Loading…
Loading…
8,505 results • Best match
Construction and strengthening of downstream concrete apron/spillway at Rammam Intake alongwith embankment protection work under Rammam Hydel Project, St-II.
STRENGTHENING OF EMBANKMENT FROM FLOOD AND EROSION OF RIVER RAKTI (LEFT BANK) AT PAINAKUMARI JOTE, G.P. SUKNA IN P.S. KURSEONG, G.T.A.
Raising and strengthening of Pond embankment with protection by Tali Piling with Earth work Infront of Esharaf pond at Parulia Madhabpur
Widening of Road Embankment with Paver Block from Bhagat Singh More to AG Church School, under Borough- V, Asansol Municipal Corporation.
Maintenance of existing embankment and Construction of Pucca Driain from Balihati Kabrastan to H/O Kashem Ali Molla at Balihati V
Maintenance of existing embankment and Construction of P.C.C. Pavement from H/O Alauddin Molla to H/O Julfikker at Mothbari XV
Sinking of two nos of Tubewell with Sock pit near Dhananjay Mal house at Bagishpur and Sujpur West embankment at Goalkunda
SUPPLY OF MATERIALS FOR CONSTRUCTION OF EMBANKMENT WITH BOULDER FOR COMMUNITY FROM LAND OF BHAJAN SAHA TO LAND OF BHUBATI SAHA
Construction of Double Soling BP Road from the house of Mrityunjay Maity towards the sluice gate River Embankment at Gobindapur Abad
Repairing of road from Girigheri Pashchim Pally Bishalaxmi Mandir to River Embankment at HARIPUR JL No 21 Under Haripur Gram Panchayat
Supply of different materials for const. of 35 Nos Display Board for boulder pitching embankment under Petla GP Dinhata I PS
construction of concrete road from Baradapur Gourhari Khatua house to west side river embankment under Patharpratima G.P. under Patharpratima Panchyat Samity
Raising and strengthening of Pond embankment with protection by Tali Piling with Earth work of Alauddin Mondal Pond at Aminpur West
SUPPLY OF MATERIALS FOR CONSTRUCTION OF CONSTRUCTION OF EMBANKMENT WITH BOULDER FOR COMMUNITY FROM LAND OF JATIN CH DEY TO LAXMIBARI
Sprinkling of water on embankment , lead or approach road at Ash Pond I and II and at any other area, BKTPP.
Etender cum Reverse Auction for Construction of earth embankment and road with paver block over WBM surface at Bankura Railway siding
Construction of Embankment with Sand/Ash bag beside the view cutter of D type to Protect from storm water during monsoon
Construction of Protection wall and Embankment from Saila Koley Shop to Subrata Das house ,Gangadharpur GP Under Chanditala-I Panchayat Samity
Construction of a concrete road on Kongsaboti River Embankment from house of Sambhu Maity to house of Bablu Bera at Srirampur
Maintenance of existing embankment and Construction of Pucca Driain from H/O Abdulla Molla to H/O Mujiber at Mothbari XVI
Construction of Protection wall and Embankment from Gumordoba Samsan main road to Kali Mandir, Bhagabatipur GP Under Chanditala-I Panchayat Samity
EMBANKMENT PROTECTION FROM HO PARITOSH KHAN TO SHASHTITALA AT R BORHANPUR GP UNDER BISHNUPUR-II PS. (APAS/01/145/128/0006)
Construction of road, railing and Construction of pond embankment at Singhi Bagan Area Booth 38 in ward no 03 Civil Part
POND(TANK) SIDE EMBANKMENT WITH BULLA FOR PROTECTION OF WATER BODY BESIDE SUTIA MASJID AND TAFIKUL MONDAL HOUSE , UNDER SUTIA GP.
Creation with One Year Maintenance of Embankment Plantation at Harapur to Nayabad within EKW Area under NCAP Scheme over 10 Km
Construction of International Standard Hockey Field and Grass Embankment Galleries at Vivekananda Yuba Bharati Krirangan-SITC of VRF Air-Conditioning System.
Construction of concrete drain from the embankment of Natun pukur to Pacca pukur via Kabarsthan at Paschim Manika under Baishnabchak G.P.
