Loading…
Loading…
8,511 results • Best match
Construction of Cement Concrete road over Kaliaghai Right Embankment at Talchitkini from Tripally Sangha Club to near HO Ratikanta Bhunia for a length of 1.450 Km in G.P-Chistipur-1, Block-Patashpur-I, P.S- Patashpur, Dist.- Purba Medinipur.SSM
Repair of damaged left and right embankment of Chetua Khal due to repair of damaged GAIL Gas pipeline on three spots for a total length of 120.00 mtr. at Mouza-Chandanapara, Block-Bagnan-II, P.S-Bagnan, District-Howrah.
Reconstruction, remodeling and Improvement of Embankment in Sundarban and adjoining areas in the district of North 24 - Parganas, West Bengal, damaged by severe Cyclone AILA on the right bank of river Kalindi at Mouza- Malekangumti in Block P.S. H
Emergent closing of breach and severaly damaged Sundarban Embankment due to VSCS YAAS near h oChotur sardar to Basomata fishre at mouza Atapur for a length 320.00 m along the right bank of river Raimongal in Block Sandeshkhali II
Maintenance and repairs of right ExZamindary embankment of river New Cossye for a length 142 m damaged due to heavy rainfall from 30.09.2023 to 04.10.2023 and flood discharge near house of Chandan Roy in Mouza Purba Dobandy Block Moyna
Emergent restoration to Hooghly river left embankment damaged due to severe cyclonic strom REMAL on 26.05.2024 synchronized with purnima kotal from 23.05.2024 to 27.05.2024 in between 12.00 km to 12.06 km for the length of 60.00m near Pujali Paulpara
Emergent restoration of left side approach road of Churni bridge at 9.150 kmp towards Shibnibash more of Shibnibash- Bajitpur road due to sudden slip-circle failour of embankment under Krishnagar Highway Sub-Division. No-II of Nadia Highway Division.
Restoration of Bank slip of left bank of Baghi River H/O of Jaydeb Ghorui and Panchanan Barman different locations of Gokulpur Circuit Embankment (Length of work -55) in Mouza- Kazipatna,Block -pataspur -I ,P.S-pataspur and Dist- PurbaMedinipur.
Maintenance and repairs to severely damaged Sundarban Embankment in between 16.10 Km. to 16.30 Km. along R/B of river Matla near Gharbeki at mouza Budhakhali, Block Canning-I, P.S Canning, Dist-South 24 Paraganas under Joynagar Irrigation Division.
Urgent restoration of Sundarban river embankment for a length of 250.00 m. Near Rani Fishery of L/B of river Biddya at Mouza Daudpur, Block Sandeshkhali II in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Irrigation Div
Protection of left bank of river Shilabati for a length of 1600 Metre at Mouza Krishnanagar, Kantapal and Bhattugram, GP Benachapra, Block Garhbeta I, PS Garhbeta and on left embankment of river Shilabati for a length of 400 Metre
Health check up of left Fulahar embankment from ch. 19.00Km to 25.00 Km from pump house to Kalimandir to identify the ghoges and weaker section in Block- Harishchandrapur-II and Ratua-I, P.S.-Harishchandrapur-II and Ratua, Dist- Malda
Immediate repair to sundarban embankment from ch. 12.100Km. to ch. 12.453 Km. affected during kotal 19.8.2020 to 21.8.2020 syncronised with easterly wind for a length of 353.00 M, along right bank of river-Muriganga at Mouza-Sumatinagar under Sagar
Repair and Maintanence of Raincut and Ghogs of Mahananda Embankment Barsoi branch in between ch 23.500 KM and 24.850KM for a length of 265m at Village-Islampur, GP Kharba, Block Chanchal-I, PS-Chanchal, Dist.-Malda under MESD-II
Emergent restoration to Hooghly left embankment damaged due to severe cyclonic strom REMAL on 26.05.2024 synchronized with Purnima Kotal from 23.05.2024 to 27.05.2024 for a length of 200 m at Madhabpur, Ward No-10, Mouza-Madhabpur, P.S-Dimond Harbour
Emergent restoration of severely damaged Sundarban Embankment during New Moon Kotal from 18.05.2023 to 20.05.2023 for a length of 200.00 m. at Chhoto Sehara, Mouza Choto Sehara, G.P. Sehara Radhanagar, Block Sandeshkhali I, along R B of river -Dansa
Embankment strengthening for exzamindary of Hurhura left Bank a total length of 550.00 Mtr. At Takipara from Jiban Bhowmik house to Swapan Bhowmik house (Length of 450.00 Mtr.) Jariful Hazra House to Aziz Hazra House (length100.00M) in GP-Kashmol
De-siltation ,strengthening of embankment of Trimohini Khal from downstream of confluence of Pakhimara Khal at chainage 10.82 KM to confluence of Nowi Khal upto chainage 16.110 KM for a length of 5.29 KM to ease out drainage congestion
