Loading…
Loading…
2,255 results • Best match
Fabrication of New Adjustable Coal Nozzle tips "26"size with divider "Y" and "Z" arrangement for all corners 2&4 and 1&3 of unit 3&4 boiler for a period of 6 months from the date of commencement of work as and when required during the year2026-27.
Widening and strengthening the carriageway from Km 14/0 to 19/8 of Rayadurg BTP road (via) Gummagatta in Anantapuramu District. Sub work: Fabrication supply and fixing of RCC KM, HM, stones, and painting etc., in Km 14/0 to 19/8 of Rayadurg BTP road (via) Gummagatta
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger platen coils of Units-5&6 Boiler during annual overhaul period for the year 2019-20.
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 2 boiler during annual overhaul period for the year 2018-19
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 1 boiler during annual overhaul period for the year 2018-19
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser b)LTR c)LTS d)HTS e)ITS f)HTR and g)Hanger plten coils of Units-5&6 boiler during annual overhaul period for the year 2016-17.
Replacement of IPW/DMW joints and attachments(in HTR&HTS coils) and tubes necessary including HP welding in the areas like a)Economiser, b)LTR, c)LTS, d)HTS, e)ITS, f)HTR and g)Hanger platen coils of Units-5&6 Boiler during annual overhaul period for the year 2018-19.
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms & tops of Unit 1 boiler during annual overhaul period for the year 2021-22
Patch welding at all classifier pipes including bends at various corners covering the areas from mills to main boiler at all four corners and replacement of damaged victaulic/dresser couplings and gaskets for pulverized fuel lines in Unit-6 of Stage-IV/Dr.MVR RTPP as and when required during the year 2025-26.
CALLING LT FOR FABRICATION OF 20KL HORIZONTAL TANKS FOR VIZAG DIVISIONAL OFFICE UNDER TAPSO
SUPPLY OF SPECIAL WELDING ELECTRODES (EUNITRODE MLOTHERME) REQUIRED FOR WET ASH SYSTEM OF AHP/STAGE-I
Set of Overhauling kit items required for LP/ALP seat assembly of AC electric locomotive consisting of 10 items as follows. 1)Lead screw & bush. Qty/set. = 01 no. 2)Rotating stopper pin. Qty/set. = 01 no. 3)Big spring. Qty/set. = 01 no. 4)Connecting ... lever welding assembly. ... bracket welding . ...
Set of Overhauling kit items required for LP/ALP seat assembly of AC electric locomotive consisting of 10 items as follows. 1)Lead screw & bush. Qty/set. = 01 no. 2)Rotating stopper pin. Qty/set. = 01 no. 3)Big spring. Qty/set. = 01 no. 4)Connecting ... lever welding assembly. ... bracket welding . ...
Fabrication and Supply of AP bin - Type A - as per the technical specificafication and drawings of ATC document, Fabrication and Supply of AP Feed Hopper - Type B - as per the technical specificafication and drawings of ATC document, Fabrication and ... document, Fabrication and ... document, Fabrication and ...
BALANCE WORK OF PACKAGE NO 6 INVESTIAGTION DESIGN DRAWINGS ESTIMATION AND CONSTRUCTION OF BARRAGE CUM BRIDGE ACROSS RIVER PENNAR IN NELLORE TOWN SPSR NELLORE DISTRICT INCLUDING FABRICATION OF GATES AND ELECTRICALLY OPERATED HOIST BRIDGE ARRANGEMENTS AND OTHER RELATED WORKS COMMISSIONING OF THE SAME AND MAINTAINANCE OF BARRAGE FOR TWO YEARS ETC
Fabrication, supply and installation of spare mechanical components and repairs to 10 Nos 20 Cum capacity Compaction Container with rear end guillotine door, mounted on 25 Ton GVW chasis with the help of a Hook Loader Equipment (HLE) at Garbage Transfer Station at Town Kotha Road of South Zone, GVMC
(1) Dismantling of 2 nos of existing 60 m3 clarifiers, 1 no of existing 25 M3 Horizontal balancing Tank (2)supply, fabrication, erection and commissioning of 2 nos of new 60 M3 clarifiers, 1 no. of 45 M3 Horizontal Balancing tank at Oil Palm Processing Plant, Pedavegi, Eluru district, A.P.
