Loading…
Loading…
8,507 results • Best match
Urgent restoration of inspection path along Mahishamuri Khal left embankment from Tegachhia Ashramgora to SPIC sluice of length 0.67 Km Lower Rampur left embankment from SPIC sluice to Narit sluice of Length 0.90 Km under L.D.C Sub-Division No.IV o
Surfacing and widening of embankment from 0.00 kmp to 22.85 kmp of Dilli Dewanganj to Bhaluka Road alongwith inspection path of Left bank embankment of river Fulahar in Harishchandrapur-II under Malda Highway Div. in Malda under RIDF-XXVI. 2nd Call.
Urgent flood mitigation work to reduce vulnerability of people by closing breach (37 m) on Deuli Right Ex-Zamindary Embankment of Right Embankment of Deuli Khal near Fishery house occured due to overtopping of high discharge from Kaliaghai and Deuli
Procurement of flood fighting materials for Kuia Ex-Zamindary left embankment from Pantha Nivas to Taltala (1.80 km) and right embankment from Lahodda to Khanpur Minibarrage (10.40 km) of Kuia River during monsoon period of the year 2026 in block-
Urgent Repair of 03 (Three) Nos. Ghoge along with strengthening of Embankment over Left Right Ex-Zamindary Embankment of Sundarpur Khal for a length of 110.00 Metre near Jele polly, Eral Hume pipe sluice and Sundarpur Sluice at Block-Sabang
Urgent flood mitigation work to reduce vulnerability of people by closing breach (26 m) on Deuli Right Ex-Zamindary Embankment of Right Embankment of Deuli Khal near Farattala sluice occured due to overtopping of high discharge from Kaliaghai and D
Protection to the eroded Right ExZamindary embankment of River Mundeswari at Kamdevchak for a length of 400.00m at Marokhana for length of 600.00mLeft ExZamindary embankment of River Rupnarayan at Pansuli for a length of 300 m at different places fo
Urgent flood mitigation work to reduce vulnerability of people by closing breach (100 m) on Deuli Right Ex-Zamindary Embankment of Right Embankment of Deuli Khal near Mini Pump occured due to overtopping of high discharge from Kaliaghai and Deuli o
Restoration of Slip 50.00 M along with repairing of damaged Embankment on Left Ex Zamindary Embankment of Shilabati River from house of Joydeb Pramanik to Rajendra Sasmal at Mouza Shila Rajnagar in G.P Ajobnagar II, Block Ghatal, P.S Ghatal and D
F.P.M. work at Damodar left embankment from Bansberia lock gate to S.E Rail bridge length 2.50 Km, Damodar right embankment from Kulitapara lock gate to S.E Rail bridge length 2.80 Km for a total length of 5.50 km including sealing
M/R to left embankment of River Ajay At Mauza-Ganful,Noapara, Bhandergoria and Bakalsa, Teora,Billeswar-Rusui and Chorki including watching and Guarding of Embankment for four months under Amgoria (I) Section under Salarr (I) Sub-Division within Mayu
Raising of Sundarban Embankment near Tapachar Sluice intake out fall for a length of 230 metre Jungle cutting of 300m length for better inspection of embankment along the right bank of river Ichamati and Silt clearance for better drainage of Tapar
F.P.M. work at Hooghly right embankment from Gadiara jetty to Tetikhola (length 3.00 Km) and Rupnarayan left embankment from Gadiara bus stand to Shibpur and vicinity ( length 1.50 Km) for a total length of 4.50 km in G.P- Baneswarpur-I
repairing of 130.00 meter length of slip over right ex-zamindary embankment of Deuli river repairing of Ghoge over left ex-zamindary embankment of Kharika khal with earth filled poly bag Mouza-Keshiabheri Parashpur, GP4 No Dashagram Block PS-Sabang
Flood Protective Measures for Damodar Right Embankment from Begho Hana to Sajhmntala for a length of 7.00 K.M and Mundeswari Left Embankment from 00.00 k.m to 6.50 k.m for a length of 6.50 Km under Jamalpur (I) sub-Division of LDID
Emergent restoration of Sundarban Embankment in between ch 19.15 km and ch 19.25 Km for a length of 75 m at Mouza Mrinalnagar, Block Kakdwip on the right embankment of Banstala river near Gundakata Sluice under Kakdwip Irrigation Sub Division
Emergent rain cuts repair and restoration of embankment no-29 (in between ch. 0.00 ch.200.00 in between ch. 330.00 ch.400.00 in between ch. 497.00 ch.544.00 in between ch. 597.00 ch.630.00) over right embankment of river ajay
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 17.04.26 to 18.04.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 29.20km to ch 29.25 km left bank of Chatua river under JID.
