Loading…
Loading…
5,734 results • Best match
Construction of spur on Chitrotpala left embankment at RD 15.800 Km near village Narendrapur for the year 2020-21
Restoration to Brutanga Left Embankment near Rajigir village for the year 2025-26 (RD 8200 m to 9500 m)
Restoration to Kuanria right embankment from Benagadia Bridge to Pathradwar for 2025-26 (RD 0 m to 200 m)
Restoration to Spur on Chitrotpala Left embankment at RD 44.610 Km near village Kumadhi for the year 2020-21
Improvement to Nuna-Karandia right embankment from RD 36.010 Km to 37.417 Km near village Dhiasahi to Kasoti Narayanpur
Protection to Kuanria right embankment near Dindabhuin Play Ground for the year 2025-26 (RD- 13.00km to RD-13.14km)
Construction of Spur with Launching and packing on Nuna Right embankment near village Nankar for the year 2024-25
Restoration to Kuanria left embankment Neliguda Dal Mill, Daspalla (RD 1370m to RD 1620m) for the year 2024-25
M/R to Chitrotpala left Embankment from RD 16.050 Km to RD 39.500 Km for the year 2026-27
Protection to scoured bank on Nalitapatia Talchua Saline Embankment From RD 7.900km to 7.960km on Brahmani right
Improvement to road on Luna -Ratnachira left embankment from RD 4.50 km to 5.70 51 near village Gobindapur
Protection to Scoured bank on river Hansua Right on Keredagada Alatanga Saline Embankment from RD 13890M to 13920M
Protection to Scoured Bank on river Kharasrota right from RD 2610m to 2730m. of OAE 9 B Embankment.
Improvement to Service road on Daya left embankment from RD 23.400 km to 24.00 km near village Neempur
Improvement to K.V. Right Embankment from Patapur School Gada to Bankeswar Temple (from RD 10.500 km to 12.000km)
Protection to scoured bank on Chitrotpala right embankment near village Mahamadpur from RD 29.725 Km to 29.795 Km.
Protection to scoured bank on Chitrotpala Right embankment near village Biswanathpur from RD 30.700 Km to 30.800 Km.
Protection to scoured bank on Chitrotpala Right embankment near village chasakunda from RD 33.305 Km. to 33.375 Km.
Restoration to KSDR Embankment from RD 63.475 Km. to RD 63.500 Km.and RD 63.650 Km. to 63.700 Km
Improvement to Devi Right Embankment from RD 75.50 Km to 80.00 Km (Working RD 76.13 to 79.01 Km)
Improvement to K.V. Right Embankment from Das Sahi Gada to Patapur School Gada (From RD 8.920km to 10.500km)
Protection do scoured bank of C.E. No 44(A) Nuna Left embankment from RD 52.270Km to 52.400 Km
Restoration to Kalapadar saline embankment from RD 4.880 km to 5.18 km(working RD 4.660km to 4.960 Km)
Restoration to Bhargavi Left Embankment from RD 19.40 Km to 23.80 Km (Working RD 20.33 to 22.75 Km)
Protection to scoured bank on Chitrotrpala Right Embankment From RD 43.00Km To 43.090 Km Near Village Bhadalo Matha
Slope protection to Daya left embankment near village Sisuapada UP School from RD 36.550 km to 36.700 km
Improvement to Daya left embankment from RD 10.900 km to 11.00 km near village Orakal (Lunching and packing)
Protection to Kalapadar saline embankment from RD 1.350 km to 1.450 km including river approach near village Kalapadar
Jungle Clearance and repair of C.E.No.44 A Nuna left embankment from RD 56.132 Km to 63.246 Km.
Improvement to road on Bhailipur right flood embankment from RD 2.20 km to 3.40 km neaqr village Rahapur.
Restoration to Bhargovi right embankment from RD 32.100 km to 32.250 km with guard wall near village Kothasahi
Protection to the scoured bank of satagaon saline embankment from RD 17.05 km to 17.100km including slope Packing.
Improvement to Daya left embankment road from RD 21.95km to 22.40km near village Singhaberhampur.(Construction of CC road)
Construction of protection wall from RD 83.200 km to 83.290 km on Bhargavi left embankment near village Talakokal
Improvement to Bhargovi left embankment from RD 56.00 km to 56.800 km(working RD 56.00km to 56.600 km)
Improvement to Devi Right Embankment from RD 79.00 Km to 80.10 Km and 80.70 Km to 82.70 Km
Restoration to Bhargavi Left Embankment from RD 24.75 Km to 27.45 Km (Working RD 25.00 to 27.38 Km)
Protection do scoured bank of C.E. no 44(A) Nuna Left embankment from RD 52.540Km to 52.700 Km
Construction of Hume pipe Drainge Sluice at RD 11.700Km. to 13.200Km. and 14.700Km. of Jharling-Belanga Saline Embankment.
Protection to Scoured bank on Nalitapatia Talchua Saline Embankment on Brahmani Right from RD 9960M to 10050 M.
Protection to Scoured bank of Hansua left from RD 2.005 KM to 2.034 KM on Rajnagar Saline Embankment
Protection to Scoured bank of Hansua left from RD 2.275 KM to 2.305 KM on Rajnagar Saline Embankment.
Construction of Hume pipe Drainge Sluice at RD 8.100Km. to 9.400Km. and 11.200Km. of Jharling-Belanga Saline Embankment.
Restoration to road on Southkania left embankment from RD 16.310 km to 17.160 km (Village Dharanikudi to Naharabali)
Raising and Strengthening of Dhanua Right Embankment (Davar to Bamanal from RD.00 Km to RD.13.00 Km)
Construction of VRB at RD.2.365Km and cement concrete channeling from RD.1.980Km to RD.2.365Km of Kutmanpalli S/M-II, De-silting and Strengthening of Canal embankments at vulnerable reaches from RD.40.309Km to RD.40.930Km of G.M.C.
Slope protection, launching and packing
Protection to scoured bank on K.K right Embankment near Jamudanda from RD 29445 mtr to 29500 mtr
Protection to scoured bank of river Hansua on Keredagada Alatang Saline Embankment from RD 11100m to 11120m
Protection to scoured bank on Righagada Junsunagar Saline Embankment of Patasala Left from RD 7.935km to 7.990km