Loading…
Loading…
8,498 results • Best match
CONSTRUCTION OF CONCRETE ROAD FROM RASID POND EMBANKMENT TO SK SAIDUL ISLAM HOUSE under APAS fund
Supply of materials for Protection of river embankment sausage work of samsul house to sadar land
CONSTRUCTION OF WALL IN HORISH KANANGO POND EMBANKMENT AT GOTSANDA CFCG 2024 25 UNTIED
PROTECTION OF EARTHEN ROAD-EMBANKMENT WITH BULLAH PILLING AT BOTH SIDE OF CONCREATED EARTHEN ROAD FROM BOLDEGHATA BRIDGE TO HOUSE OF MURARI BAIN AT BOLDEGHATA (ACTIVITY CODE- 74646406)(FUND-15TH FC UNTIED)
Repairing of Damaged embankment of Nazirhat Dighaltary VR , Balarampur VR, Nazirhat Nekhiganj , Trimohini VR, Kismat Dasgram VR, Bamanhat Chowdhuryhat Road, Abutara Bamanhat VR, Okrabari Gobrachhara road, Kharubhaj Khochabari road under PWD Dinhata.
Construction of New Road Embankment Protection Wall (Length - 35.00M) from the house of Anup Dolai to Arun Dolai House under booth no. -104 ,Priority Serial No.- 8, Ward No.-VI, within Contai Municipality under APAS Scheme
1. RE-EXCAVATION OF POND AND DRESSING OF EMBANKMENT OF MIRABERY POND AT WARD NO-04 (PHASE-I) UNDER DUBRAJPUR MUNICIPALITY, BIRBHUM.
River Bank protection work on the right bank of river Fulahar for a length of 60 M at village-Naya Bilaimari, Mouza-Maniknagar, Block-Ratua-I, P.S.-Ratua, Dist.-Malda at Mahananda Embankment Sub-Division No.-III under Mahananda Embankment Division
RE-EXCAVATION OF POND AND DRESSING OF EMBANKMENT OF DARBESH GARBAGE DUMPING GROUND WARD NO-16 UNDER DUBRAJPUR MUNICIPALITY.
Protection and Repair work of road embankment on the damaged portion of Rajabhatkhawa-Jaigaon Road between Ch. 23.00kmp. to 24.00kmp. under Alipurduar Highway Division P.W.(R)Dte. in the district of Alipurduar during the year 2025-26.
Construction of cast road from Khurigachi Middepara junction to Betberia river embankment Via Khurigachi ICDS to river embankment Shripati Das tea shop Via Lakshikant Mandal house to Anup Das house Via Shambhu Mandal house to Asit Das house
Flood Damage Work of Road From-Pucca Road To Central Dooars Rangamati Division
FLOOD DAMAGE REPAIR OF PMGSY ROAD FROM PURBA BOULPARI BASHERTARI TO NH NA
Restoration of flood damage from Jeliakhali Mistry para ferrryghat to Sapan Sardar house
Flood protection and mitigation work of River bank errosion for a length of 185.00 m of Silabati River (Left.Embankment both R/S and C/S) Village- Kalapat for reducing vulnerability of people within Mouza-Manikkundu, Manikkundu G.P.
Flood protection and mitigation work of River bank erosion for a length of 185.00 m of Silabati River (Left. Emb.)near River pump Village-Bankasultanpur for reducing vulnerability of people within Mouza-Manikkundu, Manikkundu G.P. Block - Chandrakona
Ordinary repair, flood damage repair and bridge repair of IBB Road at various stretches from BP. No. 327/2-R to 362/MP of Border Fencing Sub Division, Kaliyaganj, under BFD-II, IBBZ-I, during the year 2023-24 in the District of Uttar and Dakshin ... repair, flood damage repair ...
F.P.M. to the Ex-Zamindari Embankments of river Silaboti under Baghabantapur I , II G.P of Chandrokona-II Block during Monsoon 2025 under K.C. Sub Division No-I of K.C. Division No-I, Amlagora, Paschim Medinipur
F.P.M. to the Ex-Zamindari Embankments of river silabati under Bhagabantapur -I,II GP of Chandrakona - ll Block during Monsoon 2023 under K.C.Sub Division No.-I, Salboni of K.C. Division No.-I Amlagora, Paschim Medinipur.
RE-EXCAVATION OF POND AND DRESSING OF EMBANKMENT OF SATKENDURI HARSHAD PUKUR NEAR THAI PUKUR WARD NO-09 UNDER DUBRAJPUR MUNICIPALITY.
EMERGENCY EXPENDITURE ON FLOOD AFFECTED ROAD REPAIRING AT KAYETERBERI VILLAGE UNDER SITAI-II GP WITHIN SITAI PS
Emergency restoration of flood affected road namely Kamarshala to Sabalsinghapur WB 08 36 under Khanakul I block
Emergency restoration of flood affected road namely Joyramchak more to Kedarpur vimtala WB 08 ADB 194 C
Emergency restoration of flood affected road namely Dakshinpara to Mainan WB 08 145 under Khanakul I block
REPAIRING AND RENOVATION OF FLOOD AFFECTED SEALDAHA ICDS CENTRE (19329011101) UNDER HARIBHANGA GP WITHIN COOCHBEHAR-I BLOCK.
River Training and Protection works at Right Bank Naxal Khola.
Maintenance and repair to bank protection work at Baksidanga embankment from ch.0.00 km to 1.50 km on the right bank of river Jaldhaka in P.S- Maynaguri , Dist- Jalpaiguri.
