Loading…
Loading…
6,730 results • Best match
Repair work on the engine and transmission oil cooler, including dismantling, fitment, and replacement of the air seal and bolts repair of the seat and blade arm joint ball stud with material filling and fabrication of the A-frame for Dozer 13593
Repair work on the engine and transmission oil cooler, including dismantling, fitment, and replacement of the air seal and bolts repair of the seat and blade arm joint ball stud with material filling and fabrication of the A-frame for Dozer Sl. No.
Dismantling Fabrication and erection and fitting of ROM B/C, transfer B/C motor and gear box base frame structure repairing of fresh water shower pipeline for water sprinkling in both side hopper, crusher inlet and in different locations in P.C.H Sec
Miscellaneous repairing/fabrication of Endless Haulage Return pulley rope groove by M.S metal with main shaft new making and changing, repairing of MAMC 50 HP Endless haulage brake drum and its segment, and rope clip 05 nos. of 4, 5, 6 incline
Repairing Overhauling of Lathe M/C Sl.No.240 Make MK Enterprises at KNC(ii)and Complete Repairing and Overhauling of Radial drill Machine Make Jessop and Co. Ltd. KNC(iii)dismantling, installing and fabrication of base plate 300GPM Pump Motor 90 HP C
Making fire-fighting arrangement with accessories and rep./fabrication of partition frame of 28 KL water storage tank, cleaning of from i of the and pipes and inner painting tank of WS-28 Water Sprinkler Sl. No. 28205 at ASBNC OCP Sijua Area.
Alteration , remaking and fabrication of motor n pump foundation base frame for running 168HP, 550V motor and DSM-6 pump on the existing base frame including repairing of valves of different sizes and providing of tyre coupling at raw water side and
Fabrication/ making of boom foot pin and dipper eye pin 06 nos., Hoist foundation bolt M48 (1003/ 09/403) 10 nos. and Take up axle sheem 24 Nos. for EKG 5A Shovels Sl. No. HMB 581, 592 and 596 of Jharkhand OCP.
Repairing of railing assly both side and cleaning of Radiator, 2 nos Hydraulic oil cooler, 1 no Transmission oil cooler, fabrication of new Engine Guard and transmission guard, glass fitment in operator cabin in BH100 Dumper si no 1281 of KDH OCP.
Repairing of 133 B belt conv. deck plate,RGB 133 B2 chute platform fabrication and erection,RCB top approaching stair repairing,111 A1A2 and B1B2 under flow chute repairing of pre-washery,replacement of damaged liner plate in 303,304,307 B Conv of KW
Fabrication and making of incline mouth of receiving hopper and covering the top of crusher drum for containing the dust within the incline mouth and water spraying on the crusher drum for the dust separation of feeder breaker No3 of Muraidih Collier
Repairing/fabrication of Four (04) Nos tilt cover front of Dozer SL.No. 11667, 11794, 11834 and 11835 and repairing of Yoke Shaft one (01) No. /removal of broken bolts four (04) Nos etc of Dozer SL.No. 11834 of Kuya OCP, Bastacolla Area IX
New fabrication of water tank of capacity 12 KL (12000L) with 6mm MS sheet for water tanker use in spraying water outside the mine and providing drinking water for domestic use in colony and magazine at Tapin North OCP under Hazaribagh Area
For modification work for fitting main stacker assembly of other grounded drill in to DR-245, New fabrication of joy stick levers 7 nos. for fitting in modified stacker assly and repairing of sliding gate DR- 245 at AKWMOCP , KATRAS AREA, BCCL
1.5 T mild steel procurement, fabrication and site erection including painting only as per supplied detail drawing in all respect in coal tower #4 Lift Structure required for rebuilding of Coke Oven Battery No.8 at SAIL, Bokaro Steel Limited (BSL), B
Replacement of folding door 2 nos and dismantling folding door opening air system and old folding door and man winding cage. Fabrication new folding door manually system 2 nos and installation folding door and man winding cage of 1 pit of P.B Project
Repairing of worn out Eye Housing and its pin of Boom Cylinder and Boom Foot, Fabrication of Boom Foot Bushing and Crack repairing of Chassis mounting structure of Boom cylinder and Boom Foot Eye Housing of BEML Shovel, Sl.No.-G10122 of AMP colliery.
