Loading…
Loading…
8,513 results • Best match
Emergent closing of breach and severely damaged Sundarban Embankment damaged due to VSCS YAAS from land of satish sardar to land of Bhopal Das at mouza Atapur for a length 125.00 m along the right bank of river Barakolagachi in Block Sandeshkhali I
M/R to S/E by Supplying of empty cement gunny bags/ polythene bags, nylon cage netting for immediate restoration of damaged embankment under Kultala (I) Sub-Divn, Dist- (S)24 Pgs under JID in Block- Kultali, Joynagar-II, P.S- Kultali, Maipith costal
Emergent Restoration of Sundarban Embankment damaged due to Amabasya kotal on dated 11-03-24 in between 22.65 km to 22.70 km at mouza Pakhirala facing Right bank of river Gomor in Block and P.S.- Gosaba, Dist-South 24 Paraganas under JID
MR to Dy4 of SMC through canal bank repairing embankment strengthening renovation of Canal lining at Vulnerable filling zones in between Ch. 17.50 to Ch. 29.50 LS with construction of a Hume Pipe Culvert at Ch.28.50 under K.C. Sub-Division No II.
M/R to damaged Sundarban Embankment by making ring bundh for a length of 360 M along right bank of Muriganga in between ch.2.850 Km and ch. 3.210 Km at Mouza- Ghorama under Sagar irrigation Sub-Division of Kakdwip Irrigation Division.
Emergent repair of rain cuts and repairing approach road on countryside slope in between 3.60 km to 6.10 km of ajoy Right Embankment near village Bilsonda Talbaganin Block PS-Ausgram-II in Dist Purba Bardhaman Bhedia (I) Section No-I of Guskara
Survey work for computation of river depth characteristic by taking cross section at suitable interval by using Acoustic Doppler Current profiler (ADCP) method across the sea up to 300 M along sea up to 60 M across country side toe of embankment
E/R of Sundarban Embankment damaged due to Amabashya Kotal on 16.08.23 to 19.08.23 in between 9.965 Km. to 9.990 Km. at Mouza Chotomollakhali facing right bank of river Sarsa in Block Gosaba, P.S.- Sundarban Coastal, Dist.- South 24 Pgs (2nd Call)
Emergent Restoration of Sundarban Embankment damaged due to Purnima kotal on 29.09.23 to 03.10.23 in between 0.00 km to 0.300 km at mouza Dayapur facing left bank of river Gomor in Block - Gosaba, P.S.-Sundarban Coastal, Dist - South 24 Pgs under JID
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 1.300 km to 1.410 km at mouza Satjelia facing L/B of R/Gomor in Block-Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Pgs under JID
Protective works of the road embankment adjacent to abutment wall of RCC Box Bridge over Kandor at 5.41 Km and Kumud Bridge at 9.20 Km of Kashemnagar-Natunhat-Sreekhanda Road under Bhatar Highway Sub-Division No. - I of Burdwan North Highway Division
I/R to damaged sundarban embankment affected during Kotal from 19.08.2020 to 21.08.2020 syncronized with easterly wind for a length of 230.00 m from from ch.1.400 km to ch.1.630 km at Mouza- Gobardhanpur facing Bay of Bengal under Patharpratima Ir
Emergent restoration to Sundarban Embankment damaged on 08.09.2025 due to Full Moon Kotal along the river Goureswar (R B), Near L O Pradip Gain at Mouza Bispur for a length 80.00 metre in Block - Hingalganj of Hingalganj (I) Sub-Division under Basi
Restoration of damage embankment due to existing road side water body near chainage 0.320km(L/S) of Sasan Station to Durgapur Station connecting Road in the district of South 24 Parganas under South 24 Parganas Division, PWD during the year 2024-2025
I/R to damaged sundarban embankment for a length 200m from ch.9.20km to 9.40km affected due to super cyclone Yaas on 26.05.21 on the left bank of river Muriganga at mouza- Sibkalinagar Block- Kakdwip P.S- Kakdwip, Dist- South 24pgs under Kakdwip Irr
Urgent restoration to damage by repair of slip slope failure over Right Ex-Zamindary Embankment of Amrakhali Khal for a length of 30 Meter at River side near house of Anup Sahoo at Mouza-Bishnupur, GP- 13 No. Bishnupur in Block PS- Sabang
Construction of concrete Toe of Sundarban embankment for a length of 130 mtr at 1 no jetty at mouza-Kachuberia on the right bank of river-Muriganga under Sagar Irrigation Sub-Division of Kakdwip Irrigation Division in connection with Ganga Sagar Mela
Emergent protection and restoration work by slip repair and strengthening of flank from ch. 16.500 km. to ch. 16.700 km. of TE3H2 embankment (L/B of river New Cossye) to reduce vulnerability of people due to flood during monsoon-2021 at Mouza-Makar
M/R to damaged Sundarban Embankment by constructing dwarf bundh at mouza Chotomollakhali (4 No. Sheet) in between Ch. 10.00 K.M. to Ch. 10.50 K.M. facing r/b of river Sarsa, Block Gosaba, P.S. Sundarban Coastal under Joynagar (I) Divn in S24 Pgs.
