Loading…
Loading…
8,513 results • Best match
M/R to severely damaged Hooghly Left Embankment near Nila at Mouza- Nila ,Block - Diamond Harbour II , Dist.-South 24 Parganas under Diamond Harbour(I) Sub-division of Canals Division. (Reach-I). (2nd Tender to the 1st Tender No. WBIW/EE-II/CD/e-N
Emergent Closing the cut at 5.340 KM (old Fare Ghat) and repairing the rain cuts in countryside slope in between 5.340 Km to 5.390 Km of Ajay right embankment in G.P- Bhedia, Block- Aushgram II, P.S- Aushgram under Bhedia Irrigation Section No. I of
M/R to bank cuts and earth slips and ghoges of Ajoy right embankment in between 5.100km to 5.500km including approach at 5.200km near village Keshermath in Block-Ausgram-II PS-Ausgram under Bhedia (I) Section No. I of Guskara (I) Sub-Division of Da
I R to Damaged Sundarban Embankment affected during Cyclone YAAS on 26.05.2021 For a length of 650 .00 m from Ch. 7.710 km to Ch. 8.360 km at mouza Baliara W along Bay of Bengal under Mousuni I Sub - Division of Kakdwip I Division.
Restoration of 2 (two) number slip/slope failures over Right Embankment of Amrakhali Khal for a length of 30 Meter at river side near Amit Ghorai house and a length of 45 Meter at river side near Kushadhwaj Ghorai house at Mouza-Murarichak in Block
Emergent restoration of Sundarban Embankment damaged due to Full Moon Kotal from 08.07.2025 to 13.07.2025 along with incessant rainfall facing at R B of river Bidyadhari for a length 60.00 m along with a ghoge near H O Sona Mondal in G.P Nazat I
Maintenance repair and Breach closing to Gaburbasra embankment for the length of 350 M in between ch.1350.00 M to ch.1450.00 M and CH.3950 M to CH.4200M along the right bank of river Gaburbasra in P.S JaigaonBlock Kalchini and Dist - Alipurduar
F.P.M work and sealing of Sluices at Damodar Right embankment from Khajjuti to chandrapur during the monsoon of 2024 at G.P -Khanla, Bainan and Khalor in Block-Bagnan-I ,II and Amta, P.S-Bagnan and Amta ,Dist-Howrah under LDC Sub-Division NO-I
Emergent maintenance and repairing to Left embankment of Hooghly river for the length of 125.0 m near Garments Park at Mouza- Kalipur ,P.S-Budge Budge in block -Budge Budge I, of Ward no-6 under Budge Budge Municipality in Dist-South 24 Pargana under
Restoration of settle down portion of Left embankment crest of river Rupnarayan for a length of 60.0 m at Ateswari causing heavy discharge passing during 16/09/2024 to 18/09/2024 and full moon high tide water flow in GP-Baneswar-II, Block-Shyampur
M/R to bank cuts and earthslips and repairing of approach in between 6.60km and 7.00 km near village Santla of Ajoy Right Embankment in Block and Ps- Ausgram-II under Bhedia I Section No. II of Guskara I Sub-Division under Damodar Headworks Divis
Repair of slip slope failure over Left Ex-Zamindary Embankment of Deuli River for a length of 90.00 Metre at river side country side in between Ganga kone and Nedhua kone at Mouza Nedhua GP06 No Chaulkuri in Block PS-Sabang and Dist.-Paschim Medin
M/R to severely damaged Sundarban Embankment for a length of 250 metre from Ch. 3.62 km. to Ch. 3.86 Km. facing Bay of Bengal at mouza Patibunia under Mousuni (I) Sub - Division of Kakdwip (I) Division within block-Namkhana, Dist- South 24 Parganas
Procurement of flood fighting material and regular maintenance of Ajoy Ex-Zamindary left embankment from Ch. 0.00 Km to Ch. 7.62 Km at downstream of Gheropara and from ch 0.00 km to 17.95 km at upstream of Gheropara during monsoon period 2025 under B
Urgent Repair of slip/slope failure over Left Ex Zamindary Embankment of River Deuli for a length of 35 Meter at country side in between Rampura Sluice and Ganga Kone at Mouza Rampura GP 5 No Sarta Block P.S. Sabang and Dist Paschim Medinipur
M/R to damaged block pitching of the existing embankment for a length of 220m in between Jetty no-4 to Jetty no-3, LoT-8 facing left bank of river Muriganga at Mouza- Kalinagar, Block- Kakdwip, Dist. South 24 Parganas- under Kakdwip Irrigation Divis
Emergent protection and restoration work by slip repair in between Ch.36.15 Km to Ch.36.25 km for a length of 70.00 M of M.C. Embankment (R/B of River Palaspai ) to reduce vulnerability of people due to flood during monsoon-2021 at Mouza-Palaspai,
Raising Strengthening and Improvement of Sundarban embankment by 20 cm thick dry brick pitching for a length of 300 m. at Mouza- Charalkhali, G.P Sahebkhali from Ch. 48.20 km to Ch. 48.50 km on the right bank of river Kalindi in Block and P.S. Hinga
Repair and maintenance of damaged right side canal embankment of Disty. No.11(L) at 2.65km of MMC under Teesta Canal Sub Division No-II under TCD-I in P.S. Chopra, Dist -Uttar Dinajpur ensuing Kharif,Rabi and Boro Irrigation in the year 2025-26.
