Loading…
Loading…
8,334 results • Best match
Sinking of 01 (One) No. 250mm x 150mm dia. Tubewell 330 mtr. deep by Direct Rotary Rig Method using P.V.C pipe and pre-packed Resin Bonded Gravel Filter at Lot No. 8 Point, Block - Kakdwip in connection with Ganga Sagar Mela 2020. (2nd Call)
Construction of Temporary Pandal with other allied works at Bus Buffer zone at Century Ply Ground in Bishnupur-I Block beside NH-117 for the period of 09.01.26 to 17.01.26 during Ganga Sagar Mela- 2026 under South 24 Pgs Highway Division,P.W.(R)Dte
Sinking of 01 no. 100mm x 50mm dia. having 5 nos. Strainer upto 360 mtr Average depth fitted with India Mark-II DWP Hand Pump Tubewell with supplying PVC Pipe at office premise of Kakdwip Sub - Division i.c.w. Gangasagar Mela 2026 under Kakdwip Sub
Installation of Hanger structure shed for Executive Suit 60 x 30 nclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 1800 sq. ft. x 7 days at Tourist Cottage North East side as per direction. for ensuing G. S. Mela- 202
Hiring of Sound System, Stage Lighting, 62.5 KVA and 125 KVA DG Set, Electrical goods and Temporary Service Connection (For 03 nos of Energy meter) for the Organisation of Sarash Mela 2025-26 from 31st October to 16th Nov 2025 at Chawrasta and Bhanu
Installation of Hanger structure shed for Executive Suit 70 x 32 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 2240 sq. ft. x 7 days at Tourist Cottage South West Side as per direction. for ensuing G. S. Mela 2023
Special maintenance and repair of Hatugunj Usthi Road at different stretches within 3.30 km to 3.80 km, 4.30 km to 4.80 km, 5.80 km to 6.80 km and 7.80 km to 8.30 km for ensuing Gangasagar Mela 2021 under Diamond Harbour Highway Sub-Division
Emergent repairing of road surface by mending potholes, cracks etc. and finishing the surface with Premix Chipping Carpet and Seal Coat between Km. 56.750 - Km. 56.900 under DHNHSD under NHD-I in connection with GS Mela 2024 in the dist of 24 PGS(S)
Supply and Installation of Change Room (4 nos.) on hire basis at Sea Beach area and operation and maintenance of 120 nos. Semi Permanent Latrine at 5 No. Toilet Ground for Maghi Purnima - 2024 in connection with G.S. Mela 2024 under KSD of AD, PHED
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Reconstruction of road as per demand of Booth no. 159 Sl. No. 2) Indranil Daripa to Dilip Des house , 4) Malpara Mansha Mela to to Bhairab Mals house, 5) Naresh Das to Sunil Deys house within ward no. 16 under Bankura Municipality against APAS S
Kachuberia-Gangasagar Road barricading at different stretches of road (12 km to 30 Km), side of adjacent pond at Sagar Island under Kakdwip Highway Sub-Division of DHHD in the district of South 24 Parganas at Sagar Island for ensuing G S Mela - 2024.
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela, PHE
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela PHEd
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Construction of temp. special latrine at G.S. Mela Ground including mtc. of latrine and Operation,mtc. of Mobile Toilet Unit 8nos. at Sea Beach Road No.3,4,1,2 and 66nos. Latrine for 20days atK1 Bus Stand in c/with G.S. Mela24 under KSD of AD, PHED
Repair and Maintenance of Chayergheri-Chemaguri Road from 0.00 Kmp to 1.80 Kmp by 20 mm Premix Carpet and Premixed Seal Coat Type-B at Sagar Island under Diamond Harbour Highway Division in the district of South 24 Pgs. for ensuing G.S Mela - 2026.
Carriage of Mobile Toilet Unit 06 Nos. from Dongaria Godown to Park Circus Maidan and back from Park Circus Maidan to Dongaria and smooth O and M for daily use by the visitors in connection with Milon Mela -2025 under Alipore Division, PHE Dte.
Painting Block Letters on the Toilet G I Tank / PVC Tank at different Bus Buffer Zone from Pailan to Kakdwip in connection with Ganga Sagar Mela 2022 under RWS Alipore Sub Division PHE Dte in the Dist of South 24 Parganas under Alipore Division
Carriage of Mobile Toilet Unit 4 Nos. and 4 nos. Bio-Toilet for detainment of requisitioned vehicle from Dongaria Godown to Outram Ghat Transit Point at Kolkata and back from Outram Ghat Transit Point to nearby PHE Godown in/C with G.S. Mela 2026.
Construction of Temporary Vehicle Stand at the end of Road No-V at Sagar Island for small vehicles coming from Chemuguri Ferry Ghat and MT Section for Police Vehicle under DHHD Division in the district of South 24 Pgs for ensuing G. S. Mela - 2025
Hire and labour charges for Supplying and Installation of Luxury Swiss Cottage Tents at Bamankhali 24 x 16 inclusive Branding all taxes 2 nos tent x 384 sq. ft. x 7 days as per direction for ensuing G. S. Mela 2023 under Sagar P.S.
Sinking of 3 (Three) nos. 100 mm. x 40 mm. dia. upto 300 mtr. deep fitted with India Mark-II DWP hand pump PVC tube well at different locations of Lot-8 Point in connection with Ganga Sagar Mela 2021 under Alipore Division, PHE Dte.