Maintenance and Repair to Sisamara Embankment for a length of 150 meter in between Ch.- 2250m to Ch- 2300m and Ch.- 2650m to Ch- 2750m along the Right bank of river Sisamara in G.P SalkumarI, Block- Alipurduar-I, P.S.- Alipurduar, Dist.- Alipurdu
FPM of right embankment of r/Damodar in between Ch. 16.00 km and 21.00 km for a length of 5.00 km. from Rasulpur Rail crossing to Mukherjee para in G.P. Chilladangi, Block Pursurah, District Hooghly under Champadanga Irrigation Sub-Divn of LDID.
Urgent repair of slip/slope failures occured due to rainfall at sabang and its upper catchment areas from 30.07.24 to 02.08.2024 over Left Embankment of River Kapaleswari for a length of 15 Meter at country side near Gangathan Sluice at ch-13.80km
Emergent restoration of Sundarban river embankment damaged during Full Moon kotal from 27.08.2025 to 11.09.2025 for a length of 30.00 m. of L B of river Kantakhali near H O Ranajit Raut at Mouza Bhurkunda, Block Hasnabad in the jurisdiction of K
Urgent restoration to damage by repair of 2 Nos. slip failure over Left Embankment of Banskona khal length of 40m at river side near HO Radhanath patra and River side near HO Rajkumar Samanta length of 35m at Mouza-Chakmadhab Block sabang.
M/R to Sundarban Embankment in between 28.38 km to 28.50 km for a length of 120 m. in Mouza Nagendrapur facing River Pukchora in Block-Mathurapur-II, P.S.- Raidighi, Dist - South 24 Parganas under Joynagar Irrigation Division during the year 2023-24
Restoration of Sundarban Embankment for a total length of 200 metre along L B of river Dansa at Durgapur near H o Naren Das at Mouza Durgapur in Block Hingalganj, under Hingalganj I Sub Division in the jurisdiction of Basirhat Irrigation Divisio
Urgent Repair of slip/slope failure over Right Ex-Zamindary Embankment of Bonai Khal for a length of 35.00 Metre at River side near Ghusinga Hume pipe sluice at Mouza-Ghusinga, GP-06 No Chaulkuri in Block PS-Sabang and Dist.-Paschim Medinipur.
M/R to right embankment of river Darakeswar for a length of 100 m at Bali Moszidtala and near Bhaghya Parta House within GP-Bali, Block- Goghat-I and P.S- Goghat, Dist- Hooghly under Arambagh (I) Sub- Division Lower Damodar (I) Division.
