Design, Fabrication, Supply, installation and commissioning of Control Desk and Centralized Remote operation and fault identification system all along the P&M and for 3.0 KMs length of complete Conveyor system with 3 years AMC, after completion of warranty period at SRP OC-II expansion project, Srirampur Area as per the Scope of work, Terms and Conditions of NIT
Design, Fabrication, Supply, installation and commissioning of Control Desk and Centralized Remote operation and fault identification system all along the P&M and for 1.0 KMs length of complete Conveyor system with 3 years AMC, after completion of 2 years warranty period at CHP, Srirampur Area as per the Scope of work, Terms and Conditions of NIT
BTPS - CHP - Replacement of New/Reconditioned rollers & Frames, fabrication and erection of skirt rubber, flap gates and diversion plates etc for periodical and breakdown maintenance of belt conveyors as and when required for the BW conveyors BCN-6A/B, 7A/B, TP-5, ILMS 3&4 and Tripper from 01.04.2024 or actual date of commencement of work to 31.03.2025
BMD-Bending, fabrication & Erection of the damaged/worn-out portion of guide vanes, Repairing and Replacement of gusset plates & Bracing pipes, Replacement of damaged duct plates and repairing works of Honey combs in ESP AB Common Pass ducts, ESP A pass and B Pass flue gas ducts of 1x600MW KTPP Unit during Annual Overhaul of 2023-24.
Providing footpath from Sri Sai Krupa fabrication to Glass factory road in 103- Borabanda Division Ward- 8B, Div-10C, CZ, GHMC Change of site proposed for the work of Providing footpath for newly laid VDCC road from Society office to Borabanda Kaman in 103- Borabanda Division, Div-19, Serilingampally Zone, GHMC (Reserved for SC, ST, Waddera Labour societies)
BMD-Replacement of damaged duct plates, Repairing & Replacement of Gusset plates & Bracing pipes and Repairing works of Honey Combs and Bending,Fabrication & Erection of the damaged/worn-out portion of Guide vanes in ESP CD Common Pass ducts, ESP C and D Pass Flue gas ducts of 1*600 MW KTPP Unit during Annual Overhaul of 2023-24
Providing new panel board with fabrication supply and erection of 400 amps 4 pole MCCB, 250A 4 pole MCCB 63A 4pole, MCB, 160A 4pole MCCB and necessary accessories of cubical panel board for 120HP pumpsets two nos at Aliabad campus in place of existing damaged under Electrical & Mechanical Section, EAM Cell-IV of Operations and Maintenance Division-II(B)
Replacement of damaged rollers, fabrication and erection of skirt rubber, flap gates and diversion plates etc. for periodical, breakdown and preventive maintenance works as and when required for the conveyors BCN-6A/B, 7A/B, TP-5, TP-4 TPR 1&2 and bunker floor, from 01.04.2023 or actual date of commencement of work to 31.03.2024
FABRICATION,SR,RT,SHOT BLASTING, PAINTING AND MACHINING OF ELEMENT,PEDESTAL,FOUNDATION RING, HEAD GAER TO AND BOTTOM
Design, Fabrication, Testing and supply Twin Gun electron beam melting unit of 600 KW Power along with spares.
Fabrication and Machining of FR6B,BASE BASIC FAB MACH-TURBINE as per attached SCOPE of WORK and Drawings.
Please refer tender document
Tubular Model of Fuel system Tk T-90., Fabrication of LED Board for Lubrication system of Tk T-90.
Carrying out the fabrication of tube sleeve for the Seal Air Fan Stud in Unit-2 NTPC Telangana Project
Multi-Layer RF PCB Fabrication - IPC class 2 (as per the specs and drawing attached with RFQ-25 Nos.
MANUFACTURE AND SUPPLY OF PFBR FSA UPPER PART COMPONENTS (Q3), FABRICATION AND SUPPLY OF PFBR FSA LOWER PARTS (Q3)
Machining of Balancing Sleeves, Shaft Coupling, Bearing Sleeves, Packing Sleeve, Fabrication and Machining of Casing Ring of pump MDG406
Fabrication, 3 Pole MCCB, Spider links, Bus Bar, Insulators, KWH meter, Exhaust system, Dg set dismantling assembling, Shifting, Miscellaneous
BTPS - CHP - Erection of rubber bellows for ring granulators, Fabrication and Replacement of chute liner plates, Chute patch welding at coal hitting areas for all chutes and greasing to all bearings, scoop couplings, geared couplings, gear boxes, Carden shafts belongs to crusher, VGF, BF and Flap gates in MM-II sub division of MM/CHP/BTPS for the period from 01.04.2026 or actual date of commencement of work to 31.03.2027.
