Loading…
Loading…
1,485 results • Best match
refer nit
BOQ
Plugging of breaches in the existing embankment/ bund by way of using a. Earthen bags b. Earth only c. Vegetative cribs at Hygam Wetland Reserve
Plugging of breaches in the existing embankment/ bund by way of using a. Earthen bags b. Earth only c. Vegetative cribs at Shallabugh Wetland Reserve
Construction of protection work by way of revetment crates and earthen embankment on right side of River Nikki Tawi at village Toph Manhasan at spots.
Construction of crate revetment and embankment between RD 16400-16800m near Buraj Channi to protect Agricultural land on left bank of River Chenab (Part-I).
Plugging of breaches in the existing embankment/ bund by way of using a. Earthen bags b. Earth only c. Vegetative cribs at Mirgund Wetland Reserve.
Permanent Restoration of Gundpreng Bakshibal Road B.W Construction of R/Wall/Embankment and Shoulder Package No JK03-128 under SASCI-II of PMGSY Division Bandipora
Plugging of breaches in the existing embankment/ bund by way of using a. Earthen bags b. Earth only c. Vegetative cribs at Hokersar Wetland Reserve
Restoration of right side embankment of D2 branch of Martand canal near RD 700mtrs by way of construction of Retaning wall, Raising and RCC jacketing.
Deepening and Widening Construction of Toe wall Ghat , Syphons, foot bridge, sluice gates near offtake point and raising and strengthening of embankment of Anum Khul.
Construction of Crated Revetment along with earthen embankment and studs on Left bank of Nikki Tawi from 4th Bridge to Ring Road Bridge (at Spots).
boq
Plugging of Breaches in the Existing Embankment / Bund by using earthen bags / earth only / vegetative cribs at Shallabugh WLR ( Moshigoal Veer, Kreshbal Masjid Demb, Chunch Khun).
Construction of Earthen Embankment /bund at Track-3 (Part-Ist) near playground Mukhdamyari (length-550 mts) under under Eco-tourism development component of approved NPCA scheme.
Construction of Protection work long left bank of River Devak D S NH-44 opposite AIIMS Vijaypur by way of revetment crates and strengthening of Embankment
Construction of Earthen Embankment /bund at Track-3 (Part-Ist) near playground Mukhdamyari (length-550 mts) under under Eco-tourism development component of approved NPCA scheme.
Removal of vegetation from Bell mouth entry of flood spill channel to cement bridge noorbagh on both sides embankment of River Jehlum along with city channels
Construction of Crated Revetment along with earthen embankment and studs on Right bank of Nikki Tawi from Ring Road Bridge to Indo-Pak Border (at Spots).
Construction of Crated Revetment along with earthen embankment and studs on left bank of Nikki Tawi from Ring Road Bridge to Indo-Pak Border (at Spots).
Providing and Laying Crate wire protection bunds 56 Nos, Errection of DRSM Check dams 100 Cum, Bag embankment 4000 and Up-gradation of pond 01 No
Refer BOQ
Refer to BOQ
AS PER NIT
Providing and Laying Crate wire protection bunds 40 Nos,Bag embankment 8000,Construction of Crib Structure 14 No and Up-gradation of natural Spring 01 No at warson
Construction of Earthen Embankment /bund at Track-11 (Part-3rd) from paribal to Kema Nallah (length-1065 mts) under Eco-tourism development component of approved NPCA scheme.
Construction of Earthen Embankment /bund at Track-11 (Part-3rd) from paribal to Kema Nallah (length-1065 mts) under Eco-tourism development component of approved NPCA scheme.
Improvement / strengthening of Left Side Embankment of Telbal Nallah from RD 787 meters to 919 meters upstream Diversionof Head Works with Regulation Gate Reckoned RD 0 meters.
boq
boq
boq
BOQ
civil work
Restoration of Right side embankment of MRC at RD 20800M along headsite of distirbutary 7B and Restoration of Gate structure of 7B of MRC under SDRF 2025-26.
Improvement / strengthening of Right Side Embankment of Telbal Nallah from RD 719 meters to 919 meters upstream Diversion of Head Works with Regulation Gate Reckoned RD 0 meters.
Embankment and channelization of creek of river Ujh and protection of land of harbans singh, rajinder singh, paramdev singh at bholpur Bhorthain South Pyt Bhorthain South Block Barnoti
Construction of Earthen Embankment / Bunds for boundary consolidation of wular lake along vulnerable BPs to permanently mark the boundary of wular lake Track-10 (part-II) near Khanibathi.
Construction of crate revetment/ earthen embankment with studs for protection of army defence posts/ structure from manwar Tawi near view point (Crate revetment with earthen bund) Length 252m
Construction of crate revetment/ earthen embankment for protection of army defence posts/ structure from manwar Tawi near manjeet post 2(Crate revetment with earthen bund on tipping section)
Construction of 01 no. 24m long Stud along with revetment crates and earthen embankment along left side of River Nikki Tawi at lalyal upstream and downstream Lift Irrigation Scheme.
Construction of 02 no. 24m long Stud along with revetment crates and earthen embankment along left side of River Nikki Tawi at lalyal upstream and downstream Lift Irrigation Scheme.