Southwest Monsoon 2019 Flood damage rectification works Restoration and improvement works to the existing BT road from CH3360m to 4420m on the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House 5
South west monsoon 2019 -Flood damage rectification works-Construction of RCC toe protection wall at CH-10130m on the earth slip location on the road leads to approach near KPSHEP work site and PH 6 from Emerald
Southwest Monsoon 2019 Flood damage rectification works Restoration and improvement works to the existing BT road from CH4420m to 5130m on the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House 5
Construction of RCC flood protection wall along the North end boundary from EL 2020.90m to EL 2022.50m of the Proposed 230 KV switchyard at Kattukuppai in Nilgiris District
KUGC works - Reconstruction of flood damaged protection wall on the downstream right flank of Pegumbahallah dam (Kundah PH- 2) for a length of 24m (CH-5 to 29m)
Permanent Restoration to Flood damaged Pipe culvert, CC Drain and Protective wall at Km 5/2 5/4 5/6 5/8 of T.R. Bazaar Terrace estate Road
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 96/6 96/8 96/10 97/4 97/6 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 129/4 129/6 129/8 129/10 133/4 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 122/4 122/6 122/8 123/8 124/8 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6 14/8 14/10 15/2 16/10 of Gudalur Sulthan Bathery Road SH 98
KPSHEP - Emerald- South west monsoon 2019 -Flood damage rectification works -Construction of RCC toe protection wall from CH-9890 to CH-9940m on the valley side of the road leads from Emerald to KPSHEP work site and PH 6
KPSHEP - Emerald - South west monsoon 2019 - Flood damage rectification works-Construction of RCC toe protection wall from CH-9840 to CH-9890m on the valley side of the road leads from Emerald to KPSHEP work site and PH 6
Southwest Monsoon 2019 Flood damage rectification works Construction of RCC Retaining wall from CH 5167 m to CH 5182 m on the valley side of the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House 5
South West Monsoon - 2019 - Flood damage rectification works - Construction of RCC wing wall on both the flanks of the upstream side of Kattukuppai bridge at CH-8210m on the existing road leads to PH - 6 from Emerald in Nilgiris District.
Southwest Monsoon 2019 Flood damage rectification works Restoration and improvement works to the existing BT road from CH 5130 m to CH 5840 m on the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House 5
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing Gabion wall from CH-9866m to CH-9892m over the existing toe protection wall on the valley side of the road leads from Emerald to PH-6 site in Nilgiris district.
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing Gabion wall from CH-9840 to CH-9866 over the existing toe protection wall on the valley side of the road leads from Emerald to PH-6 site in Nilgiris district.
Southwest Monsoon 2019 Flood damage rectification works Construction of RCC Retaining wall from CH5152m to CH5167m on the valley side of the existing BT road on the road leads to Lakkadi branching from the Emerald Avalanche Road Nearer to Power House
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 4/8 4/10 6/6 7/10 8/2 8/4 of Gudalur Sulthan Bathery Road SH 98
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10 1/2 1/4 of Road from km 25/4 of Gudalur Sulthan Bathery to Palamvayal Road
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing Gabion wall in between CH-10080m to CH-10115m over the existing toe protection wall on the valley side of the road leads from Emerald to PH-6 site in Nilgiris district.
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing Gabion wall in between CH-10115m to CH-10150m over the existing toe protection wall on the valley side of the road leads from Emerald to PH-6 site in Nilgiris district.
Construction of Flood Protection Wall in New KKI Houses Area at Kottakudi Village of Kottakudi Panchayat at Bodinayakkanur Block in Theni District under 6th Central Finance Commission 2024-25 ( OMDGF Hilly Villages)
Permanent Restoration to Flood damaged Protective wall at Km 5/2 6/2 6/6 8/4 8/6 14/10 and 15/10 of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 18/2 18/6 18/8 19/4 19/6 19/10 20/2 of Sulthan Bathery Cherambadi Road MDR
Permanent Restoration to Flood damaged Protective wall at Km 0/8 0/10 1/2 1/4 1/8 1/10 and 4/10 of Ooty Kotagiri Mettupalayam Sathy Gobi Erode Road
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 101/2 101/4 101/6 101/8 101/10 102/4 102/8 102/10 of Calicut Vythiri Gudalur road SH 12
KPSHEP / Emerald South West Monsoon 2019 Flood Damaged rectification works Repair and Renovation of S type Quarters (Block No.2) and construction of protection wall on rear side in the PH 6 camp in Nilgiris District.
BT work
Supply and Laying of Cementitious Concrete Geosynthetic Mattresses (CCGM) to arrest the leakage and sustain the slope protection of embankments of Kadamparai Dam in Coimbatore District, Tamil Nadu (PACKAGE VII) under World Bank funded DRIP II.
Construction of RCC Retaining wall in Cuddalore -Chittoor Road in High Embankment of Tank Bund near NHAI Byepass in Tiruvannamalai Town-TVM-96
Providing Slope Protection at Breached road stretch in high embankment at km 1/6 of Magaral - Kavanthandalam Road (01-CRIDP-22- 23-O-0876)
Widening and Strengthening, Improvements to Riding Quality including Reconstruction of Culvert, providing Embankment protection works in Govt. Roads in respect of Papanasam HCandM Subdivision TRY-29
Widening, Strengthening including Construction Retaining wall, providing Embankment protection work, Reconstruction of Culvert works in Govt. Roads in respect of Orathanadu H CandM Subdivision (TRY-24)