping out water, cutting of shrubs, spreading and compacting sand and brick bats as and where necessary under KHSD of DHHD in the district of South 24 Parganas for ensuring Ganga Sagar Mela 2025.
M/R to damage of sundarban embankment for a length of 40.00 M from Ch. 0.261 Km to 0.301 Km facing river Muriganga right bank at Mouza - Kachuberia under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela
M/R to damaged block pitching of the existing embankment for a length of 120 m at LoT-8 facing left bank of river Muriganga at Mouza- Kalinagar, Block- Kakdwip, Dist. South 24 Parganas- under Kakdwip Irrigation Division i.c.w. G.S. Mela-2026
Arrangement of temporary installation of LED Flood Lights and engagement of manpower on the service road of Delhi Road and main road of Tarakeswar Road from Searampore Toll Tax to Diara Health Centre More for Shrabani Mela 2025 in the dist of Hooghly
E/M works
E/M works
E/M works
e-NIQ No.- 01/KMDA/CIVIL/SE(CRS)/EandAM OF 2022-23
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 1800 sq. ft. x 7 days at Tourist Cottage South West Side as per direction. for ensuing G. S. Mela- 2025