Urgent repair of slip slope failure occurred due to incessant rainfall from 16.08.2024 to 20.08.2024 over Left Ex-Zamindary Embankment of Jarura Khal for a length of 20 Meter at River side near Sankar Maitys Land for a length of 20 Meter at Sabang
M/R to rain cuts and earth slips in between 10.80km to 11.50km of Ajoy right embankment including repairing bank cuts and approach near 11.00 km of village Kathalbagan in Block and PS-Mongalkote under Bhedia (I) Section No II of Guskara (I) Sub-Divis
M/R to damaged sundarban embankment from Ch. 17.000 Km to Ch. 17.060 Km and 800 mtr Ch. 18.000 km to Ch. 18. 800 Km for a length of 860.00 m. at Mouza - Bankimnagar facing river Muriganga under Sagar Irrigation Sub Division of Kakdwip Irrigatio
Emergency repairs to damaged Sundarban Embankment inbetween ch1.510 km and 1.910 km and Ch.5.30 km to 5.660 , for a length of 760.00 M along Left Bank of river Hooghly during high tide with easterly windeffect of YAAS on dt. 26.05.2021 at mouza Ghor
Removal of bed silt from Ch. 0.00 to Ch. 97.00 of Dy- 19L/TSMC(S) and strengthening of embankment from Ch. 200.00 to 210.00 with clearing of jungle from Ch. 0.00 to Ch. 97.00 under Kangsabati Canals Sub-Division No. XXI under Kangsabati Canals Divisi
Urgent repair of 2 (Two) Nos. slip/slope failure over Left Ex-Zamindary Embankment of Amrakhali Khal at River side near house of Aditya Maity for a length of 14m and near house of Ananta pal for a length of 15m at Block Sabang
Flood fighting work to right embankment of river Darakeswar and Sankori at Jhumi inbetween Ch.0.00 Km. and 10.97 Km. for a length of 10 KM from Digra to Swai Gongoni in Block Goghat I and Ghatal P.S. Goghat and Ghatal District Hoohgly and
Urgent repair of slip slope failure over CC Embankment LB of River Palaspai in between Ch40 Km to Ch 40.10 km See para for length of 75 M occurred due to very heavy rainfall at Mouza Palaspai Block DaspurII PSDaspur and Dist Paschim medinipur
Flood portection and mitigation work for reducing vulnerability of the area due to damage of sundarban embankment affected during full moon kotal from 17.04.22 to 19.04.22 from Ch.2.35 Km to Ch.2.55 Km for a length of 200 m at mouza-Narayanpur facing
M/R to Sundarban Embankment from 17.10 Km to 17.25 km for a length of 150.0 mtr facing right bank of river Moni near Muller Mukh in mouza - Kumrapara, Block - Mathurapur II, P.S- Raidighi under Joynagar Irrigation Division in the Dist-24 Pgs (S)
M/R to damaged block pitching of the existing embankment for a length of 205m in between Jetty no-3 and Jetty no-4, LoT-8 facing left bank of river Muriganga at Mouza- Kalinagar, Block- Kakdwip, Dist. South 24 Parganas- under Kakdwip Irrigation
Repairing the damaged portion at 66.70 Km to 68.70 Km and 62.50 Km to 64.00 Km including Embankment works Cutting Kutcha drain and WBM works of the Barakar - Purulia Road under Purulia Sub-Division PWD of Purulia Division PWD during the year 22-23.
Protection work by precast concrete block lining for a length of 500 m from ch. 6.450 km to ch. 6.950 km from the downstream of 6-vent sluice of New Monikhali Khal at the right embankment towards river Hooghly within Maheshtala Municipality in P.S
M/R to severely damaged Sundarban Embankment for a length of 190 metre from Ch. 3.90 km. to Ch. 4.09 Km. facing Bay of Bengal at mouza Patibunia under Mousuni (I) Sub - Division of Kakdwip (I) Division within block-Namkhana, Dist- South 24 Parganas
Restoration of 4 (four) number slip over Right Embankment of River Cossye (TE1H1) for a length of 30 Meter at Country side, 30 Metre at country side, 35 Meter at river side, 25 Metre at river side at Mouza Keshpur, Balibanda, Serpur and Barkhola in
Urgent Protection and repair works of damaged inspection path for a length of 5.000 km (From CH 0.00 Km to Ch 5.00 Km) of D.C Embankment R/B of river Old Cssye due to damage caused by Severe cyclonic Storm YAAS at mouza- -Dussaspur,Damodarpur.