Rep. of track guard, fitting of undercarriage, rep. of drill platform, drill rod bush housing, break band supply, railing guard fabrication, radiator rep. of IDM 30 drill Sl. No. DR242 and radiator rep. of dozer Sl. No. 11839 at Nichitpur OCP, Sijua
Fabrication and installation of two nos. bus bar (4 nos. copper strip/flat) inside on 1.9x1.5x0.5 M size enclosed metal box with providing, fixing MCCB 800 Amp systematic power distribution to GM Office, filter plant and CISF Colony under GM Unit, NK
Fabrication of large size wear resistant metal hardness picks and fixing in gaps between the original picks and holder sets of main crusher roller of IR make Feeder Breaker in order to achieve maximum efficiency in crushed coal size installed at Tarm
Repairing of chassis mounting, replacement of bolts and making of holes for proper fitment of bolts and repairing of tilt guard and fabrication of tilt cover mounting bracket and repairing of top and bottom tank of Dozer sl. No. E12044 of ADIC Kusund
Replacement of worn out intermediate frame, dismantling of idler frame with c/rollers and r/rollers, installation of idler frame with c/rollers and r/rollers and installation and fabrication of intermediate frame unit no. 916 of PS-9 at Madhuban Co
A)Repairing, fabrication and erection of old worn-out delivery pipe from collector and shifting, changing of these pipes of unit no. 672 at 27 mtr level in Hydro Cyclone Section B)Shifting of motor from return water pump house to electrical workshop
Fabrication / Erection of top roller frame of different belt conveyors 40BC, 51BC by pass BC, Slurry BC, Clean Coal, Middling Coal BC and Clean Coal, Middling Coal Shuttle BC etc. work in Main Plant of Sawang Washery for a period of 06 months.
Complete fabrication of one no. (01) double-stack pontoon with a total of 80 drums (48 drums on top of the 32 drums at the bottom) for 2000 GPM motor installation at the new eastern side sump of JOCP in the Hzb Area.
Modification/fabrication of base plate and installation of 1 No 600 GPM pump set Joyrampur OCP near Chatkari Jore along with Laying and Joining of 6 inch dia 240 Mtr delivery range for fire fighting and dust suppression purpose of Joyrampur OCP under
250 KVA DG set with engine, 415 Volt, 1500 RPM Sl. No. 3222, Make-Jyoti Ltd. Collect from R R Shop, Kathara near base workshop Kathara Colliery and shifting, placement, positioning and erection of DG Set, fabrication and erection of its lifting arran
Fabrication and making of incline mouth of receiving hopper and covering the top of crusher drum for containing the dust within the incline mouth and water spraying on the crusher drum for the dust separation of feeder breaker No2 of KKC link siding
(A) complete repairing of rotating assembly of Make Flow More Ltd., 2 Stage, 250m Head, 3000 GPM, Sl. No. 22065717/10/06 (B) Fabrication of coupling (C) Repairing of Non-Return Valve and Sluice Valve of New Akashkinaree Colliery of Govindpur Area.
Repairing of steering booster assy.- 02 nos., radius rod assly.-02 nos., Tie rod assy. -01 no, rear suspension assly-01 no. and fabrication and fitting of A/C Pump base structure of WS-441 Water Tanker of Dahibari OCP,CV Area
Fabrication and errection of 6 number16 meter tubular pole with hexagonal cross arm and arrangement of it s controlling panel with fixing of 200 watt X 8 numbers departmentally supplied led lights in each pole along Fulbasiya siding line number 4 und
REPAIRING OF CRACK IN BOOM BOTHSIDES REAR IDLER CHANGE AFTER WALL REPAIRING REPAIR OF MAIN PLATFORM NEAR CROWD MOTOR STAIRCASE and CATWALK DIRT CHUTE REPAIRING and FABRICATION OF LADDER FROM SADDLE BLOCK TO BOOM OF P and H 2300XPA LR SHOVEL NO RS14
Fabrication and erection of 2 nos Hexagonal lighting frame structure on 15 mtr steel tubular pole including providing and fixing of 300w LED light fittings at road weigh bridge near Rajdhar railway siding and ln motion rail weigh bridge at sidhalu un
Fabrication of ripper boot, 02 nos. end bits, tilt cylinder and its tube guard, trunion cover and patch repairing of blade and its arm Also Repairing of both side suspension bogie assembly and roller mounting of D11T dozer D1 at Ashoka OCP Piparwar
Fabrication and Installation of 1.5 Mtr. Size Headgear Pulley and 02 No. 5/10 Girder lifting and Installation at 01 pit Headgear Top for lowering of 1000 GPM 200 m Head Submersible Pump set in 1 Pit Victory Section of Bastacolla Colliery.
