Loading…
Loading…
4,645 results • Best match
Road Crossing work by 100 mm dia MS carrier pipe infront of Bandhkana More at Bahara Khuliya mouza by Jack pushing method, inetrconnection of MS carrier pipe with UPVC/HDPE pipeline including fabrication of MS pipe
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 80m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Arazi Jalsha Water Su
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 30m hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at Tubewell no. 3 site of Dalla Wate
Fabrication and Installation of New Twin Hull Barge at Parhabinagar -I Major RLI Scheme under Bamongola block under Gazole (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Supplying, fabrication and laying of 600 mm dia MS rising and secondary grid pipeline for negotiating critical bend and proper arrangement for inlet and outlet of primary and secondary grid Kulpi GLR with others associated works
Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 67.00 M3 Hr. capacity Iron Elimination Plant (Pressure type) for Jote Basanta Water Supply Scheme at English Bazar Dev. Block under Malda Division, PHE Dte.
Design, Supplying. Fabrication, Erection an Commissioning including 3 (three) months Trial Run of 100 m3/hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room and backwash water disposal at head work site, Constru
Designing Fabrication Supplying Installation Commissioning and Trial Run and 03 Month of 50 Cum hr capacity Iron Elimination Plant Pressure Type for MAJHIGRAM PWSS under Balurghat Division PHED in the District of Dakshin Dinajpur Balurghat Block
Supplying, Fabrication, Erection and Commissioning including 3 (three) months Trial Run of 100 CUM per Hr. capacity Iron Elimination Plant (Pressure type) ...at English Bazar Dev. Block under Malda Arsenic Area Water Supply Division, PHE Dte.
Fabrication of temporary garrage for Vehicle, guard bathroom by placing zn alloy sheet and internal electrification at garrage, bathe room etc and other allied works at Midnapore Mechanical Sub Division -I under Medinipur Mechanical Division PH
Erection of temporary pandal of theme pavilion with requisite structures including drawing design fabrication decoration supervision etc at Western Side and commissioning of pavilion LED Screen and LED Screen at other locations of Red Road Kolkata
Supplying, Fabrication, Erection on suitable RCC Foundation, Installation, Commissioning and Testing with satisfactory completion etc. of Iron Elimination Plant (IEP) of capacity 100 Cum/Hr. including 3 (Three) months trial run at Kushmuri A OHR (Z
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at Tubewell no. 5 site of Bahirgachi Wate
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Altor Water Supply Scheme of Gazol
Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 15.00 M3 Hr. capacity Iron Elimination Plant (Pressure type) for Barachak Water Supply Scheme at English Bazar Dev. Block under Malda Arsenic Area Water Suppl
Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run and 25 cum/hr. capacity of Iron Elimination Plants (Pressure type) with provision of polishing unit alongwith Construction of 3.60 mtr.X 3.00 mtr Blower Room
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 40m hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at Tubewell no. 4 site of Bahirgachi Wate
Fabrication and Installation of New Twin Hull Barge at Ashrafpur-III Major RLI Scheme under Bamongola block under Gazole (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Fabrication and Installation of New Twin Hull Barge at Madhabbati-II Major RLI Scheme under Bamongola block under Gazole (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2022-23 Programme.
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 50 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Malipakar Water Supply Scheme of H
Supply, Fabrication, installation and Commissioning of integrated unit of UV purification based water cooler cum purifier Dispenser (270Lit/Hrs.) for drinking water at Chandannagar Subdivision in the Hooghly District with one year warranty and 4 year
Fabrication and Installation of New Twin Hull Barge at Dharmadanga - II Major RLI Scheme under Bamongola block under Gazole (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Design, Fabrication, Supplying, Erection, Installation Commissioning of Arsenic cum Iron Removal Plant Gobardanga Model Pressure Type with Trial run for a period of 3 (three) months after completion of the works and 60 (Sixty) months maintenance
Fabrication and Installation of New Twin Hull Barge at Khanpur Major RLI Scheme under Manikchak block under Malda-I (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Fabrication and Installation of New Twin Hull Barge at Damodarpur Major RLI Scheme under Manikchak block under Malda-I (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2022-23 Programme.