Construction of Pedestal beside the river embankment from Jetty Ghat to Old age home at ward no -04 under Taki Municipality
EARTHWORK IN CUTTING AND FILLING IN EMBANKMENT, PROVIDING and LAYING BLANKETING MATERIALS, CONSTRUCTION OF MINOR BRIDGES ETC. BETWEEN NARAYANGARH TO BELDA UPTO BHADRAK END IN CONNECTION WITH THE CONSTRUCTION OF 3RD LINE BETWEEN NARAYANGARH-BHADRAK
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.22 to 19.04.22 at Dakshin Surendraganj AILA inbetween Ch.14.100 km to 14.500 km
Flood protection and mitigation work on right embankment of river New Cossye damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 for a length of 36 m in Mouza Dakshin Katal, Block Panskura
Flood protection and mitigation work on left embankment of river New Cossye damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 for a length of 72 m in Mouza Ranihati within Panskura Municipality
Emergent flood protection and mitigation work on Rup Right Schedule D embankment due to heavy to very heavy rainfall on 12.09.2022 for a length of 32 m at Bar Amritberia, Block Mahisadal under East Midnapore Division
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 50 mtr. at Mouza- Veutia, G.P. - Srirampur , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under Ldid
Emergent Closing of Breach to Left embankment of Tuker Khal near Piarapur spot 7 in connection with Flood Protection and mitigation work and reducing vulnerability of people within Harali U.N.Pur G.P. under Block and P.S. - Udaynarayanpur
Urgent flood protection and mitigation work for reducing vulnerability of people by repairing slip at Ch.27.240 on Left Embankment of River New Cossye TE3H2 at Mouza Mamudabad in Block Debra, P.S Debra, Dist,Paschim Medinipur
Emergent flood protection and mitigation work on left embankment of Buxi Khal damaged due to rainfall and flood discharge on 21.08.2022 for a length of 28 m at Mouza Paramhansapur, Block Panskura under East Midnapore Division
Flood protection and mitigation work on Brindabanchak ExZamindary embankment of river Durbachatty damaged due to heavy to very heavy rainfall from 28.07.2021 to 30.07.2021 near house of Narendra Nath Gorai for a length of 60 m
Urgent flood protection and mitigation work for reducing vulnerability of people by repairing slip at Ch.15.080 Km on Left Embankment of River New Cossye at Mouza Kamalpur in Block Debra, P.S Debra, Dist,Paschim Medinipur
Flood Protection Measure for Damodar Left Embankment from 60.00k.m to 76.00 k.m for the period from June 2025 to October 2025 of Kanla Hd Qtr Section under Jamalpur (I) sub-Division within EE-1 L.D.I Division.
Emergent Closing of Breach to Left embankment of Tuker Khal near Piarapur spot 5 in connection with Flood Protection and mitigation work and reducing vulnerability of people within Harali U.N.Pur G.P. under Block and P.S. - Udaynarayanpur
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 30 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
Emergent flood protection and mitigation work on left embankment of river Chandia damaged due to rainfall and flood discharge on 21.08.2022 for a length of 30 m at Mouza Paramanandapur Block Moyna under East Midnapore Division
Emergent flood protection and mitigation work on right embankment of river Durbachaty damaged due to rainfall and flood discharge on 21.08.2022 for a length of 24 m at Mouza Machhinan Block Kolaghat under East Midnapore Division
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 25 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
Emergent flood protection and mitigation work on left embankment of Patchanda Khal damaged due to rainfall and flood discharge on 21.08.2022 for a length of 55 m at Mouza Harma Block Pingla under East Midnapore Division
Emergent flood protection and mitigation work on left embankment of river Rupnarayan for a length of 260 m in between Kheya Ghat and house of Tarani Samanta in Mouza Mayachar Block Mahishadal under East Midnapore Division
Flood Protection and Mitigation Work for reducing vulnerability of area due to damage of sundarban embankment affected during Full Moon Kotal from 17.04.22 to 19.04.22 damagd brick block pitching inbetween Ch.19.75 km to 19.95 km
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 50 mtr. at Mouza- Joshar, G.P. - Chiladangi , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID
Flood protection and mitigation work for reducing vulnerability of people by breach closing for a length of 30 mtr. at Mouza- Veutia, G.P. - Srirampur , Block - Pursurah, Dist.- Hooghly on Right embankment of Mundeswari River under LDID