(1) MAKING OF JOINTED PIPES(10incDIA 8inchDIA) AND FABRICATION BENDS(10in DIA AND 8in DIA) FOR DIFFERENT PLACE OF USED IN PIPE LINE OF WEST MUDIDIH OCP AT AKWMC UNDER KATRAS AREA (2) FARICATION OF 14 NOS.ELECTRC PIPE POLE OF 6in X8in MS
Painting, writing safety slogan and muffing of M.S. Board in Mine and fabrication of U Bolt, Nut and Washer and Sling rope for use in heavy duty Blasting Mat, to be used in blasting works, in Mine w.r.t. Karo OCP, under BnK Area
Repairing of final drive tandem 03 nos brake assy, blade assy and its holes, its both adjuster, bushing and fabrication of 04 nos edge, edge side and bit end, fuel tank foundation, collar, both brackets, in the Motor grader G4 at Ashok OCP.
Replacement of 3 lengths damaged pipeline near raw water pump house and fabrication of short pieces, bend, nipple of different sizes 4,6,8 inch along with providing of MS nut bolts and other miscellaneous items to be used in day to day repair
For repairing of operators cabin both side door and fabrication of new front glass frame and new safety glass fitting and minor repairing of platform and railing and complete machine painting of IDM 30 Drill DR-159 at AKWMOCP, KATRAS AREA, BCCL
1) Partial repairing and reconditioning 2000 GPM, single stage, spilt case, 250mm x 200mm size, UP-200/56 type pump assembly, Sl.no.-1748918012 pump in respect of JOCP 2) Modification/fabrication of base frame of one no. 1000 GPM pump installed at m
Fabrication of steel rack 05 nos. from steel plate, channel, nut- bolts using gas, denting, painting, primer etc for store material at site store arranging, tagging to same time in identification of material, rack size 8 high X 4 wide x 1.5 deep.
Fabrication back dala for shift truck along with shed and seating arrangement and running repairing work of tata truck bearing Regd. No-JH02AN-3499, Model BS-III(1613) for moving in every shift from, various location of Kuju Area to Karma Project.
Repair and replacement of pick and holder in primary crusher roller of black diamond and BWF make feeder breaker and fabrication of teeth type metal wear resistant picks and fixing in secondary crusher roller as when required for the period of one ye
Repair and replacement of picks and holder in primary crusher roller of Black Diamond and BWF make feeder breaker and fabrication of teeth type metal wear resistant picks and fixing in sec. crusher roller as and when required for BWF make FB
Repairing of Final drive gear - 02 nos., Final drive pinion - 02 nos., Crowd clutch gear - 01 no. and Crowd shaft gear cover - 01 no. and Fabrication of Final drive case cover - 02 nos. of EKG Shovel , Sl. No.- HMB-541 of Muraidih Colliery.
Replacing of BD 4000gpm pump motor set of Jharna face and 3rd patch sump and dismantling and transporting of 10inch dia and 8inch dia damaged MS pipe from different place of mine and transporting to attendance room premises for fabrication of bend sh
Fabrication of Suction and delivery pipelines, matching, moving flange and nipple etc for installation of 2000GPM Flow more pump and 1000GPM 150 mtr head of 3 CHR pump of Mand P make for dewatering of mine water at Karma project under Kuju Area.
Replacement of wornout deck frame and deck plates, carrying and return rollers, installation of idler frame and fabrication and erection of same at unit no. 201-2 belt conveyor, Baghmara side of ROM section at Madhuban Coal Washery under Block-II ARe
Fabrication of 16teeth 2nd motion drive HELICAL GEAR pinion shaft for conveyor chain drive gear box assembly of Elecon Make KCN-355,Sl.No. WHG38218, Input 1450RPM output-71-1 RPM for Black Diamond make feeder breaker installed at Tarmi siding of SDOC