Loading…
Loading…
1,679 results • Best match
REPAIRS TO K. T. WEIR at ARALI TAL. MANGALWEDHA DIST. SOLAPUR DUE TO FLOOD DAMAGED IN BHIMA RIVER DURING YEAR 2019-20
Repairs to K. T. Weir at Machnur Tal Mangalwedha Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Repairs to K. T. Weir at Mire Tal. Malshiras Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Repairs to K. T. Weir at Gursale Tal Pandharpur Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Repairs to K. T. Weir at Bathan Tal Mangalwedha Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Repairs to K. T. Weir at Puluj Tal Pandharpur Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Repairs to K. T. Weir at Pirachikuroli Tal Pandharpur Dist. Solapur due to flood damaged in Bhima River During Year 2019-20
Providing cross drainage arrangement with RCC hume pipes along with sluice gate and stone pitching across northside and south side of main embankment at Neeljay Deep OCM under Neeljay Sub Area of Wani Area.
MandR to Earthen Dam embankment of Kolgaon Dolas M.I. Tank and approach road outlet and other necessary work and M and R to Alegaon Paga M.I. Tank of approach road and other necessary work.
Construction ,Embankment, Lining and resectioning in 180/420 to 180/440 Turchi Dy 2/980 Palus Br Canal 32/960 to 32/980 Inlet pipes at Km 161, 174 and 178 of Arphal Canal
4701-Special Repairs to M.R.B.C CH.15/500 to 26/00 K.M. and DY 3 CH. 0/00 to 24/00 K.M. of Linning Pitching and Embankment to S.R. and I.P. Sides for strengthening.
Construction of foot bridge at chainage 77/250 in Km 78 and chainage 78/970 in Km 79 of Takari main canal and repair of embankment of aqueduct in Takari main canal Km 78.
Construction of VRB on Ch.1355m 1800m 7050m 20300m 23600 m 29100m 31200m and constructing collapsed retaining wall at right side of aquaduct at Ch 7635m of 30m and embankment of Sule left bank canal.
Construction of RCC retaining wall
4701-Special Repairs to Branch Canal 1 and Dy 1, 2, 3, 4 and 5 of Branch Canal 1 of MRBC By Linning Repairs, Structure Repairs, Minor and Outlet Repair, Embankment Repairs and Office Buildig Repairs.
Strengthing of Canal embankment repair of canal earthwork and Structure for regular irrigation purpose of Deoli Branch Canal, Selsura Distributory and its Disnet also Bhivapur Dy and its Disnet damaged due to heavy rain 3rd call.
Maintenance and Repairs to SWF at ch 1480 of NRBC and Repairs to embankment of NRBC in Km 23 to IP and SR side And constructing Ghat at Ch 10100 and 16100 and 17200 of NRBC
Sonal Medium Project Tq Malegaon Dis .Washim. Canal embankment and lining of main canal Village road bridge Cross regulator and other structure repairs, Syphon and OL gate repairs of main canal and Minor of the Project
RESTORATION OF ROAD EMBANKMENT FROM M.D.R.4 TO AMBADA YENIKONI AMBALA NANDA MASORA SAWARGAON TO JOIN S.H. 324 ROAD MDR-73 IN KM.16/00 TO 16/200 (UNDER FDR PROGRAMME) IN TALUKA NARKHED DISTRICT NAGPUR
Construction of Cross Regulator cum VRB at RD of 2280 on Channa and selective cement concrete lining in heavy embankment portion from R.D.1100m to 1250m of Channa Distributory of Ambhora Lift Irrigation Scheme (Stage II)
Repairs to Lining and Embankment in Patches at Minor No. 3 in Km 2 and 3 and Gate Repair (4 Nos ) at Ch. 6196 and 7126 of Dahiwad Section of Lower Girna Canal of Girna Project
Black topping to Mandre Sindhkhed to join MDR 44 Road with Embankment, WBM amd C. D. Work (Part Sindhkhed to MDR 44) ODR 45 Ch No 4/500 to 6/500 Tal South Solapur, Dist Solapur
Restoring Embankment Due to Heavy Rainfall at ch 41120 to 41310 m and Construction of Foot Bridge at ch 41670 m Of Banda Branch Canal in km 42 Of Tillari Irrigation Project Tal Dodamarg Dist Sindhudurg.
Construct retaining wall
Repairing to Cross Drainage work at ch.543 M. and repairing and concrete lining to sides and bottom to the embankment from ch.500 M to 570 M of old power canal of vaitarna hydro electric project.
A Improvement Anakdhal to Mali Mala Rd,V.R. No.136,..Ch 1 000 TO 2 500, B Providing Embankment Metaling to Nazare to Bansodewadi Chopadi ROAD, .R. No.319..Ch 0 000 TO 2 500 Tal Sangola
L-Earthworks Construction of Embankment in breached portion of Left Bank Canal Ch.0 to 3150 m and on Diversion Weirs at Zero Bandhara, Vaijanath Bandhara and Dhar Bandhara of Rajanala Irrigation Scheme,Tal-Karjat,Dist-Raigad.
Repairs to selective portion of embankment and service road of Nanori minor at RD 3800 M to 4300 M and Dhoktirtha Minor No.2 at RD 0 M to 660 M on Purna Medium Project canal network.