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS Liner plates to the hitting areas of discharge chutes, patch welding for the conveyor BCN-9 connecting chutes at BCN-6AB, 7AB, TP-5, ILMS and Tippers in MM-III sub division of CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
Secunderabad Division Electrical Maintenance Department - Schedule -A - Provision of rooftop solar plants of different capacities along with cleaning accessories on Station buildings, Cover over platforms, Service buildings , residential buildings ... for welding transformer ...
Design, Fabrication & Supply of Autoclave Dewaxing Boiler System, Erection and Commissioning of Autoclave Dewaxing Boiler System, Two years Recommended Spares
Providing hand railings along the steps, fabrication of stainless steel dustbins, strengthening the existing earthen pathways, providing wooden ramp etc.,
Smoke tunnel experiment - wing model with smoke flow, Design fabrication and wind tunnel testing of nature fiber hybrid composite wing
Repairs to weir, supply fabrication and fixing of shutters to sluices of pedda cheruvu near Maripeda (V , M ) Mahabubabad Dist
olid Waste Management Machinery and Equipment with total fabrication and required civil works for Miryalaguda Municipality under SBM/15th FC
Laying of CC bed, construction of new brick wall, masonry chamber for the earth pits at 11KV/0.44KV sub station yard, construction of brick masonry compound wall, toilet near 65KLD mini STP area, fabrication of new MS grill at cellar area with necessary accessories at front and rear admin building block under building and vehicle maintenance Sub Division in UFW Division
Fabrication and Erection of MS supporting channel structure along with new Cable trays from entrance of crown adit Tunnel gate to Column No 28 of Service Bay of EL + 154.00Mt (U/S side of EOT Crane Beam) for running of armored cables for supply to the Emergency Distribution Panel Board (EMDB) to be installed at EL + 157.00Mt (4th Floor) of Power House, SLBHES.
BTPS-CHP-Replacement of New/Reconditioned rollers & Frames, fabrication and erection of skirt rubber, flap gates and diversion plates etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyors BCN-4A/B, 5A/B, BCN-10, TP-3, TP-4 and ERH for the period from 01.04.2024 or actual date of commencement of work to 31.03.2025
Dismantling of Old Damaged 1Mtr Height 3-Tire Hand Railing Erection of new 1Mtr Height 3-Tire Hand Railing towards surge side at EL183M Fabrication of safety enclosures and repair/strengthening works to 12mtr length 2-stage MS ladder for all units, Diversion of Draft Tube air vents in DT gate groove in the Surge Chamber at SLBHES, Srisailam Dam West
BTPS - CHP - Replacement of New/Reconditioned rollers & Frames, fabrication and erection of skirt rubber, flap gates and diversion plates etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyors BCN-3A/B and ILMS 1&2 of Sec-III of MM-I/CHP for the period from 01.04.2024 or actual date of commencement of work to 31.03.2025.
Installation of 60 Cu Mtr capacity new CS tanks and associated piping fabrication and laying work at Main Plant of HWPM
Installation of 60 Cu Mtr capacity new CS tanks and associated piping fabrication and laying work at Main Plant of HWPM.
Welding Cable (V2) as per IS 9857 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6931381 Dated : 05-12-2025 Bid Document 1/8 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 367500 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Portable Welding Machine (V2) (Q3) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Bid Number : GEM/2025/B/6292049 Dated : 05-06-2025 Bid Document 1/7 Time allowed for Technical Clarifications during technical evaluation 7 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Post Dispatch Name of the Empanelled Inspection Agency/Authority DRDO Auto CRAC Days 60 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : The Director DMRL, P.O. Kanchanbagh, Hyderabad-500058 (Director) Splitting
Welding Cable (V2) as per IS 9857 (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6623423 Dated : 04-09-2025 Bid Document 1/5 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
Repair and Fabrication of pipelines in Exchange Units, Drain Pit area, ISG, Flare System, H2S Generation Unit in Main Plant of HWPM
EPC FOR DESIGN, SUPPLY, FABRICATION ERECTION OF INDUSTRIAL SHED FOR EXTENSION OF DE EF BAYS OF WPM THROUGH PEB SYSYTEM AT MIDHANI
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-3A/B and connecting chutes at TP2 and Contingency -1 and 2 chutes as and when required in sec-III of MM-I Sub division of MM/CHP/BTPS for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026.