Implementation of Ipomea Plantation at the Slopes of the Embankments at Identified Places in the District of South 24 Parganas, North 24 Parganas, Purba Medinipur and Paschim Medinipur (over 2,00,000 Sq. Mtr. or 20.00 Ha.) with Two Years Maintenance.
RENOVATION OF PUMP HOUSE AND BANK PROTECTION WORKS, EARTH FILLING IN THE AREA ADJACENT TO THE PUMP HOUSE OF TARALI-I MAJOR RLI SCHEME IN SWARUPNAGAR BLOCK UNDER BARASAT (AGRI-MECH) SUB.DIVISION UNDER BARASAT (A-M) DIVISION
RENOVATION OF PUMP HOUSE AND BANK PROTECTION WORKS, EARTH FILLING IN THE AREA ADJACENT TO THE PUMP HOUSE OF TARALI-II MAJOR RLI SCHEME IN SWARUPNAGAR BLOCK UNDER BARASAT (AGRI-MECH) SUB.DIVISION UNDER BARASAT (A-M) DIVISION
Precommissioning work at intake and WTP site with additional work of Legun,Storage of over flow water with river bank protection rectification work as per requored of existing structure of WTP and Intake of surface based PWSS
Comprehensive Maintenance to IBB Road ID 71 72 73 74 and 75 and 988/4-S to 1027/2-S under Tufanganj Sub Division jurisdiction in West Bengal and Assam during three year 2023-24 2024-25 2025-26 SH Ordinary Repair Bridge Repair and Flood Damage Repair.
Comprehensive maintenance to IBB Road ID 62 from BP No 860/7-S to BP No 925/MP 112.925 Km under Mathabhanga Sub Division jurisdiction in West Bengal during three year 2023-24 2024-25 and 2025-26. SH Ordinary repair Bridge repair Flood Damage reapir and Culvert repair.
Ordinary repair, Flood Damage repair of culverts, Painting of Kurum Bridges etc. at various locations in the AOR of 93 Bn between BP No. 764/2-S to 769/MP along Indo Bangladesh Border in Jalpaiguri District of West Bengal Sector during the year 2025-26. Subwork/Packages: Civil Work
Protection of Bolder Bundh left embankment of river Jainti from Shibmandir to the Check Post Bhutiabasti part no 1001
Flood protection and mitigation work for reducing vulnerability of people by making new embankment for permanent closure at breach point of Left side of Ex-Zamindari Embankment, River Rupnarayan from 0.150 Km to 0.275 Km for a length of 125 m at Band
Flood protection and mitigation work for reducing vulnerability of people by making new embankment for permanent closure at breach point of Left side of Ex Zamindari Embankment River Rupnarayan from 7.38 Km to 7.42 Km for a length of 40 m atJagatpur
Flood protection and mitigation work for reducing vulnerability of people by making new embankment for permanent closure at breach point of Left side of Ex-Zamindari Embankment, River Rupnarayan from 2.700 Km to 2.820 Km for a length of 120 m at Ban
Flood protection and mitigation work for reducing vulnerability of people by making new embankment for permanent closure at breach point of right side of Shaikpur Circuit Embankment River Darakeswar from 0.00 Km to 0.060 Km for a length of 60 m at
Flood Protection and mitigation work due to damages of Sundarban Embankment in- between Ch.3.700Km. to Ch. 4.40 Km at Mouza-Kantamari, facing River- Nabipukur, Block- Kultali and P.S- Kultali
Maintenance and Repair work to the Pazole Flood Control Embankment from Debinagar Sluice to Bishahar under GPMaraikura and Gouri in PS and Block Raiganj and Dist Uttar Dinajpur(2nd Call)
Repair and protection of Pazol Flood Control embankment for a length of 100.0 M at Bariol under Surun I GP in Block and PS Itahar, District-Uttar Dinajpur (2nd Call)
Restoration of left Fulahar embankment at ch 22.200 Km near H/o- Shambhu Ghosh for a length of 100m in block- Harishchandrapur-II, P.S.-Restoration of left Fulahar embankment at ch 22.200 Km near H/o- Shambhu Ghosh for a length of 100m in block- Hari
Flood Protection and mitigation work of River bank by mending slip for a length of 80.00 m at Dhoba Hana of Silabati River (Right Side) Village-Srirampur for reducing vulnerability of people within Mouza-Srirampur, Bandipur-I G.P.
Flood protection and mitigation work of River bank erosion for a length of 200.00 m of Silabati River (Left.Emb.) at Mathurapur for reducing vulnerability of people within Mouza-Mathurapur, Manoharpur-I G.P., Block Chandrakona-I, under K.C.D-I
Flood protection and mitigation work of River bank erosion for a length of 150.00 m of Silabati River (Left.Emb.) near Jora Mandir at Sitarampur for reducing vulnerability of people within Mouza-Sitarampur, Manoharpur-II G.P., Block Chandrakona-l
Flood protection and mitigation work of River bank erosion for a length of 200.00 m of Silabati River (Left.Emb.) at Ekbalpur for reducing vulnerability of people within Mouza-Ekbalpur, Manoharpur-I G.P., Block - Chandrakona-l, under K.C.D - I
Crossing of underground rising main pipe line along embankment of LMBC through congested slum area (Ochiven Pally)
Crossing of underground rising main pipe line along embankment of LMBC through congested slum area Ochiven Pally
UP GRADATION AND MAINTENANCE OF SWM PROJECT IN BRAMHANANDA POND EMBANKMENT AT BEGUNIA CFCG 2024 25 TIED