Loading…
Loading…
4,930 results • Best match
Supply fabrication and erection of Structures, erection of Equipments, Providing earth bore earth mat, cable laying and termination etc., for establishment of 110/22 KV SS at Pudukottai (Kettimedu) in Namakkal EDC
Labour charges for supply, fabrication, erection of 110 KV Lattice structures, for making LILO arrangements for dual source at existing Kothagiri 110/11 KV SS in Nilgiris EDC in Coimbatore Operation Circle.
STORAGE TANK AND ASSOCIATED EQUIPMENT WORKS INCLUDING DESIGN,DETAIL ENGG,SUPPLY,FABRICATION,ERECTION, TESTING,CALIBRATION,PAINTING,INSULATION,ETC.FOR MECHANICAL WORKS PKG(EPC) FOR SETTING UP GRASSROOT LUBE COMPLEX AT VILLAGES AMULLAIVOYAL,VAIKKADU
Custom Bid for Services - NDT Skilled Supervising Activities for ATP-BARC, ATP-NPCIL & IBR Documentation for Sub- Assemblies Fabrication of Steam Generators and Fossil Boilers at BHEL Trichy Similar Category Support Services
Attending general cleaning and daily maintenance works in Compressor House and Monitoring Attending Patch welding works in fly bottom ash conveying lines reconditioning of wornout bends spool pieces dismantling the wornout expansion joints Bellow j
TTPS Operation Circle MPM II Unit-IV Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 08.04.2021 to 30.09.2021
TTPS Operation Circle MPM II Unit-V Attending to preventive and breakdown maintenance works like renewal of wornout grinding elements, ring roll setting, carrying out patch welding in coal pipes etc., from 08.04.2021 to 30.09.2021
NCTPS I OPERATION CAD RWPH Attending to preventive and breakdown maintenance works in RWPH such as welding overhauling of pumps etc for a period of 6 months from the date of taken over of site
MTPS I BM Unit II AOH 2019 FG Duct B side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding etc.
Fabrication and Supply of CARBON STEEL HEADERS, P12 (Alloy Steel) HEADERS and P91 HEADERS (Pressure Parts Items) with free issue of BHEL Materials (OSB) and despatch of Finished Goods to respective project Sites.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Contract on Fabrication and Erection of CS, SS Structures in KK-3&4; As Per Scope of work; As Per Scope of work
Provision of 4 inch LPG Pipeline for transferring product from Blending area in terminal to Bottling plant LPG Bullet including supply, fabrication, erection and commissioning at LPG Bottling plant inside IPPL Ennore terminal.
Supply, fabrication and erection of Structures, erection of equipments and Auxiliaries, providing earthing system, structural plinths, cable duct and other allied electrical and Civil works for enhancement of existing Power Transformer capacity from
Its a Sub contract basis in connection with Fabrication, erection, testing ,commissioning of Above ground ,Underground Mild Steel Storage Tanks at proposed Grass root Petroleum Storage Terminal of IOCL Vallur, Chennai, Tamil Nadu
In-situ modification and Erection of Carbon Steel Ducting (including supply and fabrication), Carbon Steel Piping Stainless Steel Piping, Structural Supports, Anti Corrosive Painting and Erection of associated Ventilation Equipments and newly introdu
Supply of iron and steel materials, fabrication, erection of earth mat, earth electrode, erection of 110kV equipments, 11kV Indoor VCBs, cable laying and termination etc., for establishment of Purvankara 110 KV Indoor SS
Fabrication, Supply & Installation of Conveyor Cross overs at Chennai LPG Plant (CRFQ No. 1000411229) TENDER DUE DATE & TIME 13.11.2023 AT 14:00 HRS TENDER OPENIG DATE & TIME 13.11.2023 AT 16:00 HRS VERIFIED.
Fabrication and erection of pipe line and pump from TWAD Board 20 MGD inlet pipeline of GLR I to contact tank I for pumping raw water to RO Plant in DM Plant I
Mettur workshop Line Materials Section IV Gas Cutting of MS Channel Cleat ISMC 100X50 mm for a length of 65mm for fabrication of HTTI LTTI Fittings including stacking at Central stores 48000 Nos
Mettur workshop Line Materials Section IV Gas Cutting of MS Channel Cleat ISMC 100X50 mm for a length of 65mm for fabrication of HTTI LTTI Fittings including stacking at Central stores 48000 Nos
Welding Electrodes SS, 1 X 2 GI Square Pipe inch, GI Square Hollow pipe 1 inch, 3 4 GI Square pipe, Nylock nut and bolt, Grinding Wheel, Cutting Wheel1, Electrodes, WD-40, Argon gas, Nitrogen gas
EM Division MTPS-II 1x600MWEM Division Providing additional welding points at various locations of Boiler and providing power supply to the redundant reheater spray station MOVs in Boiler Scrapping Cleaning and Painting of Ash Silo T
Fabrication,supply, erection and commissioning of Big Boiler cum cooker, semi - automatic cashew cutting machine hand using cashew cutting, cashew drier, cooling machine and trolley, peeling machine, piece separator for Kurinchipadi PPC in Cuddalore
110KV Structure modification and bay shifting work for foundation plinths fabrication erection of structures Equipments like 110KV Breaker CT LAS of 110KV Pasumalai-Kinnimangalam III feeder and110KV Pasumamalai sembatty feeder in 230kv pasumalai ss
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, Providing earth bore, earth mat and earth electrode, cable laying and termination etc., for establishment of 110kV SS at Elur
Supply of Iron steel materials, fabrication, erection of structures, Erection of earth mat, earth electrode, Equipments, Panels, etc, for erection of additional 1 No. 100 MVA, 230kV Auto transformer at existing Vinnamangalam 230kV SS
Dismantling the Existing wornout Main Drive Pulley and Take up Pulley Shafts fabrication and machining of new shaft and Reassembling into the existing Main Drive Pulley and Take up Pulley during the AOH 2025
Providing 230 KV side equipment plinth, supplying fabrication and erection of 230 KV lattice equipment structure for the proposed Vembakkam 230/110 KV SS in the premises of the existing Vembakkam 110 KV SS
Fabrication of 250NB 300NB 350NB 400NB MS ERW bends with SS liners inside or outside MS Box cover various degrees and fly ash AB and CD pass conveying Pipe lines in Ash Handling system
FABRICATION, ERECTION, TESTING AND COMMISSIONING OF MILD STEEL VERTICAL STORAGE TANKS, PETROLEUM PRODUCT and FIRE HYDRANT PIPING, CONSTRUCTION OF PLANT BUILDINGS AND ALLIED WORKS FOR THE UPCOMING PETROLEUM STORAGE TERMINAL AT ASANUR, TAMIL NADU.