M/R to sundarban embankment damaged due to tidal effect and wave dash for a length of 275 M near house of Niranjan Sahoo to land of Dilip Kandar of facing river Muriganga right bank at Mouza - Kashtala under Sagar Irrigation Sub-Division of Kakdwip
M/R to sundarban embankment damaged due to severe erosion on 06.10.24 for a length of 350 M in between near land of Sujit Mahapatra to near land of Dilip Kander of facing river Muriganga right bank at Mouza -Kashtala under Sagar Irrigation Sub-Divis
Protection work with bamboo porcupine spurs along right bank of river Rasulpur at Uttar Dihimukundapur from Ch.300 m to Ch.1100 m and from Ch.1900 m to Ch.2100 m total length 1000 M along with raising of right side marginal embankment length
M/R to severely damaged of Sundarban Embankment for a length of 300.00 metre from Ch. 3.15 km. to Ch. 3.45 Km. facing confluence point of Chenargang and bay of Bengal at mouza Patibunia under Mousuni (I) Sub - Division of Kakdwip (I) Division with
M/R to damaged brick block pitching in Sundarban Embankment from Ch.6.420 km and Ch. 6.540 Km for a length of 120 m at mouza Lakshmipur, Block-Kakdwip on the left bank of river Hooghly under Kakdwip irrigation Sub- Division of Kakdwip Irrigation
Repair of slip slope failure over Right Ex-Zamindary Embankment of Amrakhali Khal for a length of 45 Meter at River side near House of Atanu Nayek and for a length of 40 Meter at River side near House of Subal Mondal at Mouza- Bishnupur
Protection of embankment by providing PCC saucer drain from 2.150 Km to 2.185 Km (LHS) and 2.340 Km to 2.445 Km (RHS) (Total-140 Mtr length) of Tamna-Hesla-Arsha Road with a link to Sirkabad under Purulia Highway Division in the district of Purulia.
Protection to the Right Bank of River Mahananda at Jadupur for a length 525.00m, Jagannathpur for a length of 200.00m and Chator for a length of 500.00m for a length 1225m under Mahananda Embankment Division Reach-II for a length of 500m at Chator.
I/ R to Damaged Sundarban Embankment affected during Cyclone YAAS on 26/05/2021 for a length of 41.00 M from ch. 8.370 km to ch. 8.411 km. at mouza - Baliara west along Bay of Bengal under Mousuni Irrigation Sub - Division of kakdwip Irrigation D
E/R of Sundarban Embankment damaged due to Purnima kotal from 29.09.23 to 02.10.23 in between 53.25 Km. to 53.37 Km. near Tridibnagar Dhaner Arat at mouza Tridibnagar along the R/b of river Bidya in Block Basanti, P.S. Jharkhali Coastal, South 24 Pg
Emergent protection and restoration work by slip repair in between Ch. 34.80 Km and Ch. 34.90 km for length of 60.00 M of M.C. Embankment (R/B of River Palaspai ) to reduce vulnerability of people due to flood during monsoon-2021 at Mouza-Sitapur
Emergent restoration of Sundarban Embankment by closing 5 Nos ghoges damaged due to New moon Kotal on and from 25.05.2025 to 30.05.2025 in between Ch. 17.80 km and Ch. 17.90 Km for a length of 45 m at mouza-Bhagabatpur facing river Gazir khal
Emergent Restoration of Sundarban Embankment by Constructing Ring Bundh damaged due to Purnima Kotal from 06.05.23 to 09.05.23 from 23.30 Km to 23.55 Km at Mouza Pakhirala near Tiger Lodge along R/B of river Gomor, Block and PS Gosaba, Dist S 24 Pgs
Construction of Sundarban Embankment by brick block pitching at Mouza - Kaikhali and Gopalganj, from Ch. 27.97 k.m to 28.27 k.m. and Ch. 23.55 k.m to 24.15 k.m (for a length of 900 m) along the river - Matla, Block and P.S - Kultali , Dist- South 24
Embankment protection work by Sausage crates with boulder at Ch. 0.60 km of Link Road from B.K. Road to Bhatar-Samanti Road under Bhatar Highway Sub-Division-II of Burdwan North Highway Division in the dist of Purba Bardhaman during the year 2024-25.