Reconstruction of four vent Sluice cum RCC Bridge over Chetua Circuit embankment at Ranichak within Block Daspur II PS Daspur Dist Paschim Medinipur under Ghatal Master Plan in connection with the work Construction of 5 nos. of minor sluice
Maintenance and repairs of right ExZamindary embankment of river New Cossye for a length 38 m damaged due to heavy rainfall from 30.09.2023 to 04.10.2023 and flood discharge near house of Netai Dolai in Mouza Paschim Raybundh Block Panskura
Emergent restoration of Sundarban embankment damaged due to severe cyclone strom REMAL on 26.05.2024 synchronized with Purnima Kotal from 23.05.2024 to 27.05.2024 facing River Matla(L/B) in between 36.25 km to 36.75 km. at mouza-Garanbose 2 (Gangam
M/R to damaged sundarban embankment in between Ch. 8.600 km to Ch. 8.900 km for a length of 195.0 m at Mouza- Sitarampur facing river- Jagaddal under Patharpratima Irrigation Sub Division of Kakdwip Irrigation Division within Block- Patharpratima
Emergent Restoration of Sundarban River Embankment damage along the right bank of River Sahebkhali for a length of 60 M near 13no Amberia sluice Mouza Amberia in Block P.S Hingalganj of Hingalganj I Sub Division under Basirhat Irrigation Divn.
Emergent restoration of Sundarban embankment damaged due to severe cyclone strom REMAL on 26.05.2024 synchronized with Purnima Kotal from 23.05.2024 to 27.05.2024 facing River Matla(L/B) in between 11.50 km to11.85 km. at mouza-Goranbose-1 in Block
Emergent restoration of severely damaged Sundarban Embankment due to Purnima kotal from 05.04.23 to 07.04.23 in between 42.71 km and 42.91 km in mouza Birinchibari along river Bidya in Block Basanti, P.S. Jharkhali, District South 24 Pgs under JID.
Urgent restoration of sundarban river embankment for a length of 180.00 m. of R B of river Barokalagachi at Mouza Atapur, Block Sandeshkhali II in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Irrigation Division in the d
Restoration of Sundarban river embankment for a length of 240.00 m. of R B of river Tushkhali near Tushkhali ICDS Centre at Mouza Bhanga Tushkhali, Block Sandeshkhali II in the jurisdiction of Kalinagar Irrigation Sub Division under Basirhat Ir
Emergent restoration of damaged Sundarban river embankment during Purnima Kotal along with incessant rainfall from 27.08.2025 to 11.09.2025 facing River Benti(L B) for a total length of 60.00 m near HO Jamsed Sardar at Ghoshpur, Mouza Kalinagar, G
Emergent Restoration to damaged sundarban embankment at Jhawtala bend at Ward no 2 under Taki Municipality for a length of 100 Metre along the right bank of river Ichamati Dist.North 24 Parganas under Basirhat Irrigation Sub Division of Basirhat
M/R to damaged Sundarban Embankment in between Ch. 24.000 KM. and 24.600 Km. for a length of 75.00 m and 5 nos ghoges facing river Gobadia in mouza- Kamdebnagar under Patharpratima Irrigation Sub Divnision of Kakdwip Irrigation Division
MR to canal by resectioning and strengthening of embankment in between ch. 0.00 to ch.250.00 and Engagement of daily labour for emergency purposes with supplying earth filling gunny bags to overcome any emergency repair work during Khariff watering
Emergent Restoration of Sundarban Embankment Damaged due to Full Moon Kotal from 14.08.2025 to 26.08.2025 facing River- Bidyadhari (R/B) near House of Khokan Mondal for a length of 60.00 m, Mouza-Kharihat Abad , G.P.-Khariyat , Block- Sandeshkhali-I
Restoration of Sundarban Embankment damaged for a length of 150 Mtr. along the R B of River Gomoti Near Hemnagar Kalibari at Mouza Hemnagar in Block Hingalganj under Hingalganj (I) Su Division in the Jurisdiction of of Basirhat Irrigation
Restoration of slip near Zardoi wooden bridge on Buxi right embankment for a length of 140m due to heavy rainfall from 19.08.2020 to 28.08.2020 in Mouza Zardoi and Gobindapur GP Haur Block and PS Panskura under East Midnapore Division
Emergent Restoration of Sundarban Embankment damaged on dated 18-02-24 in between 1.25 km to 1.56 km at mouza Dayapur facing Left bank of river Gomor in Block - Gosaba, P.S.- Sundarban Coastal, Dist-South 24 Paraganas under JID
M/R to damaged Sundarban Embankment inbetween ch.6.530 and 6.530km, ch. 6.530 and 6.900, for a length of 347.00 M along Left Bank of river Hooghly at mouza Sapkhali under Sagar I Sub-Division of Kakdwip I Division.
