Loading…
Loading…
357 live184 closing this weekmost from GORKHALAND TERRITORIAL ADMINISTRATION and Department of Water Resources
357 results • Best match
Extra Ordinary Repair of 101.558 km. of IBB Road, Link Road i/c Arm Road and embankment protection work along with painting of 7 nos. steel bridge in various stretches in Malda district in the state of West Bengal along Indo - Bangladesh Border. SW: Providing two nos. Messenger services and one no. Computer Operator for the Malda Office (AE/MBFSD-III & AE/MBFSD-IV) under BFD-VII, CPWD, Murshidabad (W.B) for 06 (Six) months.
Construction Of PCC R.Wall at RD. 1.220 to 1.304, 7.542 to 7.578, Construction Of Embankment at RD. 7.540 to 7.580, 7.598 to 7.653 under PDNA 2025.
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 63500-66000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 57000-58500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 53000-55000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 25000-41000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 55000-57000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 34000-34800 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 58500-61000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 41000-48500 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 47500-49000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 0-500 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 51500-53000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 41000-43000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 37000-39000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 500-2000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 12500-14664 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 45000-47500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 3000-5000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 9000-9500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 9500-10000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 8500-9000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 11500-12500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 4000-6000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 8000-8500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 3000-4000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 6000-8000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 10000-11500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 43000-45000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 33500-34000 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 58500-61000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 11000-25000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 54000-56000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 56000-58500 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 5000-6500 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 50500-51500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 61000-63500 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 48500-50500 on L/s bank of river Swan in distt. Rupnaga
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 49000-50500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 52000-54000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 50500-52000 on L/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 32330-33500 on R/s bank of river Swan in distt. Rupnagar
Project to reduce Disaster Risk and its Impact by construction of River embankment in between RD 39000-41000 on R/s bank of river Swan in distt. Rupnagar
8200 LPM, 85 MTR HEAD SUBMERSIBLE PUMP WITH 85 MTR CABLE FOR POWER HOUSE DRAINAGE SYSTEM, 85 MTR HEAD SUBMERSIBLE PUMP WITH 8 5 METER CABLE FOR POWER HOUSE DEWATERING SYSTEM, 85 MTR HEAD SUBMERSIBLE PUMP WITH 85 MTR CABLE FOR POWE FLOOD PROTECTION SYSTEM, 200 LPM, 15 MTR HEAD PORTABLE SUBMERSIBLE PUMP FOR OIL WATER SUMP WITH 30 MTR CABLE
Extension of Mechpara embankment along the Left Bank of River Pana for a length of 1000 Meter at Mouza and G.P Chuapara within Block and P.S.Kalchini, Dist. Alipurduar. 2nd Call
Construction of Ghat infront of Bamni bridge and Paver block Road from the h/o Sanjoy Das to Bitta Lottery counter and remaining portion of embankment in ward no 5 under Dhupguri Municipality.
Provision of Infrastructure Development Works (Earthwork in Embankment, Bridge Extension, Retaining Wall cum Boundary Wall, Road Works, etc.) in connection with Development of Land for Proposed POH cum New EMU Maintenance Depot at Vangaon
Repair and restoration of damaged brick block pitching along the left bank of River Muriganga for 110.00 m, disturbed due to movement of excavators and tractors over the embankment slope during urgent disposal from the dyke at Lot No-8 facing left ba