Loading…
Loading…
1,485 results • Best match
Soil and Conservation works by way of Aforestation works, in Pits and of B/L Plants, Dubbling of H.C. nuts Bag Embankment and Crib at Ziyartnalla Charisharf Zone Doodhganga.
Providing and Laying Crate wire protection bunds 46 Nos, Errection of DRSM Check dams 125 Cum, Bag embankment 6000 andviii) Construction of Crib Structure 13 No at TP Rangwar
PLEASE REFER BOQ
REFER BOQ
Soil and Conservation works by way of i- DRSM Moisture retention check dams, ii- Create wire structure/ retaining wall, iii- laying of nylon bag embankment at RESHIPATHRI Co-D/33.
Temporary Restoration of D10 of MTC near RD 1900 M by way of strengthening of bank restoration of damaged canal embankment by filling of earth filled EC bags at spots
Construction of 04 nos. studs 18m long along with crate revetment and earthen embankment on left side of River Nikki Tawi D/S Surya Chak Bridge at Village Barjala Khandwal.
Please refer to BOQ
Refer to BOQ
Construction of embankment/ re-sectioning of Flood Spill Channel on right side from RD 39.566 Km to RD 39.725 Km at Gulabwari Naidkhai D/S Bridge (Banking right side Sec. 09)
Construction of embankment/ re-sectioning of Flood Spill Channel on right side from RD 39.725 Km to RD 39.824 Km at Gulabwari Naidkhai D/S Bridge (Banking right side Sec. 10
boq
Please refer to BOQ
Please refer to BOQ
Please refer to BOQ
Repair and Maintenance of Bridges 210 & 224, including repairing to flooring protection work and improvement to embankment & approaches and other miscellaneous works in the section of SSE/W/JAT under ADEN/JAT
PLEASE REFER BOQ
civil work
Establishment Soil Conservation closure by way of i-Erection of Angle Iron Fencing, ii- laying crib structure, iii- laying of nylon bag earthen embankment, iv- Water harvesting tank at FRESTWAR Co-D/19.
read boq
Construction of Flood Protection work to Safeguard the critical Vulnerable spots at Belicharana on Left side of River Nikki Tawi spot-3
Permanent Restoration of Main Kathua Canal and construction of protection work on upstream and downstream of syphon by way of crated revetment, spurs , earthern embankment , pitching and grouting between RD 12470 to 12950 m.
Soil Conservation works by way of fencing, Afforestation, erection of DRSM check dams, Create wire structure/ retaining wall, crib structure, earthen embankment, Contour trenches, water harvesting tank in Compt. Ri-19 Yenpukhari Zone Budgam
Soil Conservation works by way of fencing, Afforestation, erection of DRSM check dams, Create wire structure/ retaining wall, crib structure, earthen embankment, Contour trenches, water harvesting tank in Compt. D-33 Sochlipathri Zone Budgam
Soil Conservation works by way of fencing, Afforestation, erection of DRSM check dams, Create wire structure/ retaining wall, crib structure, earthen embankment, Contour trenches, water harvesting tank in Compt. S-8 Tosimaidan Zone Khag
Soil Conservation works by way of fencing, Afforestation, erection of DRSM check dams, Create wire structure/ retaining wall, crib structure, earthen embankment, Contour trenches, water harvesting tank in Compt. Ri-32 Nagbal Vidamnarie Zone Doodganga
BARBED WIRE FENCING, CONSTRUCTION OF CRIB WALL, PROVIDING AND LAYING EARTHEN BAG EMBANKMENT, CONSTRUCTION OF INSPECTION PATH (0.50) Afforestation of naked rooted saplings in Pits Patch Sowing and Dibbling of H.C. Nuts AT HEEWAN, BARAMULLA
BARBED WIRE FENCING, CONSTRUCTION OF CRIB WALL, PROVIDING AND LAYING EARTHEN BAG EMBANKMENT, CONSTRUCTION OF INSPECTION PATH (0.50) Afforestation of naked rooted saplings in Pits Patch Sowing and Dibbling of H.C. Nuts AT SAGIPORA BARAMULLA
Please Refer BOQ
Refer to BOQ
PLEASE REFER BOQ
refer to BOQ