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment near Mukti office in between Ch 20.70 km to ch 20.75 km lunder JID.
Emergent restoration to Sundarban Embankment damaged occurred due to full moon kotal on dated 01.06.26 to 02.06.26 for repairing of 1 no ghough with adjacent damaged embankment near 1no sluice in between Ch 51.5 km to Ch 51.60 km under JID.
Emergent restoration to Sundarban Embankment damaged occurred due to Full Moon Kotal from 02.05.26 to 05.05.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 15.70 km to ch 15.75 km left bank of Thakuran under JID
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment in between Ch 18.50 km to ch 18.55 km left bank of Thakuran river, JID.
Emergent restoration to Sundarban Embankment damaged occurred due to Full Moon Kotal from 02.05.26 to 05.05.26 for repairing of 1 no ghough near keoratala H.P sluice with adjacent damaged embankment in between Ch 30.25 km to Ch 30.30 km under JID
Emergent restoration to Sundarban Embankment damaged occurred due to New Moon Kotal from 16.05.26 to 19.05.26 for repairing of 1 no ghough with adjacent damaged embankment near Hemantakumari sluice in between Ch 20.15 km to ch 20.20 km under JID
Emergent restoration of Sundarban Embankment damaged due to New Moon Kotal on and from 11.08.26 to 15.08.2026 for a length of 200.00 m in between ch 10.00 km to 10.20 Km of Banstala river right embankment at Mouza Taktipur, Block Kakdwip
Decorative work at embankment of pond (West Side), in Ward No 4 within Gayeshpur Municipality (PART-B).
Repair and Strengthening of Chakvrigu Mayamari Embankment (R/B of river Atrai) for a length of 21m
Flood Precautionery Measures (F.P.M.) to Lower Rampur Khal both embankment from Kamrgaria P.M.G.S.Y. Bridge to Purba Khalna
Emergency Protection work of Embankment due to heavy rain at Link Road at Sector - V, under NDITA.
Beautification by Paver Block at Embankment of Pond (West Side) in Ward No 4 within Gayeshpur Municipality.
Construction of B.P Road from the house of Swapan Purakait to Birat Halders house near river embankment
Durgapur Patnoliaghat Road from 6.50 km to 9.70 km urgent repairing of damaged embankment and allied works
Construction of B. P. Road from Baliara Paschim to house of Sk. Saiyed towards Muriganga river embankment
Construction of Harishchandrapur Deer Park Pond South side embankment beautification with stair at H.C.Pur-II Dev. Block
Bullah piling to prevent soil erosion of earthen road embankment beside pond of Jasahar at Nazirpur sansad
Annual Maintenance of Existing landscaping along Adi Ganga embankment (260.00 mtr.) (Alipore Museum side), in Alipore Kolkata.
Making Embankment along the Edge of 2 Nos Water Body of Silicon Valley in New Town, Kolkata
Annual Maintenance of Existing landscaping along Adi Ganga embankment (260.00 mtr.) (Alipore Museum side), in Alipore Kolkata.
Construction of Harishchandrapur Deer Park Pond East side embankment beautification with stair at H.C.Pur-II Dev. Block
Flood Precautionery Measures (F.P.M.) to Damodar right embankment from Tajpur Kheya Ghat to Mohishamuri Bans Bagan Sluice
EMBANKMENT STRENGTHENING OF WATERBODY NEAR SAFUIPARA CANAL IN SOLAK PALLY IN WARD NO.- 104, UNDER BOROUGH-XI
Construction of Concrete road from Krishnanagar Tank par to Hoogly river embankment via Krishnanagar payla gheri masjid
Upkeepment of Flood embankment including noting and supplying information of gauge of river Subarnarekha for year 2023
SUPPLY OF MATERIALS OR BAMBOO PILLINGIN CONNECTION WITH STRENGTHENING OF EMBANKMENT IN DIFFERENT SANSAD UNDER PETLA G.P.
Construction of Bituminous Road over existing damaged jhama khoa road from Damodar Left Embankment to Joutik para
Decorative work at embankment of pond (West Side), in Ward No 4 within Gayeshpur Municipality (PART-A).
Botolbari Rudel Road from 10.00 kmp to 12.00 kmp restoration of damaged shoulder and embankment in stretches
CONSTRUCTION OF DOUBLE SOLING BP ROAD FROM CLUB MORE TO MRIDANGA BHANGA RIVER EMBANKMENT VIA PALASH SSK
Construction of Harishchandrapur Deer Park Pond West side embankment beautification with stair at H.C.Pur-II Dev. Block
Construction of Bagjola Canal embankment road at New Town side near Gouranganagar Bridge in New Town, Kolkata