Fabrication, supply and installation of 6Nos Automatic Power Factor Control Panel (APFC) suitable for improvement of power factor to various Capacity Motors at Vijaya Nagar Colony, Y.V Rao Hospital, Veterinary Colony, Krishna Lanka, Srinivasa Nagar Bank Colony and Nagarjuna Nagar drainage pumping stations in Circle-III area. Rc.E3-120317/2025
Fabrication and supply of 3D layout topographic model of PS Veligonda Project size 5 9 X 11 6 with 8mm thick plywood base wooden frame polyster resin water proof colours and acrylic materials of high quality, MS 1 X 1 pipe stand of height 2 6 including all taxes and transportation
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms and tops of Unit 2 boiler during annual overhaul period for the year 2023-24
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms and tops of Unit 2 boiler during annual overhaul period for the year 2022-23
Replacement of eroded water wall tubes fin welding of water wall tubes metal build up on eroded portions of water wall tubes and coil tubes providing of carbon steel pads on water wall tubes and rectification of burner bottoms and tops of Unit 1 boiler during annual overhaul period for the year 2022-23
Indigenisation of software, hardware and fabrication of local control unit(LCU) Barak, Testing (MIL461E, JSS55555)
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #C&D pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
Lifting and Re erection of badly damaged and bent collecting electrodes, fabrication and erection of new supporting angles, cleat angles in ESP #A&B pass of any field of Unit -2 boiler, welding of U guides and carrying of alignment of collecting electrodes to maintain gap between collecting electrodes include all T&P and consumables for during the overhaul 2026-27
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2025-26
Replacement of failed RC feeder belts, failed bearings of take up pulley, head pulley, weigh span rollers, removing of coal on feeder conveyor belt, overhauling of feeder and bunker outlet gates and patch welding of PF Lines, Feeder outlet chutes, Replacement of defective Feeder Main drive & COC Drive Gear boxes as and when required during the year 2025-26
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2024-25.
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2025-26
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2024-25.
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2023-24.
Arresting HFO Tank-1 bottom leak, Repair to reconditioned HFO Tank-1 of dimensions 16Mtrs width, 12 Mtrs height bottom plate leak arresting duly placing new MS plate (10mm) removing and refitting the steam coils, joint grinding, DP Testing, welding and checking after leak arresting including MS plate, all consumables T&P during the year 2025-26
Rectifications of lighting circuits at higher elevations, maintenance of welding TB circuits of boiler 5&6 all floors, ESPs, TG floor, '0' meters, '5' meters elevation, Tranformer yard and compressor house , Annual Up keeping of Switch gear rooms and cable galleries,soot blowers of Unit 5 & 6, as and when required during the year of 2026-27.
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during Annual Overhaul period 2022-23.
Labour charges for major welding works of Bottom ash hoppers clinker grinder bodys feed gate bodys bottom ash conveying pipe lines of 200NB size from Bottom ash hoppers to ash pump house and Refilling of material for clinker grinder and gear box shafts of Unit-I and II as and when required for the year 2024-2025.
Overhaul works on Boiler pressure parts for replacement of eroded water wall ,DNP,SH,Platen SH tubes, carrying out cracked fin welding where ever required during D meter survey, Cleaning and clearing the debris and inspecting the orifices inside the Bottom ring Header of Boiler of Unit-7/Stage-IV/Dr.NTTPS during the Annual Overhaul 2021-22.
