Loading…
Loading…
856 results • Best match
First phase of construction of umbrella and other development works for beautification of the embankment of Bhutala pond.
Construction of Embankment work at Dumping Yard near Giwariya Basti and at Kotelav area in ward number 15
Second phase of construction of umbrella and other development works for beautification of the embankment of Bhutala pond.
Construction work of Embankment from Giwariya shamsan to Samadhi sthal near Highway and other plaes in ward number 3
Construction work of Embankment at South side Link roads of Akeli road and other places in ward number 19
Construction of buttress wall and Earth Embankment for boundary wall along NH-54 at Industrial Area Hanumangarh Ph-II
Earth filling for road embankment and level improvement at certain place in silari road near by pass pipar city
Construction of buttress wall and Earth embankment for boundary wall along NH-54 at Industrial Area Hanumangarh Ph-II
Repair and Construction of Gravel, Embankment roads at Various palces in ward no 21 to 40 in Municipal area, Niwai.
Repair and Construction of Gravel, Embankment roads at Various palces in ward no 01 to 20 in Municipal area, Niwai.
Construction and Repair of Embankment / Dola / Bund at Nawa Circle Production Areas in the Various Locations of Sambhar Salts Limited
Repair and maintenance of damaged /loosened embankment of Railway track of KTPS, Kota between C cabin Gurla to Sakatpura.
Construction work of Embankment From Bhawani Singhs Farm to Kankar Mathh and Link Road of Sindhlas Marg in ward number 18
Construction of embankment , GSB roads and road side berms and other necessary works at various places in uit sikar Jurisdction Sikar.
Construction of Causeway at Approach Road for Earthen Embankment at Down Stream of Spillway of Takli Dam Under Takli Medium Irrigation Project.
Construction of Face Wall, Vrbs and Renovation of Earthen Embankment And Canals of Danta Dhuwala Talab Village - Danta Tehsil Mandal District Bhilwara
Construction of protection wall along railway track for strengthening of embankment from railway yard to 1st steel bridge at KSTPS, Kota.
Construction work of Embankment at Back side of sriram hospital, Back side of marwar sweet home and Bagra road in ward number 9
Construction of embankment for diversion of water near Shani temple and proposed land for CETP Salarpur on approach road to I/A Khushkhera
Construction work of Embankment at North side Link roads of Akeli road, Pou Dham roads link Road and other places in ward number 20
Const. of Boundary Raising with gate/Toilet Block and Earth Embankment for office, Parking Space at subyard Karauli (F and V) KUMS Hindaun city
Material supply work under MG Narega.
Construction work of Embankment from Madan chowkidar to Maniram Jats home, Jk hotels East and west side road and other places in ward number 2
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Aau
Rate Contract Base Immediate Restoration Work of Flood Damaged Roads under PWD Sub Dn Phalodi
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Bap
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Lohawat
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Setrawa
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Lohawat
Rate Contract Base Immediate Restoration Work of flood damaged Roads under PWD Sub Dn Setrawa
Silt clearance , Rip Rap, Renovation strengthening of banks and embankment repair work of Feedar channel from Bara Weir towards Jaisamand Dam Village Dharmpura P.S. Umrain Alwar
Permanent Restoration Work of flood damaged Roads under Under District Phalodi Package No. 01/2025-26
Permanent Restoration Work of flood damaged Roads under Under District Phalodi Package No. 02/2025-26
Construction work of Embankment from Akeli road to Madan ji, Prahlad ji Mahiya dhani, to Shivlal Ji Mahiya Dhani and Jhijhanda talab to Rampal ji Mahiya farm.
Construction of Approach Road for inspection of Earthen Embankment and Down stream Toe drain and Toe filter of Takli Dam Under Takli Medium Irrigation Project , Ramganjmandi Kota
Construction of storage Tank And Room Embankment along BB Minor for Devlopment of park and Fixing statue in Babsaheb Bhimrao Ambedkar Park Khalsa park Mahatma Gandhi Park and Sahid Smar.
Material supply work under MG Narega.
Providing and laying Crushed Stone on top of embankment of Takli dam for smooth circulation of vehicles for inspection of Dam in Remaining Reaches, Under Takli Medium Irrigation Project , Ramganjmandi Kota
Slope stabilization of embankment of road & buildings by stone pitching & providing and fixing barbed wire fencing with 04 nos. watch tower around Bin Type Magzine building at CTC, ITBP campus, Ramgarh, Alwar (Raj.) Subwork/Packages: Slope ... of embankment of ...
Construction work of interlocking/reinterlocking block and drain from Ummed Khan to Hakam Alis home, Satar to sethhus home and Embankment at Back side of Barkat to Iqbals home in ward number 3
Under the CAMPA scheme, within the Range Bayana the construction of toilets/washrooms at the Forest Guard post in Sita Chhaid, along with maintenance work of the Forest Guard post and construction of an embankment, is being undertaken.
Slope stabilization of embankment of road & buildings by stone pitching at CTC, ITBP campus, Ramgarh, Alwar (Raj.). (SH : Dry stone pitching, chequerred precast cement concrete tiles, kerb stone, cement concrete road, cutting of sandy dunes, 02 nos. tubewell and pump set etc. (work.)
SUPPLY AND STACKING OF EARTH FOR EMBANKMENT FILLING AND SELECTED EARTH STONE METAL 45 MM STONE METAL 40 MM STONE CHIPS 20 MM STONE CHIPS 10 MM COARSE SAND FIRST CLASS BRICKS ROAD VALTOHA DCB UNDER 141 DMC 49 BRTF PROJECT CHETAK IN PUNJAB
Strengthening of water reservoir at RD 507 of IGNP, R and M of Devasar mr RD 0-29.60 and repair of lining, dowel and Strenthening of canal embankment of MGM (Meergarh Minor) at RD 2.7, 8.8 and 17.50, Chattargarh dy and various canal of IGNP Stage-I
GEOTECHNICAL INVESTIGATION FOR SLOPE STABILITY ANALYSIS OF EMBANKMENTS FILLING/CUTTING FULFILLING THE RDSO GUIDELINE BETWEEN CHAINAGE KM 61.000 TO KM 116.654 OF SECTION TRAH-ABR VIA AMBAJI NEW BG LINE PROJECT
Renovation,Strengthning of Embankment and New Construction in Talab G.P. Popawas P.S. Mandore
Renovation,Strengthning of Embankment and New Construction in Nadi/Talab G.P. Ghantiyala P.S. Mandore