Loading…
Loading…
28,702 results • Best match
Project for Anti Erosion work of Bhojpur-Shahpur Bund between Km. 37.700 to 37.900 on left bank of River Rapti in Distt. Siddharthnagar.
Anti-Erosion Measures to Protect of new Law College at Chiripool near Lakhipur from the erosion of river Chiri on its R/B.
Anti Erosion Work For Protection Of Group Of Villages Ramamau, Bevari and Turkwaliya At The Left Bank Of Saryu River In District Gorakhpur.
Anti Erosion work for protection of Cluster of Village-Baundi, Somaipurwa, Bahadurpurwa and Lalaipurwa on left bank of River Saryu in District. Bahraich.
Anti Erosion Work at Cluster of Village Mathudandi Navadiya etc Situated at Left Bank of Deoha River in District Pilibhit Lot No 02
ANTI EROSION WORK NEAR VILL. KUSHAHARI (SHIV MANDIR) ON RIGHT BANK OF LITTLE GANDAK RIVER IN BLOCK RAMPUR KARKHANA, SADAR TAHSIL, DISTT. DEORIA
Anti Erosion Works for Protection of Village Gurani in 230.00M. Length at Right Bank of River Ganga, Block Dhanapur, Tahsil Sakaldiha, District Chandauli.
Anti Erosion Works From Km. 15.230 to 15.930 of Bansi-Panghatiya Bund on Right Bank of Rapti River in Distt- Siddharthnagar. Lot-08
Anti erosion work to protect cluster of Villages Parauri and its Majhre along RB of river Ghaghra in Distt Lakhimpur-kheri LOT-04
Anti erosion work at DS of spur km. 7.825 of Bokta Barwar Bund on the Right Bank of River Rapti in District Gorakhpur
Anti Erosion work for protection of Cluster of Villages - Assipurwa, Nabbepurwa and Puraina Raghunath on Left Bank of River Saryu in District Bahraich.
ANTI EROSION WORK BETWEEN KM 12.000 TO KM 12.500 OF SAHJANWA DUMARIA BABU BUND ON RIGHT BANK OF RIVER RAPTI IN DIST. GORAKHPUR.
LOT 02 ANTI EROSION WORK ON LEFT BANK OF KHO RIVER TO PROTECT VILLAGES TIPERJOT, UMARPUR AASHA AND TIPERJOT BUND IN DISTT. BIJNOR.
Anti Erosion work at right bank of Gumani river in 150 m Lenght at village - Pachhim Tola, from idgah to house of Raijul.
ANTI-EROSION WORK TO PROTECT CLUSTER OF VILLAGE DAULATAPUR, KACHNARA AND KARTARPUR ETC ON R/B OF RIVER SHARDA IN DISTRICT - LAKHIMPUR-KHERI.
LOT-3 Anti-Erosion work near the fort of Maharani Laxmi bai situated on the right bank of river Yamuna in district Jalaun.
Anti Erosion work for protection of Cluster of Village-Patrahiya, Botanpurwa, Bagiyapurwa and Bhagaidaspurwa on left bank of River Saryu in District. Bahraich.
Anti Erosion Work For Protection Of Group Of Villages Pauhariya ,Turkvaliya And Bagha On The Right Bank Of River Rapti In District Gorkhpur.
ANTI-EROSION WORK IN VILLAGE GROUP RAJGARH MATA MANDIR AND JAGPUR SALAMATGARH ON LEFT BANK OF RIVER ROHIN IN TAHSIL SADAR DISTRICT MAHARAJGANJ.
Anti-erosion work for the protection of village groups Srinagar, Kabirganj etc. located on the left bank of Sharda River in Pilibhit district.
ANTI EROSION WORK AT KEWTALIA MAHEN BUND IN BETWEEN KM. 3.400 TO KM. 3.800 AT LEFT BANK OF RAPTI RIVER AT DIST. DEORIA
Anti-erosion measures to Tengakhat bund section -III on R/B of river Buridehing up to Jokai R.F. at 11th and 12th km
Anti Erosion work Near Panchayat Bhawan for Protection of Village Group Chaukakala and Madhavapur on Left Bank of River Rapti in District Balrampur.
ANTI EROSION WORK FOR THE PROTECTION OF BHAGALPUR TOWN IN 330 M LENGTH ON L/B OF RIVER SARYU (GHAGHRA) IN DIST. DEORIA
Anti-Erosion Eeasures to Protect Lallangkitta Laboc Par Part-II near Pailapool area from the Erosion of River Chiri on its R/B.
Anti erosion works for protection of village group Amir nagar, Gularhi etc. located on the left bank of Deoha river in district Bareilly.
Anti erosion work From km. 7.550 to km. 7.800 of Bokta Barwar Bund on the Right Bank of River Rapti in District Gorakhpur
Anti-erosion Work at down Stream of Majara Maghi of Village Group Sherpur Semra on Left Bank of River Ganga in District- Ghazipur.