Special repairs to the road form Km 12/0 to 18/4 of Peruru-Errabenchi road in Anantapuramu District. Sub work: Fabrication supply and fixing of RCC, KM, HM stones, parapet walls, hazard markers and painting to all information boards etc., of Peruru-Errabenchi in from Km 12/0 to 18/4
Special repairs to the road form Km 7/0 to 12/0 of Peruru-Errabenchi road in Anantapuramu District. Sub work: Fabrication supply and fixing of RCC KM, HM stones, parapet walls, hazsard markers and painting to all information boards etc., of Peruru-Errabenchi road in Km 7/0 to 12/0
Commissioning of LDO piping up to Unit-3 Boiler fuel station includes Steam flushing of piping and overhauling of all connected equipment of Fuel Oil Pressurizing Pump House (FOPH) at Stage-2 & erection, fabrication of damaged roof sheet and painting of LDO Day Tank at Stage-2 including all paints & other consumables.
Repairs and reconditioning 2 nos of 60HP Air blowers for 600mm dia MS pipe line flanges with all accessories at 8MGD Filtration plant and 300mm dia Raw water diversion pipe line and fabrication of 340 HP HSC pump set bed No.4 at 16MGD clear water pump house in Head water works
Tender for 1) Dismantling of 2 nos existing 60 m3 of clarifiers, 1 no of 25 m3 Horizontal balancing Tank and 2) supply, fabrication, erection and commissioning of 2 nos of new 60 m3 clarifiers, 1 no of 45 m3 Horizontal balancing tank at Oil Palm Processing Plant, Pedavegi, Eluru district, AP.
Restoration of Right Main Canal & Head works with Ring Bund of Pincha Project near Pincha village H/o Mudumpadu (V) in T. Sundu Palli (M) of Annamayya District. Sub Work:- Supply, Fabrication, Erection, testing & Commissioning including all embedded parts of Service Gate & Emergency Gate of Right Main Canal Sluice of Pincha Project.
ok
SUPPLY OF E-7018 WELDING ELECTRODES OF VARIOUS SIZES FOR HP-1203 BOWL MILLS OF UNIT-IANDII BOILERS
REPAIR RATE CONTRACT (RRC) FOR REPAIR/FABRICATION OF SYSTEM PIPELINES FITTED ONBOARD OPERATIONAL SHIPS OF ENC
REPAIR RATE CONTRACT (RRC) FOR REPAIR/FABRICATION OF SYSTEM PIPELINES FITTED ONBOARD OPERATIONAL SHIPS OF ENC
REPAIR RATE CONTRACT (RRC) FOR REPAIR/FABRICATION OF SYSTEM PIPELINES FITTED ONBOARD OPERATIONAL SHIPS OF ENC
Design, fabrication, transportation, supply, erection and commissioning of out door type LT cubical main distribution board "Design, fabrication of 3phase and neutral 433 V, 4 wire, free standing out door/ Indoor type floor mounted LT Panel (distribution board ) with Double Door, made up of 14SWG CRCA sheet with suitable size MS angles & Panel internal partition/walls should be made of 16 SWG CRCA Sheet. including with indication lamps, multifunction energy meters, selector switches, Supply of 400A, 36kA, 4 pole microprocessor MCCB with adjustable over load protection -2Nos, 250A MCCB-4Nos, 63A MCCB-1No,400A changeover switch as per the enclose drawing; Accepted makes for MCCB and change over switch:- schneider electric,Legrand,ABB,Siemens or equivalent.
Different types of mechanical maintenance works of emergency nature (like replacement of pulleys , bearings , sleeves , overhauling of sump pumps , fluid couplings , geared couplings, fabrication of double plate scrappers rerailment of tripper structure and RPG gear boxes etc ) if necessray as and when required at MM-IV/CHP/MM-III/Dr.NTTPS during the year 2017-18
Fabrication Supply and fixing of RCC KM , HM Stones Repairs to culvert parapet walls Hazard Markers and painting to all information boards etc of Kuppam patchur road from km 0/0 to 14/4 under the main work of periodical maintenance from Km 7/2 to 10/2 of Kuppam Patchur road in Chittoor District