Loading…
Loading…
2,035 results • Best match
Welding Rod for Manual Metal Arc Welding of Carbon and Carbon Manganese Steel as per IS 814 (Q3)
Welding Rod for Manual Metal Arc Welding of Carbon and Carbon Manganese Steel Experience Criteria 1 Year (s)
Welding apron (Q3), thermal gloves (Q3), Miner'S Safety Goggles-IS:14352 (Q3)
FABRICATION OF UNIT ACTIVATION BOARD
Towing Tender (Chassis+ Fabrication) (Q3)
Procurement of PCB fabrication unit
Fabrication Mini Motor Fire Engine
Fabrication of towing Tender (Q3)
FABRICATION OF PLYWOOD CABINET STORAGE
Fabrication & Supply of Doctors Blades
Fabrication of removable unloading platform
FABRICATION AND POLISHING OF ITEMS
SINGLE PAD ARRAY PCB FABRICATION
Procurement of special fabrication part
FABRICATION OF CYBER SECURITY INFORMATION
POLISHING AND FABRICATION OF ITEMS
FABRICATION OF ENCLOSED ALUMINIUM PARTITIONED
FABRICATION OF FLIGHT SAFETY STICKER
All-Terrain Vehicle with Fabrication
Mini Rescue Tender (Chassis+ Fabrication)
FABRICATION OF PLYWOOD CABINET STORAGE
Fabrication of Weighbridge Platform (9MX3M) Complete with beams and plate including cutting, welding and jointing etc as required for the replacement of Static road WB-01 Kanika Platform Structure at Garjanbahal OCP of Basundhara Area
1.96002011560 WELDING ELECTRODE E-900 4MM DIA (Q3), 2.96002005150 FINALLOE AST 1018G(4MM) WELDING ELECTRODE (Q3)
Plastic Welding Machine with Hot Air Gun (Q3), Water Cooled Induction Welding and Brazing Machine (Q3)
Welding Electrode, E7018, 4 MM X 450 MM, 3.15MM X 350MM, 2.5MM X 350MM, E6013
Welding Electrode, Hard Facing, 4 Mm, Din En: 14700: E Fe 3, 50 Hrc Min
Down Draft Welding Table (Q3), Combination Plier Insulated (Q3)
Copper Welding Wire, Purity: 99.5% min. confirming to TS/418-99, Dia. 02mm
Fabrication, Testing & Supply of CS glass lined steam jacketed evaporators, Capacity: 500 Ltrs.
AR based Welding Simulator, 230 V, 50 A-240 A (Q3)
Fabrication of structural steel at Howrah workshop including semi built-up sections, plate girder type members including fixing of jigs and fixtures to prevent deform action and undue thermal stress during welding as per drawing
FROM B and R / CLIENT STORE TO FABRICATION YARD, CUTTING, STRAIGHTENING, BENDING, EDGE PREPARATION, CLEANING, PREHEATING, BOLTING, ASSEMBLY, WELDING, LOADING and TRANSPORTATION OF FABRICATED STRUCTURE TO BLASTING and PAINTING YARD AT NALCO, DAMONJODI
Spl.Repair such as Extension of Portico using Tensile Fabrics roofing with Steel Structure in front of Mission Director NHM Odisha, Nayapalli Bhubaneswar for the year 2023-24
CORRIDOR FURNISHING AND Furnishing of COE welding
BOQ (Q3) (BOQ 1 FOR RECTIFIER WELDING)
SPARES FOR ATE MAKE SPOT WELDING MACHINE
Automatic Argon Arc (Orbital) Welding Machine (Q3)
welding booth with fume extractor system (Q3)
FLUX HARD FACING FOR SUBMERGED ARC WELDING
Welding Helmet as per IS 5983 (Q3)
RAW MATERIAL FOR OJT IN ADVANCE WELDING
welding booth with fume extractor system (Q3)
RECTIFIER/INVERTER BASED THREE PHASE WELDING MACHINE
Welding Helmet as per IS 5983 (Q3)
Procurement of junction box and welding socket
COPPER COATING MIG WELDING WIRE 0.8mm -FV42