Borgaon Karanje Mirgavhan Kolgaon Nimgaon Gaundare Nerle to Warkute Ghoti Nimbhore Lavhe to Jeur Road MDR 6 repairs to CD work at Km 49/500 and repairs to embankment at Km 50/100 Tal-Karmala Dist Solapur.
Construction of CTF at RD 50m and VRB at RD 1250m and 1645m and repair of embankment and construction of lining from RD 180m to 300m and 600m to 800m on main canal of Pawanpar M.I. tank
FDR to Ravgaon Veet Zare Pofalaj Kedgaon Connecting to MDR-11 Road MDR-126 Repair to Pipe Culvert at Km 10/400 and repair to embankment in Km 17/300 to 17/400 Tal-Karmala, Dist-Solapur
Supplying, laying GSB, Metal Gr 1 and providing empty cement bags filled with OB/sand and placing in road side, rain cut embankment near pump during monsoon and post monsoon at Singhori and Bhanegaon OCM under BSSA.
Repairs to earthen embankment and Providing pitching to D S side area of dam and Pointing to internal area by epoxy mortar and trengthening with plastering to HR well of Harkul MI Tank Tal Kankavli Dist Sindhudurg
4701-Special Repairs to Tail Dy of MRBC and Tail Dy and Dy 3 of Pathardi Branch Canal of MRBC By Linning Repairs, Structure Repairs, SWF Repairs, Minor and Outlet Repair, Embankment Repairs and Office Buildig Repairs.
Construction of new building for flood control unit on main dam and Watch Tower on main dam and Saddle dam of Tilari Interstate irrigation project
Repairs to Eambankment on Susundra Minor at R.D. 880 m and Earthwork at R.D. 1000 to 1450 m and Repairs to Embankment, Earthwork, Service Road at R.D. 750 to 1250 m on Sonegaon Minor of Kar River Project
Providing Nala Crossing Near Aqueduct at Ch. 5300 and Ch. 5700 and Providing Repairs to Mandawane Minor, Providing Lining, Providing Repairs to Service Road and Providing Embankment and Other Ancillary Works at RAJNALA Right Bank Canal, Tal - Karjat,
Carrying out repair work to Head Regulator of Dys on Main canal Km 81 to Km124 of NRBC Maintanance and repair work of Distrubution system and Raising Height of embankment of N R B C in Natepute Section
FDR TO MEDHA (VENNA CHOWK)KUSUMBI SAHYADRINAGAR KOLGHAR PHATA ANDHARI MUNAWALE PHATA WAGHALI SHEMBDI BAMNOLI ROAD MDR 144 KM 0/000 TO 27/300 (RAPAIRS TO CD WORK AND RETAINING WALL AND REFILLING OF EMBANKMENT) TAL.JAWALI, DIST. SATARA.
FDR to Mahpral Ambet Purar Road SH 101 Km 0/00 to 11/200 Restoration of Embankment and Repairs to CD works. Construction of built up Gutter At CH 3/900 Taluka Mangaon, District Raigad. (FDR 2021-22)
Construction of Flood Protection Wall at 1) Somthane Village, 2) Wadangali Village, 3) Khadangali Village, 4) Devpur Village, 5) Sangavi Village, 6)Sangavi Village, Tal.Sinnar, Dist.Nashik
RENEWAL TO WAGADE KASWAN TALAWADE AMBRAD POKHARAN KUNDE KASAL ROAD M.D.R.31 KM. 8/000 TO 12/000 AND REPAIRS C.D. WORKS AT KM. 3/000 TALUKA KUDAL DISTRICT SINDHUDURG. (UNDER FLOOD DAMAGE REPAIRS PROGRAMME)
Construction retaining wall
Providing temporary sheds for pump switches transformers also providing empty cement bags filled with OB/Sand and placing in road sideraincut embankment Cleaning of hume pipe culvert clearing of jungle during monsoon and post monsoon at BOCM SOCM
Construction of Embankment at Kh. No. 110, 111, 112 (Part) of Mz.- Waregaon and Kh. No. 151 (Part), 152/1 (Part), 153 (Part), 154/2/2 (Part), 150/4, 155/2 (Part), 156/2, 157/3 of Mz. - Khairy.
Repair to main dam wall of kardi MI Tank and work suggested by dam safety organization. ( Repair to dam embankment, pitching, cleaning trees and shrubs and maintenance -repair to spillway gate (6 x 1.5 m ,35 No.) leakage thro
Construction of Structures on Ashatami branch Canal From Km 08 to 15, Repairs to Old Structures and Embankment work and Lining On Selected Portion, and Construction of Protection Wall and Other ancillary works at Ashatami branch Canal Canal, Tal -
Maintenance and repair works of the left and right side portions of the earthen dam of the Kalamsara Minor Irrigation Project including desilting of the approach channel installation of a gauge plate for water level measurement and road embankment
Flood Damaged Repairs to Panvel Mahad Panji road NH 66 at Km 202.900 Part I in Parshuram Ghat construction of Retaining wall in the State of Maharashtra
Repairing of Structures on Ashtami branch Canal From Km 15 to 22, Repairs to Old Structures ESCAPE, SP,VRB, and Embankment work and Lining On Selected Portion, and Construction of Protection Wall and Other ancillary works at Ashtami branch Canal Ca