BTPS - CHP - Erection of reconditioned/fabricated dummy MS plates and SS liner plates to the hitting areas of discharge chutes, patch welding for the conveyors BCN-3A/B and connecting chutes at TP2 and Contingency -1 and 2 chutes as and when required in sec-III of MM-I Sub division of MM/CHP/BTPS for the period from 01.04.2025 or from the actual date of commencement of work to 31.03.2026.
Construction of CC Drain Opposite to Nagaraju complex and Laying of CC Road from Manjula House to Existing CC Road and Laying of CC Road from Sunil House to Existing Culvert and Laying of UGD Mohan reddy House to Exisiting Road and Fabrication, Transportation and Installation of Octagonal poles with Highmast LED Lights at Vishnuvarrrdhan Reddy (H) and Various places in ward No.23 in Sadasivpet.
BTPS - CHP - Replacement of New/Reconditioned rollers and Frames, fabrication and erection of skirt rubber and diversion plates etc for periodical and breakdown maintenance of belt conveyors BCN-6A/B, 7A/B, TP-5, ILMS-3,4 and Tripper in MM-III sub division of CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
Laying of Under Ground Storm Water Drainage Pipeline from Arphan Fabrication EXT. MH to E. Pole No. E/10 & E. Pole No. E/21 to dead-end & Laying of CC Road from E. Pole No. E/40 to dead-end, #7-67/1 to dead-end in Indra Nagar Colony of Division No.12 of Boduppal Municipal Corporation under general funds.(Reserved for SC individulas or agencies)
Manufacture, fabrication, supply and delivery of 1700mm internal diameter MS pipe line for casing using 22mm thick MS plate and pipe line tunneling work through pipe jacking or any specialized technique by excavation, boring and cutting of hard rock, making bore hole and pushing the casing pipe by jacking and pushing method for the tunnel portion at ROB, Falaknuma under PCC-I, HMWS&SB Slice-IV
BTPS - CHP - Replacement of New/Reconditioned rollers and Frames, fabrication and erection of skirt rubber and diversion plates etc for periodical and breakdown maintenance of belt conveyors BCN-4A/B, 5A/B, BCN-10, TP-3, TP-4 and ERH in MM-III sub division of CHP/BTPS as and when required for the period from 01.04.2025 or from actual date of commencement of work to 31.03.2026
BTPS - CHP - Replacement of New/Reconditioned rollers & Frames, fabrication and erection of skirt rubber, flap gates and diversion plates etc for periodical and breakdown maintenance of belt conveyors as and when required for the conveyors BCN-1A/B and BCN-2A/B of Sec-I&II of MM-I/CHP for the period from 01.04.2024 or actual date of commencement of work to 31.03.2025
Aluminium sheet hard 0.91mm, Lead sheet 2000x2000x2mm, Steel angles 20x20x3mm, Aluminium sheet hard 0.71mm, Steel bar carbon round 10mm, Rod welding, m seal, Adhesive universal
SPARKING PLUG, STARTING ROPE, FUEL PIPE, FUEL COCK, CARBURATOR ASSY, M SEAL, ELECTRONIC WELDING STEEL HIGH, TAPE ADHESIVE WATER PROOF, IGNITION COIL, GASKET CYLINDER HEAD
PORTABLE HANDHELD ADVANCED CONDUCTIVITY MEASURING INSTRUMENT (Q3), HANDHELD PORTABLE WELDING JOINT INSPECTION KIT (Q3), PORTABLE HANDHELD LED RT INTERPRETATION DEVICE (Q3), HANDHELD MAGNETIC PERMIABILITY CHECKER (Q3)
Operation And Maintenance Of Other Machines And Plants - Assistance in pilgering, mandrel bar fabrication & monitoring of PHWR fuel tubes at NZFP & ATMF, NFC HYDERABAD