Loading…
Loading…
4,930 results • Best match
MTPS I BM Unit II AOH 2019 FG Duct A side Renewal of Deflector plates renewal of duct supports renewal of guard plates over the expansion joints renewal of splitter plate and patch welding the eroded portion etc
Facility Management Services - LumpSum Based - Industrial; O&M of Mechanical Work, Weld overlay or buttering or metal buildup by Gas Tungsten Arc Welding process for rectification of wall thinning in boiler, pressure vessel, piping OR Primary Heat Tr..
MS Square Tube, MS Sheet, MS 12mm rod, SS Door hinges heavy duty 2 inches, SS Door latch 16 mm x 300 mm, MS Flat, MS Angle BOQ Title BOQ BID FOR Door Fabrication Material
NCTPS I SE MI Circle AOH 24 25 BM Dn Unit III Fabrication Supply and Erection of ID fan casing Top Portion of model NDZV 31 SIDOR during Annual Overhaul for the year 2024 25
Fabrication of 250NB 300NB 350NB 400NB MS ERW bends with SS liners inside or outside MS Box cover various degrees and Y pieces for Bottom Ash B stream conveying Pipe lines in Ash Handling system
Supply (supply-I), fabrication and erection of structures and substation auxillaries, earthing system, painting of structures on 110 KV side and providing retaining wall on west side for the proposed Kallapalayam 110 / 11 KV substation
Supply of Iron steel materials, fabrication, erection of structures, Erection of earth mat, earth electrode, Equipments, Panels, etc., for enhancement of existing Auto transformer capacity from 2x100 MVA to 3x100 MVA at Deviakurichi 230kV SS
Supply of Iron and Steel Materials, fabrication,erection of Structures, erection of equipments, providing earth borefor 110 KV feeder bay extension at Elanagar 110 KV SS for the establishment of Nallur 230 /110 KV SS.
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, providing earth bore, earth mat and earth electrode, cable laying and termination etc., for establishment of 110kV SS at SIPCOT Gurubarapally.
SSE works - Supply of Iron steel materials, fabrication, erection of structures, Erection of earth mat, earth electrode, Equipments, Panels, etc., for Establishment of New 110 kV Indoor AIS SS at Tondairpet CDH Complex in Chennai
Work Contract for Electrification of Control room of newly proposed Southern Avenue 33 11kV Indoor SS and Labour Transportation works of Breaker Fabrication and erection works of Adaptor GI tray Battery battery Charger Earthing arrangement
Work Contract for Electrification of Control room of newly proposed MKB nagar Indoor SS and Labour Transportation works of Breaker ,Fabrication and erection works of Adaptor GI tray Battery battery Charger Earthing arrangement and S
TNPDCL- Work Contract for Electrification of Control room of newly proposed Paruthipattu 33 11kV Indoor SS and Labour Transportation works of Breaker Fabrication and erection works of Adaptor GI tray Battery battery Charger Earthing arrange
Providing 400 KV and 230KV side equipment plinths , 400KV 1X500 mva ICT plinth, supply, fabrication and erection of 400 KV and 230 KV lattice equipment structures and allied civil works in 400 KV Sriperumpudur substation
Supply of iron and steel materials, fabrication, erection of structure, erection of earth raisers, erection of equipments, laying of control cable etc., for establishment of 230/110KV SS at existing 110 KV vembakkam SS Premises.
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, Providing earth bore, earth mat and earth electrode, cable laying and termination etc, establishment of Kovalam 110kV SS at Thiruvidanthai village
Design, engineering, fabrication, assembly, Inspection and testing at Manufacture at sub vendors works, supply, storage, erection, testing, commissioning and 3 months of O and M including all Civil, Mechanical, Electrical, CandI on EPC for EnSEZ
Tungsten Inert Gas (TIG) Welding Equipment as per IS 9604:1994 (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6500918 Dated : 26-08-2025 Bid Document 1/9 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Custom Bid for Services - 1 Carrying out masonry patch up repair works such as repairs to wall flooring ceiling like plastering concreting flooring tiling using cement mortar cement concrete Quantity 100 Unit Per day, Custom Bid for Services - 2 ... out fabrication erection ... of steel structures Quantity ...
MRTS Phase II Extension from VLCY to STM - Miscellaneous works for attending CRS Inspection compliance - Positioning of existing elastomeric bearings at PSC/U Type girders to correct level - Placement of MS plate/Shims over pedestals to maintain ... - Fabrication and ...
Supply, Fabrication, Design and installation of custom 3D railway themed wall mural made of high density high moisture resistant wood boards. The boards must be 3D carved, artistic coloured paint fixtures, integrated with clear lighting effects, waterproof finishing with clear coat application. The scope includes four mural of WAP-5, WAG-7, WAP-7 and WAG-9 locomotive general diagram There must be four LED boards at bottom of each locomotive indicating population which must be changeable by user in future. Total area would be 92 feet approx.