Construction of concrete road from House of Santosh ch Jana to Kansabati Rivar Embankment PMGSY Road at mouza-Ganja and Dokanda Plot No 83 and 06, JL No 93 and 89, Ghoshpur GP, Panskura-I Dev. Block, Purba Medinipur.
Emergent closing of breach and severely damaged Sundarban Embankment damaged due to VSCS YAAS near Garh Kuyati at Mouza Uchildah for a length of 300m along right bank of river Buri Block Minakhan and P.S.Haroa under Basirhat Irrigation Division
Restoration of Sundarban Embankment for the of length of 45 metre along L B of Amlani Khal Near Hasnabad BOP at Mouza Laskarnagar in Block Hasnabad, under Hingalganj (I) Sub Division of Basirhat Irrigation Division, District North 24 Parganas.
Restoration of Sundarban Embankment damaged near Paidamari Ring at Mouza Bachra Abad,Block Minakhan for a length of 170 m along Right bank of river Metia under Haroa I Sub Division of Basirhat Irrigation Division ,District North 24 Parganas.
Restoration of Sundarban Embankment near H O Sakchu Sardar at Mouza Sarabaria,Block Minakhan for a length of 200 m along Left bank of Jagannath Khal under Haroa I Sub Division of Basirhat Irrigation Division ,District North 24 Parganas.
Emergent repair of severely damaged Sundarban Embankment damaged due to VSCS YAAS for a length of 160 m near Pakhiralay Mouza Khariat G.P. Boyermari I Block Sandeshkhali I along Right Bank of River Bidyadhari of Haroa Irrigation Sub Div
Emergent restoration to severely damaged Sundarban embankment damaged due to VSCS YAAS along the left bank of river Sahebkhali near Kachari Ghat School Bari for a length of 475 at Mouza Ramapur in Block Hingalganj under Basirhat Irrigation Divisi
I/R to damaged sundarban embankment near jetty ghat of indrapur for a length of 180 m. From ch. 8.900 km to 9.080 km facing river Jagaddal at mouza Indrapur under Patharpratima Irrigation Sub-Division of Kakdwip Irrigation Division
Protection of embankment at the approach of Culvert from chainage 6.06 Km to 6.09 Km and 6.12 Km to 6.15 Km of Damda-Chakoltore-Daradi-Kenda-Manbazar Road (SH-5) under Purulia Highway Division in the District of Purulia.
Emergent restoration of damaged river side slope of Hooghly Right Embankment for 50.00 M affected length by rectangular Sausage filling witth polybags by Brick Bats near Sk. Anowar Ali land at Banstala in Ulu. Municipality under Seij(I) sec.
Emergent restoration to sundarban embankment damaged due to severe cyclonic storm REMAL on 26.05.2024 synchronized with Purnima Kotal from 23.05.2024 to 27.05.2024 facing River-Sarsa (L/B) in-between 11.60 km to 11.95 km at Mouza-Kumirmari, P.S.- S
Maintenance and repair to Titi Bangri Embankment at Ch 370m to Ch 460m and Ch 650m to Ch 770m along the left bank of river Titi Bangri in Block and PS Madarihat Dist Alipurduar for the year 2021 22
Short Term measures at Sunukpahari black spot location at Bankura Khatra road (SH-2) at 16.00 kmp with Boulder sausage work in GI Crate construction of Embankment with materials obtained from borrowpit Water Bound Macadam Sub-Base by consolidatin
Emergent restoration of Sundarban river embankment near H o Manabendra Mondal at Mouza Dholkhali Block Sandeshkhali II for a length of 85 metre along the left bank of river Dansa under Hingalgangal I Sub Division of Basirhat Irrigation Division.