Loading…
Loading…
384 results • Best match
Earthwork in forming embankment, construction of track machine office building, store shed, approach road etc., in connection with Provision of full length Shunting neck and three stabling lines between TPJ and GOC stations.
Flood Damage Rectification Works Construction of PCC Retaining wall and formation of side drain along the cutting side of road leading to Drainage gallery of Emerald Dam near Emerald camp
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2 0/4 0/6 of Sand Hills Road
Permanent Restoration to Flood damaged Slab culvert, Pipe culvert and Protective wall at Km 5/10 of T.R. Bazaar Terrace estate Road
Permanent Restoration to Flood Damaged Protective wall at km 4/2 of Palada Lovedale Road including CC Drain and Paver Block Pavement
Permanent Restoration by Constructing minor bridge at Venkatrayapuram to Veeranamcheri Road in S Venkatrayapuram Panchayat in Nanguneri Block
Construction of RCC flood protection wall on the right bank of the stream near North east corner of the proposed 230KV switch yard.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 105/6 105/8 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood damaged Protective wall at Km 6/4 6/8 6/10 7/4 and 7/6 of Dhavani Road
Permanent Restoration to Flood damaged Protective wall at Km 7/8 7/10 8/2 and 9/8 of Kagguchi Kookal Kookalthorai Road
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 105/2 105/4 of Calicut Vythiri Gudalur road SH 12
Flood damage repairs to Protective wall Cross Drainage works at km 125/4 125/10 126/2 126/4 127/2 127/4 127/10 of Calicut Vythiri Gudalur road SH 12
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works - Providing PCC retaining wall on the cutting side in between CH-8950m to CH-9450m on the road leads PH-6 from Emerald.
1.Providing Paver Block Road -5Nos 2.Providing Street Culvert-5Nos 3.Providing Drainage-2Nos 4.Providing Flood Protection wall-1Nos at Ammapatty Panchayat
Improvement works on the downstream side of the Periyar Vaigai 3 Weir by providing cladding wall to protect the left flank embankment and allied works at Periyar Vaigai Small Hydro Electric Power Station in Theni District
South West Monsoon 2019 -Flood damage rectification works- Construction of Retaining wall from chainage between Ch.5495m Ch.5655m along the cutting sides of the road leading to Porthimund from Power House 6
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 115/6 115/8 115/10 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall at km 4/6 4/8 5/6 and 6/2 of Thangadu Edakadu Road including CC Drain
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works and Interlocking paver block at km 107/4 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 7/2 7/6 7/8 7/10 of Hellan Yellamalai Periasholai Road
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works and Interlocking paver block at km 107/2 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/10 3/2 3/6 of Gudalur Sulthan Bathery Road SH 98
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 103/8 103/10 104/2 of Calicut Vythiri Gudalur road SH 12
South West Monsoon 2019 Flood Damage rectification Works - Providing PCC Retaining wall and Gabion wall from Ch.5326m to Ch.5342m along the filling side of road leading to Porthimund from Power House - 6
South West Monsoon 2019 -Flood damage rectification works Construction of Retaining wall along the cutting side nearer to the Hairpin Bend. (No.6/18) on the road leading to Porthimund from Power House 6
KPSHEP - South West Monsoon - 2019 - Flood damage rectification works Construction of PCC retaining wall on the cutting side in between CH-9450m to CH-10120m on the road leads to PH-6 from Emerald.
South West Monsoon 2019 - Flood damage rectification works- Providing RCC hume pipe culvert and RCC wall across the stream near CCVT portal on the road leads to PH -6 from Emerald in Nilgiris Dt
Construction of Toe wall and Turfing in high embankment portion of approach road in the main work of Construction of high level bridge at Km. 0/4 of Peyadikottai to join Thiruvadanai (via) Sirugampur, Vellaipuram Road (Sub work).
South West Monsoon 2019 -Flood damage rectification works-Construction of Retaining wall along the cutting side from Ch.2427m Ch.2547m nearer to the Hairpin Bend (No.4/4) on the road leading to Porthimund
South West Monsoon - 2019 - Flood damage rectification works-Construction of RCC wing wall on the downstream side of the existing bridge to avoid further erosion and to protect the approach road to switchyard near Kattukuppai
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 14/6 14/10 15/2 15/8 of Sulthan Bathery Cherambadi Road MDR
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/2 0/6 1/2 1/8 4/6 of Nellakottai Devala Road
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 13/8 14/4 14/6 15/8 16/4 of Nellakottai Devala Road
Permanent Restoration to Flood Damaged Protective wall Cross Drainage works at km 0/4 0/6 of Calicut Vythiri Gudalur Road to Ayyankolly via Kolappali Road
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 16/2 16/8 17/6 17/8 of Sulthan Bathery Cherambadi Road (MDR).
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 0/6 1/2 1/4 1/6 of Pandalur Uppatti via Koomola Road
South West Monsoon 2019 - Flood damage rectification works- Construction of PCC retaining wall on the valley side in between CH 8985 to CH 9085 on the road leads to PH-6 from emerald in Nilgiris Dt
Temporary Restoration for Flood Damage Roads Ward No8 Vendravasi Amman Koil Street,Pudhu Street and Manavigal Viduthi SalaiLadies Hostel Road Ward No.9 Vembadi Vinayagar Koil Sandhu St Panchayat Union School Road AT Thirupporur Town Panchayat
KPSHEP / Emerald South West Monsoon 2019 - Flood damage rectification works-Construction of PCC Retaining wall from CH-2980m to CH-2995m on the valley side of the road leading to lakkidi branching from Emerald-Avalanche road.
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/8 4/10 5/8 8/6 10/4 of Gudalur O valley Road
Permanent Restoration to Flood Damaged Protective wall at km 26/2 26/6 28/6 and 29/4 of Udhagai Avalanchi Kundha Thaishola Road Including CC drain
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 116/6 117/2 117/4 117/6 of Calicut Vythiri Gudalur road SH 12
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 103/10 104/8 104/10 106/2 of Calicut Nilambur Gudalur road SH 11
Permanent Restoration to Flood Damaged Protective wall at km 1/4 1/10 2/4 and 2/6 of Udhagai Avalanchi Kundha Thaishola Road including CC drain
Permanent Restoration to Flood Damaged Protective wall at km 0/10 1/2 2/8 of M. Palada B.Manihatty via Kallakorai Hada Gandhinagar Road including CC Drain
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 3/10 4/2 4/8 5/6 6/6 of Devala Atikunna Uppatti Road
Permanent Restoration to Flood Damaged Protective wall at km 21/4 21/6 23/6 and 23/8 of Udhagai Avalanchi Kundha Thaishola Road including CC drain
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 106/4 106/6 107/4 108/2 of Calicut Nilambur Gudalur road SH 11
Permanent Restoration to Flood Damaged Protective wall / Cross Drainage works at km 9/10 11/6 12/4 13/6 of Gudalur Sulthan Bathery Road SH 98
South west monsoon 2019 -Flood damage rectification works-Construction of RCC toe protection wall at CH-10080m on the earth slip location on the road leads to approach near KPSHEP work site and PH 6 from Emerald