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Renewal of Passing MSSV left by reconditioned MSSV valve including cutting grinding welding stress relieving and commissioning the valve during Annual Overhaul for the year 2025 26
Boiler 2nd pass Cleaning of Boiler tubes thickness survey Surface preparation metal Filing by arc welding in the eroded portions of the boiler tubes Renewal of defective boiler tubes bends and Fixing Strengthening of shrouding plates if required an
NCTPS I SE MI circle AOH 25 26 MPM Dn Unit II Mills 2E 2F Dismantling and lowering of MDVs MPOs Mill outlet Elbows and Classifier Blades Patch welding in wornout portion and dismantling of centre Coal Feed Pip
NCTPS I SE MI circle AOH 25 26 BM Dn Unit III Rectification of Damaged sagged Radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet
MTPSI ES Circle EM-II Division Boiler and Mill plant area Temporary provision of LT welding panels at Boiler Mill plant area and releasing of power cable Neutral links for inspection refixing the power cables neutral links after cleaning
TTPS Mech II BM Attending flue gas leak by removal of ribbed sheet, insulation skin casing fin welding providing new skin casing, re insulation fixing of ribbed sheet etc from 34 mtr elevation to 52 mtr elevation in I
Fabrication and erection of 200 KVA Lighting Transformer with distribution panel and providing power supply arrangement for 10 Nos of 2 Ton capacity Split A C units Plug points and Lighting in Unit I DCS room
Supplying, Loading and Transporting of Iron and steel materials, fabrication and erection of Structures, and Equipments, Providing earth bore, cable laying and termination etc. for erection of 1 No, 110 KV bay at Uddanapally 230 KVSS.
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, providing earth bore, earth mat, cable laying and termination etc., for establishment of 110 to 33 KV indoor Sub Station at Kattavakkam.
Work Contract for Electrification of Control room of newly proposed Pudupet 33/11kV Indoor SS and Labour Transportation works of Breaker Fabrication and erection works of Adaptor GI tray Battery battery Charger Earthing arrangement and Sun
Supply of Iron and steel materials, fabrication and erection of Structures, Erection of Equipments, Providing earth bore, earth mat and earth electrode, cable laying and termination etc, establishment of 110kV SS at SIPCOT Industrial Park, Tindivanam
Provision of Emergency Trip rod arrangement by Fabrication of Driving tool piece, Bearing support piece, Tandem Rod, Operating Rod, Electroplating works, Fixing of Emergency Mechanical Trip Device and Checking the operation in 6.6 kV HT breakers
Design, engineering, fabrication, assembly, Inspection and testing at Manufacturer works, supply, storage, erection by Roll on Roll off basis, testing and commissioning of Shore Unloader Package including all Mech, Elect, Inst works on EPC for EnSEZ
Mettur workshop LM VI section Gas cutting of M S Channel ISMC 100 50 to a length of 2135 mm for the fabrication of 5 Feet V Channel cross arms to a quantity of 8000 Nos
Fabrication and supply of MS Guarding Cross Arm Channel 75x40x6mm Total length1900mm Slot Hole 36x18mm Hole dia18mm, Hole should be made from 40mm from one end of the 40mm side of the channel Weight 12.3 Kg
Removing of old refractory inspection of buck stay Strengthening of buck stay by welding renewal reconditioning of cotter pin Renewal of damaged buck stay leveler beam with new leveler beam applying new refractory in required buck stay and HRA Front
NCTPS I SE MI circle AOH 24 25 BM Dn Unit III Rectification of Damaged sagged Radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet in penthouse
NCTPS I SE MI Circle AOH 24 25 MPM Dn Unit III Mills 3A 3C 3F Dismantling and lowering of MDVs MPOs Mill outlet Elbows and Classifier Blades Patch welding in worn out portion and dismantling of center coal feed pipe
MTPSI ES Circle EM II Division Boiler and Mill Plant areaTemporary provision of LT welding panels at Boiler Mill Plant area and releasing of Power cable Neutral links for inspection refixing the power cables neutral links after cleaning in the etc
NCTPS I SE MI circle AOH 25 26 BM Dn Unit I Rectification of Damaged sagged Radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet in penthouse
MTPS I TM UNIT I changing the eroded control valves reducers Expanders pipes and bends and defective 1 and 2 drain line and vent line valves by IBR and Non IBR welding in Unit I during high bearing vibration problem r
NCTPS I SE MI circle AOH 25 26 TM Dn FWS Hydraulic Test of HPH LPH tubes and Inspection and identification of tube puncture in nest plugging the punctured tube and welding and Renewal of gaskets in water end manhole door
BM AOH Buck stay Removing of old refractory inspection of buck stay Strengthening of buck stay by welding renewal reconditioning of cotter pin applying new refractory and Renewal of damaged buck stay leveller beam with new leveller beam and its all
Buck stay Removing of old refractory, inspection of buck stay Strengthening of buck stay by welding renewal reconditioning of cotter pin applying new refractory and Renewal of damaged buck stay leveller beam with new leveller beam and its allied wor
NCTPS I SE MI circle AOH 24 25 BM Dn Unit II Rectification of sagged radiant roof tubes by cutting lifting hot correction welding and locking its original position plastering of refractory and rectification of skin casing sheet during annual overhaul
NCTPS I SE MI circle R and M 25 26 BM Dn Cutting Unit II ESP Columns Retrofitting of severely corroded damaged ESP Column structure and bracings by dismantling of corroded damaged portion and fixing welding of fabricated structure as original
NCTPS I SE MI circle AMC 24 25 TM Dn Attending minor defects and upkeeping of condenser front rear connecting bends priming pump areas and debris filters and attending breakdown welding works in all seawater ACW lines condenser debris lines
NCTPS I SE MI circle AOH 24 25 TM Dn Unit I III Hydraulic Test of HPH tubes and Inspection and identification of tube puncture in nest plugging the punctured tube and welding and Strengthening of thinned out HPH shell
Maintenance works in 22KV 415V HT LT supply system and welding supply system attending defects and routine maintenance works in electrical installation under jurisdiction of Site Fuse Off Call section for the period from 08 04 2020 to 30 09 2020