Loading…
Loading…
5,737 results • Best match
FDR to Bhargovi right embankment from RD 30.700 km to 36.900 km and restoration to piping 4 nos. at RD 29.80 km, RD 30.350km at RD 31.700km, and RD 34.500 km near village Dakhinasahi, Banamalipur, Anandapur and Dhojamandapa
FDR to Bhargovi right embankment from RD 24.00 km to 30.700 km and restoration to piping 4 nos. at RD 25.800 km , RD 25.890 km at RD 26.315 km, 27.712 km near village Alarpur, Malisahi, Khairakuda and Rathpusotmapur.
Construction of Right main canal embankment road of Siariakata MIP from RD 00 M to RD 500 M and RD 2000mt to 2550 mt in Dhenkanal Block of Dhenkanal District under CAPEX Road Scheme for the year 2025-26
S/R to Kuakhai River Right Embankment road from NH-16 (Hi-tech Chhak) to Daya Bridge via Lingipur, Bhubaneswar such as Construction of Cement Concrete Pavement from 4/473 to 4/973 Km. for the year 2019-20.
Repair to HL bridge over river Kusumi at 1st KM on Pantikharisasan to Barapurikia road Bridge approach such as approach road joint repair, BT approach road repair, revertment wall, raising packing to embankment slope for the year 2025-26
Cleaning of existing high drains making kuchha drain at OSL patch, weigh bridge No.04 to Karadei sump, heightening of earth embankment of existing pond near wheel washing point and periphery at Mines at Hingula OCP under Hingula Area.
Improvement to Service Road on Communication facility on right Embankment from RD.8.40Km to 10.20Km and Kaupur Distributary from RD.00M to 1800M (Including construction of VRB at RD.10.20Km of SOSO Branch Canal) for the year 2024-25.
Cleaning of internal Storm water drain in ward no. 4 , 5 and Nayanjori along with Puri main Canal Left and Right Embankment from Nuapatna to NH and Rudrapur Sub-minor and inside of Symphony Mall of Ward No. 4
FDR to Bateswar Gherry on Chitrotpala left from RD 0.760 Km to 1.860 Km, at Bateswar, Jungle clearance and raincut filling on Chitrotpala left embankment from Harichandanpur to Barapada and Nuna left from Barapada to Badathakan including all gherry (
Renovation Rearing Tank RT and Nursery Tank NT under permanent water supply system for Binika Dist Sonpur OPDC Fish farm and Renovation and Strengthening of embankment at Barimula Govt Fish Farm in Kendrapara Dist under Director of Fisheries Cuttack
Widening and Strengthening of Taladanda Canal Embankment Road on Right Sides (Nuabazar Junction to Biribati) from 5/200km to 12/600km in the district of Cuttack under State Plan Shifting of PHD utilities under WATCO Section-I, Chatrabazar, Cuttack
Raising and strengthening of Embankment and CC lining
PROTECTION work
Earth work and Stone Work
Dumping, Packing and G.I Crates
Providing river bank protectionl in the downstream of Dam axis in Badjore river near Mahendragada K.G. High school of Chheligada Irrigation Project
Clearing shrub Jungle of C.E.No.44 A Nuna left embankment weed clearance of Kendrapara Canal from RD 42.100 Km to RD 56.00 Km and Construction of C.C. approach road at Maharakul, Bilabalarampur No.1, No.2 and Bagada village.
Contract Package No.5 Periodical Maintenance of 5 year completed PMGSY road A-Siopada to Kandiahat via Hatsahi Road (OR-16-01), B- Khunta to Patrapur OR-1693), C- Irrigation Embankment to Malisahada (OR-16-94) for the year 2020-21
Supply, Fabrication, Erection of 05 nos. of scouring sluice gate for Anti sea Erosion work to protect saline Embankment and mouth of river Baudha( From Sunapur Bhagyadevi Temple to Fishery jetty and Anantaraypur to Patisonepur) at inlet RD 340m in Ga
Cleaning of existing high drains, making kuchha drain at OSL patch , weigh bridge No. -04 to karadei sump culvert and coal corridor road both side RCC drain (Zero point to mallibandha under pass , heightening of earth embankment of existing embankm
Supply fabrication, transportation erection of Gates and Hoists by dismantling old gate structure of Kaudia Sluice on K V Rt Embankment at RD 67 300 KM of Gop Irrigation Sub Division under Nimapara Irrigation Division Nimapara for the year of 2025
Construction of H. L. Bridge over Ramial at 18th km on Khatatkura PWD road via Bhairpur Panchayat Santarpur Bank Ula Sana Brahmapur Balisahi to Lokanathapur Flood Embankment to Baligorada Motta Jodapal Chhak in the District of Dhenkanal under State P
Installation of Street Lights at Taladanda Canal Embankment Road on left side (NH-16 Junction to Nayabazar Junction) from 3/520 to 5/063 Km on LHS (Chauliaganja side), Cuttack under State Plan due to widening and strengthening of above road.
Improvement to Right Bank Canal Embankment Road of Branch Canal-I from RD2010M to 3010M and Approach Road from RD00M to 167M of Gohirakhal MIP Res in Jaleswar Block of Balasore District under CAPEX Road Scheme for the FY 2025-26.
Supply and making of outdoor cable end termination and straight through cable jointing kit with heat shrinkable complete 11 kV grade and supply and fixing of LED street lights at embankment road Bankibahal to Siarmal Chowk, at Kulda OCP, Basundhara A
Cleaning of drains and cross drainage structure, laying of hume pipe, filling and placing of sand bags in embankment, hiring and deployment of earth cutting machine within mine premises area for monsoon for the year 2021-22 at Lingaraj OCP, LA.
Construction of 5 Nos. of spur and launching appron with packing.
Canal work
Earthwork, Cement Concrete, Reinforced Cement Concrete, and RR Stone Works. Earthwork, Cement Concrete, Reinforced Cement Concrete,
Restoration to Kharsuan left embankment from Paridabad to Sathiatikri
Improvement to Malaguni right embankment from Brahmanpatna to Ostapuri
Restoration work
Restoration work
Muroom, Grd I , II
Road work
Earth Work and Cement Concrete work
MUROOM, SM, PLASTER, CC 1 3 6
Protection to left bank of Machhagaon Main Canal from RD 50.120 Km to 50.220 Km
Civil Works
Stone, earth and concrete work
Earth work and Road work
Restoration work to river bank
RSDP, RIP RAP
EW, MUROOM, DRRT, RSDP, CC 1 3 6
Civil Work
Earth work, Dumping and Packing work
Renovation of spurs
Installation of Street Lights at Taladanda Canal Embankment Road on Right side (NH-16 Junction to Nayabazar Junction) from 3/625 to 5/200 Km on RHS (Kalyani Nagar side), Cuttack under State Plan due to widening and strengthening of above road.