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela PHED
Construction of B.F.S. shoulder on left side of pilgrim road near jetty no. 2 to Culvert for a length of 300 M and protection of office pond with shifting of scrap materials at Kashtala, Kachuberia point under Kakdwip (I) Division i.c.w G.S. Mela- 2
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 2240 sq. ft. x 7 days at Bamunkhali West Side as per direction. for ensuing G. S. Mela 2023 under Sagar
Installation of Hanger structure shed for Executive Suit 70 x 32 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 2240 sq. ft. x 7 day at Tourist Cottage South East Side as per direction. for ensuing G. S. Mela 2023
Reconstruction of CC road from Laxmikanta Garai Shop at Gopinathpur to the Shop of Bishnu Kumar Agarwal at the junction of Natunganj Road and Construction of CC Road over BT Road from Rashtala More to Namo Teligoria Mansa Mela Area within Ward No 3
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 1800 sq. ft. x 7 days at Tourist Cottage South East Side as per direction. for ensuing G. S. Mela- 2025
Construction of 12 nos. Latrine, 24 nos. Urinal, surface drain and approach pathway towards Latrine and Urinal and maintenance of 264 nos. Latrine and 24 nos. Urinal for 10 days at K1 Bus Stand of Sagar Block in connection with Ganga Sagar Mela-2020.
Placing temporary structure for Pilgrim made by hanger Harwood Point, Kachuberia near Jettry No 5 50 x 60 inclusive Branding all taxes 10 nos Hanger x 3000 sq. ft. x 7 days under Sagar PS as per direction for ensuing G. S. Mela 2023 unde
EMERGENT REPAIRING OF DAMAGED GAP ZONE IN BOTH SIDE SERVICE ROAD AT IOCL PIPELINE CROSSING AT CHAINAGE 1.12 KM OF KONA EXPRESSWAY (NH-117) BY ICBP IN CONNECTION WITH ENSUING GANGA SAGAR MELA 2023 UNDER NH DIVISION NO.-1, IN THE DISTRICT OF HOWRAH DUR
Laying waste water pipe line along with inspection chamber near at K1 and K2 Bus Stand and 5 No. Toilet Ground from Sludge Tank to nearest disposal point in connection with Ganga Sagar Mela-2020 under Kakdwip Sub-Divn of Alipore Division, PHE Dte.
Dressing of Road flanks and Painting work from Kmp. 56.00 to Kmp 98.00 and Emergent repairing of potholes between Km. 94.50 to Km. 98.00 of NH-117 in different stretches in connection with Ganga Sagar Mela 2022, under N. H. Division-I in the district
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding Hire and labour charges and all taxes 1 no Hanger x 2240 sq. ft. x 7 days at Tourist Cottage North East side as per direction. for ensuing G. S. Mela
Temporary Installation of Hanger structure shed for 20 Bedded OFFICER Dormitory East side 80 x 60 inclusive Branding all taxes 1 no Hanger x 4800 sq. ft. x 7 days at Sagar Mela Office near Harwood Point as per direction for ensuing G. S.
Construction of Temporary Special Latrine, Hogla structure and Supply and Installation of Change Room on hire basis at Sea Beach area adjacent to the Road No. 2,3 and Laying brick flat soling at 11 no. A Type structures etc. in/C with G.S Mela 2026.
Installation of Hanger structure shed for Executive Suit 60 x 30 inclusive Branding, Hire and labour charges and all taxes 1 no Hanger x 1800 sq. ft. x 7 days at Tourist Cottage North West side as per direction. for ensuing G. S. Mela- 202
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Sinking of 01 nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela PHED
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Sinking of 01 (One) nos. 100mm x 50mm dia having 4 nos. Strainer upto 300 mtr. depth fitted with India Mark-II DWP hand pump Tubewell with supplying PVC Pipe at different Bus-Buffer Zone within different locations in connection with Ganga Sagar Mela
Painting of Trident Pole, Panel Box of Road No.4 and Road No.2 including Scrapping, painting and numbering of PCC poles of Laxmibazar more and back side of Bus stand to Kali Mandir at Ganga Sagar in connection with Ganga Sagar Mela-2025
Repairing work of Hatuganj-Purbabishnupur Road in connection with Gangasagar Mela, 2026 in patches from Ch. 0.25 km - 0.70 km, 1.00 km - 2.00 km, 4.00 km - 7.10 km, 7.40 km - 11.40 km, 11.50 km - 12.00 km and 13.00 km - 15.80 km under Diamond Harbour
E/M works
E/M works
Temporary Installation of Hanger structure shed for 20 Bedded Dormitory 100 x 50 for Staff I T Personnel 1 no Hanger x 5000 sq. ft. x 7 days at Lot 8 Old Bus stand inclusive Branding all taxes as per direction for ensuing G. S. Mela
Urgent Improvement of Shoulder by ICBPP between km 31.685 - km 32.545 and km 37.385 - km 37.815 and construction of H.P culvert at km 32.450 and RCC drain from km 32.19 - km 32.45 of NH-117 in connection with ensuing Ganga Sagar Mela 2024 under NHD-I
Installation of 4 nos of Swis TENT32 x 16 inclusive Branding all taxes 4 nos tent x 512 sq. ft. x 7 days and View Cutter at beside Janhabi Guest House including branding all taxes as per direction for ensuing G. S. Mela- 2023 under Kakdwip