Anti erosion work From km. 7.550 to km. 7.800 of Bokta Barwar Bund on the Right Bank of River Rapti in District Gorakhpur
Anti erosion works at Harerkhola near bypass embankment under Kamalpur Nagar Panchayet (L-300.00 Mtr), Job No TR/32/FC/NABARD(RIDF-XXV)/2019-2020, Chainage 150.00M to 325.00M Gr-II/II
Flood protection/Anti-erosion works along samrucherra bank for protection of eroded area near the habitation at Rabi charan Choudhury para of Rajnagar VC under Tulashkhor Block/ SH _ Bank revetment work by sand cement block (L_ 125 mtr.) (Job No.TR/3
Construction of 48 Flood protection Anti- erosion structures in 06 districts of Tripura FDR Protection of bank erosion of River Burima at Dyarampara VC under Jampuijala RD Block to protect Bhakta Thakur para Village Road along with the adjacent L
Flood protection/Anti erosion work along the bank of river Howrah near office of the Inspector of School Jirania, West Tripura/SH_-Bank revetment work by providing and placing Cement Concrete Block.(Length-100.00 mtr) (Job No.TR/34/NABARD(RIDF-XXIX)/
Construction of 48 Flood protection Anti erosion structures in 06 districts of Tripura SH Protection of right bank of river Gomati to prevent erosion by providing cement concrete block from Bhuiyabari Dakshinpara to Boxibari LI Scheme at Ward No 08 a
Flood protection /Anti erosion works along Champa cherra Bank for protection of eroded area near Bhatimaidan SB School of Purba Champacherra VC under Tulashikhar RD Block under Khowai Sub-Div/SH_ Bank revetment work by S. C. blocks (L_75m).(2nd Call)
Flood protection /Anti erosion works along Bemulcherra Bank for protection of eroded area adjacent to PWD (R_B) road opposite to Tulashikhar Rajnagar H.S. School of Rajnagar VC..under Khowai Sub-Div/SH_Bank revetment work by S. C. blocks (L_70m)(3rd)
Anti erosion work along the bank of River Dhalai at vulnerable location of Harerkhola near bypass embankment under Kamalpur Nagar Panchayet in Dhalai District of Tripura State(Group-I/II) (Length 150.00 Mtr) (2nd Call).
Anti erosion work cum embankment protection including toe protection of vulnerable formation of newly commissioned BKP ROR rail line and Surface Triangle rail line between Mankatha to Karotapatner under Danapur Division of East central Railway.
Construction of River Training and Bank protection works on Ferozpora Nallah at Bungam Magam Branch, near Bungam Middle School for Restoration of Embankments nearby Habitations affected b mineral extraction
Anti Erosion work to protect cluster of villages Motebaba Godiyana Ramnagar Bagaha situated on R B of River Ghaghra in Distt Lakhimpur Kheri.
Anti erosion work to protect cluster of villages Saraiya kalan, Tediyapurwa and Birsinghpur at R/B of river Ghaghra in Distt. - Lakhimpur-Kheri.
Anti Erosion work to protect cluster of villages Kunja Purwa, Moolchand Purwa and Belagarhi at R/B of River Ghaghra in Distt.Lakhimpur- Kheri.
Anti-erosion work for protection of Budhe Nath Mahadev Baba mandir Saidpur Town Area situated on left bank of River Ganga in District- Ghazipur
ANTI EROSION WORK BETWEEN KM. 0.630 TO KM. 0.942 OF PACHLADI BUND NEAR VILL. BELWA ON R/B OF GURRA RIVER IN DIST. DEORIA
ANTI EROSION WORK FROM KM. 0.000 TO 0.300 OF NEKWAR BOHAWAR BUND AT VILLAGE NEKWAR ON L/B OF GURRA RIVER IN DISTT. GORAKHPUR
Extension anti erosion work for protection of village Mahuji in malah basti at right bank of river Ganga, Block - Dhanapur Tahsil - Sakaldiha Distt. Chandauli.
ANTI EROSION WORK BETWEEN KM 0.500 TO KM 0.810 AT GHYANPUR-BASANTPUR TATBUND ON RIGHT BANK OF RIVER KUWANO IN TEHSIL DHANGHATA DISTRICT-SANTKABIRNAGAR
Anti Erosion Work For Protection Of Group Of Villages Madariya Mallahtoli and Gola Town At The Left Bank Of Saryu River In District Gorakhpur.
ANTI EROSION WORK TO PROTECT CLUSTER OF VILLAGE BINJAHA NAJJAPURWA AND KHUTAUWA ETC ALONG RB OF RIVER GHAGHRA IN DISTRICT LAKHIMPUR KHERI LOT 2
ANTI EROSION WORK BETWEEN KM 17.970 TO KM 18.400 AT MALAUNI BUND NEAR DUMARI VILLAGE ON LEFT BANK OF RAPTI RIVER IN DISTRICT GORAKHPUR