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 3.800 km to 3.860 km at mouza Kumirmari facing L/B of R/Puinjali in Block-Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Pgs Under JID
Emergent repair of Sundarban embankment damaged due to New Moon Kotal on 23.08.25 along River Ichamati(R/B) near Kalutala brick field for a length of 70 Mtr. at Mouza- Kalutala, Block- Hasnabad under Hingalganj (I) Sub-Division in the jurisdiction of
Urgent restoration to damage by repair of slip slope failures over Left Ex-Zamindary Embankment of Kalchity Khal for a length of 45 Meter at River side near Baharkundra wooden bridge at Mouza-Baharkundra, GP- 12 No. Bural in Block PS- Sabang
Procurement of flood fighting material at Bolpur Sub Division office campus alongwith watching and guarding of Ajoy left Embankment in between Ch. 0.00 KM to Ch. 7.62 KM during monsoon period for the year 2023 under Bolpur (I) Sub-Division of Mayurak
M/R to damaged Sundarban Embankment in between Ch.8.52 km and Ch. 8.60 Km for a length of 80 m at Mouza Mrinalnagar, Block-Kakdwip on the left bank of river Banstala under Kakdwip irrigation Sub- Division of Kakdwip Irrigation Division
Restoration of 1 one number slip over Right Embankment of River New Cossye TE1H1 from ch 28.150 km ch 28.250 km to for a length of 100 Meter at Country side at Mouza Shaldhori in Block P.S Debra and Dist Paschim Medinipur
Emergent Restoration of Sundarban Embankment damaged due to Purnima Kotal from 04.11.25 to 09.11.25 in between 6.200 km to 6.250 km at M/Kumirmari facing Left bank of river Sarsa in Block-Gosaba, P.S.-Sundarban Coastal, Dist-South 24 Pgs under JID
Repair and Maintenance of Raincuts, slips, pot holes and Ghogs of Mahananda Embankment (Barsoi Branch) in between Ch.-25.50 Km to 28.20 Km for a length of 471 m at village-Islampur, G.P.-Kharba, Block-Chanchal-I and II, P.S.-Chanchal, Dist.-Malda
I/ R to Damaged Sundarban Embankment affected during Cyclone YAAS on 26/05/2021 from ch 16.500 km to ch. 16.650 km for a length of 150 m along river Saptamukhi in mouza - Durbachoti under Patharpratima Irrigation Sub - Division of kakdwip Irriga
Urgent repair on left embankment of Hooghly river adjacent to the North side of F.C.I godown in P.S. Budge Budge, Block Budge Budge I, Ward No.5 of Budge Budge Municipality due to extremely sever cyclonic strom YAAS under Canals Division. (3rd Te
M R to Sundarban embankment for a length of 300.0mtr (57.80-58.10) at mouja-Kuemari Facing River-Nakchara, for the year 2026-27 under Joynagar Irrigation Division, Block,PS- Patharpratima, Dist-South 24 Parganas.(2nd Call eNIT 05 EEII 25 26, Sl 22)
MR to Sundarban Embankment at Mz-Nagenabad facing river-Gurakhal inbetween 28.700 km. to 29.000 km. in Block - Kultali, P.S - Maipith coastal under Kultala (1) Sub-Division Dist. S24 pgs Under JID.(2nd Call of eNIT 05(e) 25-26 Sl 28)
Emergent restoration to sundarban embankment damaged due to New moon kotal from 11.08.2026 to 15.08.2026 for a length of 50 M from Ch. 10.200 Km to 10.250 Km at mouza-Krishnanagar on left bank of Phuldubi Khal under Sagar Irrigation sub-Division
M/R to damaged Sundarban Embankment in between 5.49 Km. to 5.65 Km for a length of 160 mtr. at mouza Sonakhali along the Right bank of river Hogol in Block and P.S. - Basanti, Dist. - South 24 Parganas under Joynagar Irrigation Division.
Emergent restoration to Sundarban Embankment damaged due to Full moon Kotal on and from 30.06.2026 to 03.07.2026 for a length of 50.00 M from Ch. 11.50 Km to Ch. 11.550 Km at Mouza - Mandirtala in Block-Sagar facing left bank of Hooghly under
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal on from 30.07.2026 to 03.08.2026 for a length of 200 m inbetween Ch. 16.42 km and Ch. 16.71 km facing L/B of River Curzon creek in mouza-Satyadaspur under Patharpratima
Protection work to the right embankment (river side) in between 31.50 Km to 31.60 Km of Kalaighai River near Amtala for the length. for a length. of 35.00m at Mouza - Taladehia, G.P.-Amarshi -II, Block-Patashpur -I, P.S. -Patashpur and Dist. - Purba
MR to Sundarban Embankment from Ch 10.260 kM to Ch 10.360 kM for a length of 100.00 mtr facing Right bank of river Pukchara in mouza - Jagannath Chak, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the district of South 2
MR to Sundarban Embankment from Ch 45.300 kM to Ch 45.625 kM for a length of 325.00 mtr facing left bank of river Sutarbag in mouza - Dk. Joykrishnapur, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the district of South
MR to Sundarban Embankment from Ch 14.1 kM to Ch 14.2 for a length of 100.00 mtr facing right bank of river Moni in mouza - Kumarpara, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the district of South 24 Pgs.
Urgent repair of slip/slope failure over Left Ex Zamindary Embankment of Debi Khal for a length of 85 Meter at C/S side near House of Nanda Barman, Mouza-Dubrajpur, GP-11 No Mohar, in Block PS-Sabang Dist. Paschim Medinipur.
IR to damage Sundarban Embankment affected during cyclone YAAS on 26.05.21 from ch 24.00 km Km. to 24.400 Km for a length of 400 Meters from Khaddarer Ghat to Bara Vanga along river Chaltabonia in Mouza -Gangapur Under Patharpratima I Sub-Divis