Supply, Fabrication, installation and Commissioning of integrated unit of UV purification based water cooler cum purifier Dispenser for drinking water at Pandua, and Dhaniakhali Block in the Hooghly District with one year warranty and 3years extende
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 30m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Arjuna Water Supply S
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 135 m hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at Head work site of Maheshpur Water
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 80 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Nabagram Water Supply Scheme of Chanc
DESIGN, DETAILED ENGINEERING, INCLUDING THE SUPPLY, ERECTION, FABRICATION AND INSTALLATION WITH THIRD PARTY INSPECTION, TESTING, COMMISSIONING FOR SEMI AUTOMATION OF THE 8 BAYS TANK LORRY LOADING SYSTEM WITH ALLIED MECHANICAL AND CIVIL JOBS AT LPG BO
Fabrication and Installation of New Twin Hull Barge at Ashrafpur-II Major RLI Scheme under Bamongola block under Gazole (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 120 m3hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at Head Work Site of Mirzapur Water S
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 80m3 hr. capacity Pressure type IRON ELIMINATION Plant with Construction of Blower room backwash water disposal at head work site of Bairat Water Supply
Design, Supplying, Fabrication, Erection Commissioning including 3 (three) months Trial Run of 25 m3 hr. capacity Pressure type Iron Elimination Plant with Construction of Blower room backwash water disposal at Mianagar Water Supply Scheme of Ha
Construction of New Surface Drain Starting from the house of Dr. Bashak via H/O Dr. Gupta upto the house of Goutam Mondal, at Deshbandhu Road opposite Usha Sao Welding Works ,Within Ward No-21, Under Purulia Municipality during 2022-23
CGI Sheet 9ft x 3ft, PGI Sheet 36ft x 3ft, M S Flat 1Inch x 18ft, Self Driving Screw 1Inch, Welding Calcium Carbide, Glow Sign Board 4ft x 3ft with frame, Glow Sign Board 8ft x 2 ft with frame
Grass Cutting Machine, White Board Supreme, Lamination Flims, Welding Machine iBell M220 76 ARC IGBT 220A with Hot Start, Bosch Professional Electric Drill Tool Set, Bosch Aquatak 125 High Pressure Washer, Orient Electric LED Flood Light Sigma 100 W, MCB
Manufacturing and supply of Alumino thermic welding portions of 52 kg/60Kg/60EI- R260 as approved by RDSO vide Estt. No.45/Engg/AP/I of 2025-26, 41/Engg/AP/I of 2025-26, 04/Engg/AP/I of 2025-26, 05/Engg/AP/I of 2025-26,03/Engg/AP/I of 2025- 26, 06/Engg/AP/I of 2025-26, 08/Engg/AP/I of 2025-26, 07/Engg/AP/I of 2025-26, 14/Engg/AP/I of 2025-26 & 23/Engg/AP/I of 2025-26 under the jurisdition of Sr.DEN/I/APDJ.
Fabrication and Installation of New Twin Hull Barge at Pulbandha Major RLI Scheme under Ratua-I block under Malda-I (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Design, Fabrication, Supplying, Installation, Commissioning, and 3 (three) months Trial Run of 27.55 m3 / hr. capacity proper disposal of backwash water for UTTAR NAZIRPUR Water Supply Scheme at Englishbazar Dev. Block under Malda Arsenic Area W/S
Fabrication and Installation of New Twin Hull Barge at Chandipur Mal Major RLI Scheme under Manikchak block under Malda-I (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2021-22 Programme.
Design supply fabrication, installation commissioning including 3(three) months trial run of 100m3/hr capacity Iron Elimination Plant(Pressure Type) at OHR site(Zone-A) under Marar and Adjoining Mouza w/s scheme Block Bishnupur, Dist.-Bankura.
Fabrication and Installation of New Twin Hull Barge at Kalitala Major RLI Scheme under Ratua-I block under Malda-I (A-M) Sub Division within Malda-I (A-M) Division, Malda under CORE SECTOR 2022-23 Programme.
Supplying, fabrication , insertion of 700 mm dia (ID) 12mm thick MS casing pipe line 135 mtr. in length by HORIZONTAL DIRECTION DRILLING (HDD) technique underneath the Railway Track near Karanjali Railway Station in between Karanjali Halt (KNJI) -
Supply, Fabrication, installation and Commissioning of integrated unit of UV purification based water cooler cum purifier Dispenser (270Lit/Hrs.) for drinking water at Arambagh Subdivision in the Hooghly District with one year warranty and 4 years AM
Road Crossing work by verious dia MS carrier pipe by Jack pushing method, inetrconnection of MS carrier pipe with UPVC pipeline including fabrication of MS pipe and allied works for Augmentation of Bikna Piped Water Supply Scheme
Design supply fabrication, installation commissioning including 3(three) months trial run of 75m3/hr capacity Iron Elimination Plant(Pressure Type) at OHR site Zone-A) under Nikanjapur and Adjoining Mouza w/s scheme Block Onda, Dist.-Bankura.
Supplying Fabrication Erection on suitable RCC foundation and Commissioning with 3 months Trial Run of pressure type Iron removal plant with Blower cum Compressor room of internal size .....Dhakna Zone of Naxalbari WSS Capacity 20 cu.m hr
Const. of PH, Rig Bord Deep TW by Odex-165, boundary wall, laying distribution, FHTC and supplying, fabrication erection on suitable RCC foundation ..... IEP....... for Rejuvenation of Dangarvita PWSS at Kharibari block under Siliguri Sub Divn, PHEDt
Design supply fabrication, installation commissioning including 3(three) months trial run of 05m3/hr capacity Iron Elimination Plant(Pressure Type) at OHR site(Zone-B) under Marar and Adjoining Mouza w/s scheme Block Onda, Dist.-Bankura.