Loading…
Loading…
386 results • Best match
Work contract for Anti-corrosive, Anti-Erosion, Anti-Abrasive Polymeric Epoxy Coating on surface of condenser water box installed in Unit-1 at 2X600 MW, SSTPP, MPPGCL, Dongalia
Flood relief material supply work at nagar palika parishad Balaghat
Kumbhraj Flood Protection Work.
Bank Protection work of Lachhora Barrage.
FLOOD DAMAGE REPAIR WORK OBEDULLAGANJ AND GOHARGANJ SECTION UNDER SUB DIVISION OBEDULLAGANJ.
Flood Damage Repairing work in Various culvert Section under sub Division Bareli
FLOOD DAMAGE REPAIRING WORK IN VARIOUS CULVERT SECTION UNDER SUB DIVISION BARELI.
FLOOD DAMAGE REPAIR WORK CHIKLOD AND MANDIDEEP SECTION UNDER SUB DIVISION OBEDULLAGANJ.
Flood Damage Restoration of Sherpur Rusalli road km. 1/6 length 500 mtr.
Restoration of Flood Damage approach of VCW 3/2 on Obedullaganj bhojpur road.
Restoration of Flood Damage work of Simrai Bairasiya Hajli road. km. 4/2
FLOOD DAMAGE REPAIR OF CULVERT/STRUCTURE UNDER PWD SUB DIVISION CHITRANGI, DISTRICT SINGRAULI (M.P.)
FLOOD DAMAGE REPAIR OF CULVERT/STRUCTURE UNDER PWD SUB DIVISION WAIDHAN, DISTRICT SINGRAULI (M.P.)
Construction of R.C.C. Retaining Wall in jayprakesh Narayan flood affected colony to malviya loan at ward no 35.
FLOOD DAMAGE WORK AND RENOVATION MATHNA KUTWARA INDAR ROAD LENGTH 4.90 KM DISTT. SHIVPURI (M.P.)
Fixing of wireless set at different gauge point , repair and maintenece and dismantling after end of flood control season for flood control of bansagar dam.
CONSTRUCTION OF FLOOD PROTECTION AND MITIGATION WORK OF BAHORIBAND TANK
Construction of flood protection work near Bargaon at Silgi River
Restoration of Flood Damage Work Raisen Chiklod Road Km 13 to 17 and 24 (6.00 Km)
FLOOD DAMAGE WORK AND RENOVATION MADA KHATORA VIA INDAR ROAD LENGTH 6.00 KM DISTT. SHIVPURI (M.P.)
Construction of Box Culvert (Under Flood Damage) on Pamariya Dhadon Wardha Dangarwara Road CD km. 18/10.
Repair of flood damage CDs in km 12 6 and 16 6 on suwasra guradiya kala road
Repair and Renovation work of flood control room Rostam at Kolar dam.
SPECIAL REPAIR WORKS DUE TO FLOOD DAMAGE AT NARMADA BRIDGE APPROACH ROAD OF MOTALSIR-GAJANAI ROAD DISTT RAISEN
Flood Damage repair work on Chhabara to Pipariya Puariya Road in km. 4/2 and 4/4 km.
Construction of Gabion Wall for Flood and Bank protection of Bhagni Nalla.
Repair of flood damage CDs in km 12 10 13 6 and 17 4 on bardiya amara baloda road
Bank Protection Work of Bihar Sarola Barrage in Tehsil Pandhana Distt. Khandwa ( M.P.)
Flood Damage Repair of Apporach Aoad and Protection work of Top Banskheda Road Across Pench river Tahsil Chand District Chhindwara
FLOOD DAMAGE (EMERGENCY REPAIR WORK) ROAD OF MDR, ODR AND VR ROAD UNDER PWD SUB DIVISION CHITRANGI, DISTRICT SINGRAULI (M.P.)
FLOOD DAMAGE (EMERGENCY REPAIR WORK) ROAD OF MDR, ODR AND VR ROAD UNDER PWD SUB DIVISION WAIDHAN, DISTRICT SINGRAULI (M.P.)
Temporary restoration work due to Flood damage of H.P. Culvert Km 56/6 on New NH 752 B First Call
Strengthening work of (Flood Damage Restoration) of Anandpur Jawti Approach road in km. 1 to 3.80 total length 3.80 Km.
FIXING OF WIRELESS SET AT DEFERENT GAUGE POINT FOR FLOOD CONTROL OF BANSAGAR DAM.
For Flood control Construction of Sluice head and seepage protection wall of Kuda Tank.
Maintenance of Road Due to Flood Damaged (Supply and Fill) Under Sub Division Sarangpur
Construction of Flood Protection work on the bank of Katkiya River near Alakhdham Temple.
Survey of Imaliya (Baghora) Shakkar River Right Bank Protection work Tehsil Gadarwara Dist Narsinghpur
Construction of Gabion Wall for Bank Protection From Flood on Upstream of Shahpura Barrage.
Permanent Restoration of Damaged portion on Ratlam Nashirabad Road City portion under flood damage scheme total length 3150.00 mtr 3rd call
FLOOD DAMAGE SPECIAL REPAIR WORK 11 MILE TO 34 MILE ROAD BETWEEN KM 15 AND KM 16 UNDER SUB DIVISION, OBEDULLAGANJ.
Construction of U/S Gaite well and key well for Bank Protection of Silawad Barrage.
REPAIR AND MAINTENANCE OF MAIN CANA, BANK PROTECTION AND STRUCTURE REPAIR WORKS OF RETAM BARRAGE
Construction of U/S Gaite well and key well for Bank Protection of Attarsambha Barrage.
Construction of U/S Gaite well and key well for Bank Protection of Sunpuri Barrage.
Construction of Flood Protection wall in U/S and D/S of abutment of Bhanpura Barrage.
A/R S/R and Flood Damage Work for Cross Drainage and Various Road Under PWD Sub Division Berasia Division No.-2 Bhopal
Bank Protection work at Right Bank and Key wall and D.S. Return wall of Kalapipal Barrage.
Survey of Imaliya (Baghora) Shakkar River Right Bank Protection work Tehsil Gadarwara Dist Narsinghpur (second call)
For Flood control Construction Wave reflecting wall from R.D. 0 m. to 350 m. of Kuda Tank.