Loading…
Loading…
921 results • Best match
This MLA ADS work includes Embankment filling with local materials like quarry waste GSB filling WMM Construction of MSS road
Road work including Dismantling of flexible pavement, Pothole filling ,BM and BC ,Traffic safety works ,Construction of embankment , Berm concreting etc
Construction of Single Sluice Type A (1 no.)
Construction of Flood inlet - Type A
Earth work excavation, scarification, construction of embankment, GSB, Wet Mix Macadam, BM, BC, Primer coat, Tack coat, Traffic safety works, side protection works, culvert etc.
GENERAL- Budget Work 2009-10 Construction of Korankadavu bridge across Muvattupuzha river in Ernakulam District - Balance Works-Investigation for Ground improvement recommentations and Embankment design-Investigation Work
Road work including Dismantling of flexible pavement, Pothole filling , scarifying the existing bituminous surface ,GSB ,WMM ,BM and BC , Construction of embankment ,Traffic safety orks ,Berm concreting etc
Site clearance, Embankment filling, GSB, wet mix macadam, SS1, RS1 and surface course of 20mm MSS, Road berm filling and retaining wall back filling, side protection retaining walls
estimate are Clearing and grubbing road land Earthwork excavation for road work in ordinary soil ordinary rock and hard rock blasting prohibited Construction of embankment Earth excavation for foundation of structures
Pavement works including excavation for widening, WMM, GSB, Prime coat, Tack coat, BM, BC, BC with shredded plastic, Pothole filling, bitumen levelling coarse, Construction of embankment, Traffic safety works and drain etc.
Pavement works including excavation for widening, WMM, GSB, Prime coat, Tack coat, BM, BC, BC with shredded plastic, Pothole filling, bitumen levelling coarse, Construction of embankment, Traffic safety works and drain etc.
Upgradation of vapour trap TLD filling shed Strengthening of embankment in TPA Modernisation of Bullet truck driver rest room with additional facility and construction of packed truck drivers parking shedat Quilon Bottling Plant
Modified Penetration Macadam 75 mm thick Tack Coat With Packed Bitumen Rates Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface Wet Mix Macadam Prime Coat Low porosity With Packed Bitumen Rates Tack Coat
This work includes CBR test Benkelman beam test Topographic Survey using LIDAR technology Turning Movement Survey Trafic survey midblock origin and destination survey Sub Soil investigation for Major Minor bridges One culvert high Embankment
Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface Wet Mix Macadam Prime Coat Low porosity With Packed Bitumen Rates Tack Coat With Packed Bitumen Rates 20mm thick Open Graded Premix Carpet using Bituminous
Preparation of Foundation for Embankment Scarifying Existing Bituminous Surface Wet Mix Macadam Prime Coat Low porosity With Packed Bitumen Rates Tack Coat With Packed Bitumen Rates 20mm thick Open Graded Premix Carpet using Bituminous
Road work including Excavation for road work in soil, Clearing grass , Excavation for road way in hard rock ,Scarifying , pothole filling , GSB ,WMM ,BM and BC, Embankment ,Traffic safety works ,Protection works, drain, junction improvement
This road work is included in the MLA Asset Development Seheme in Aroor Legislative Assembly constituency in Alappuzha District. The work includes embankment filling with local materials like quarry waste and GSB items WMM,MSS and side shoulders
This estimate includes road concreting works such as Preparation of Foundation for Embankment Excavation in Soil with Dozer Granular Sub base with Well Graded Material Providing Plain cement concrete for road work CC 1 2 4 Construction of Subgrade
raising the embankment with gravell of 15 cm thick and over with 15 cm thick GSB are included. And also included for Cement Concrete15 cm thick for surfacing. The improvements proposed for a length of 82m and width of 3.00 m
The earth embankment at the beginning of the Kakinikad canal collapsed and was washed away due to the water that flowed in a manner similar to a landslide. The wall of the surplus escape of the canal has also been broken and trees have fallen.