Facility Management Services - LumpSum Based - INDUSTRIAL, Igcar Indira Gandhi Centre For Atomic Research; O&M of Mechanical Work, Providing Technical assistance for RpG, Fabrication, Machine shop and Mechanical Services; Consumables to be provided b..
Custom Bid for Services - CPCLH25183-Development, Fabrication and Supply of Exchange Test Rings during Ref- I/LEB M&I shutdown at CPCL Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
Custom Bid for Services - Supply, Fabrication & Erection of Seal Plates, Chequered plates and 50mm angles, Handrails, Toe guards in place of existing structures in the conveyors of CHS of NTPL Similar Category Support Services
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Execution of Removal and re laying of cable, Termination, Installation of MV distribution panel boards and Transformers, fabrication and installation of s..
NCTPS I SE MI circle AMC 26 27 TM Dn Unit I II III Attending minor defects and upkeeping of condenser front and rear connecting bends priming pump areas and debris filters and attending breakdown welding works
Applying two layers of Ceramic wear coat Eromat at inner surface of mill outlet coal bends and patch welding of punctured damaged portion of mill outlet coal bends coal pipe released from coal mills C E F
Maintenance works in 22KV /415V, HT/LT supply system and welding supply system attending defects and routine maintenance works in electrical installation under jurisdiction of Site Fuse Off Call section for the period from 08.04.2022 to 30.09.2022
GTAW Filler Rod for welding of Super 304H material SA213 UNS S30432. Diameter 2.40mm and 1000mm long in accordance with WCPI-128/00. Imprinting/embossing at both the end of the rod is required for positive identification.
Applying two layers of Ceramic wear coat Eromat at inner surface of mill outlet coal bends and patch welding of punctured /damaged portion of mill outlet coal bends coal pipe released from coal mills G and H
Construction of 4 class rooms and 2 Laboratory Buildings and Construction of center of Excellence Technology lab building in existing second floor of welding section and plastic processing Laboratory in TN, GPTC at Madurai in Madurai District.
NCTPS I SE MI circle AOH 24 25 TM Dn Unit I III Renewal and removing the dislocated SS partition plate complete grinding of edges for smooth finishing rectification of SS partition plates strengthening and complete welding
Applying two layers of Ceramic wear coat Eromat at inner surface of mill outlet coal bends and patch welding of punctured damaged portion of mill outlet coal bends coal pipe released from coal mills A B D
Maintenance works in 22KV /415V, HT/LT supply system and welding supply system attending defects and routine maintenance works in electrical installation under jurisdiction of site fuse of call section for the period from 09.04.18 to 30.09.18.
TTPS Mech II TM I Breakdown maintenance of regenerative system and welding of associated pipe lines in unit I II III for the period of work on or after 08 04 2019 and upto 30 09 2019
Unit III - Removal of ash accumulated over the mechanical dust collectorand welding the eroded weld joints in the mechanical dust collector path A, B, C and D and suction side duct of ID fan A and B
NCTPS I SE MI circle AOH 25 26 BM Dn Unit II Rectification of Damaged sagged Radiant roof tubs by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing
Monitoring and Attending Patch welding works in fly bottom ash conveying lines reconditioning of worn out bends spool pieces dismantling the worn out expansion joints Bellow joints and flanges joints renewing and reassembling the joints to resume the
NCTPS I SE MI Circle AOH 24 25 BM Dn Unit III Dismantling and refixing of 18 mtr spray station valve pipe line impulse line cutting removal and including grinding edge preparation same to be welding stress relieving
MTPS- II Mill Plant Division Reconditioning and strengthening of existing worn out Nozzle ring using EN 19 strip plate by welding and levelling the undulance Nozzle surface in coal mills B C F H during AOH of 2025
GTAW ROD DIA2.40MM For T92/P92 LOW ALLOY STEEL BARE SOLID FILLER ROD FOR GAS TUNGSTEN ARC WELDING FOR SA213T92 AND SA335P92 MATERIALS.DIAMETER 2.4 X 1000 MM LENGTH WITH EMBOSSING/ENGRAVING AT BOTH THE ENDS FOR POSITIVE IDENTICATION.