Loading…
Loading…
1,790 results • Best match
Construction of Shed and laying of IPB/CC Flooring at Divisional Store Dabwali (Sirsa)
Repairing of various staff quarter No. 4 and 14 at Sector 15 II Gurugram ie cement plaster wood work and interior and exterior paint painting glazed tiles wall tiles and all other works contingent thereto
hew 22 FLUSH DNR SHUTTER, CUPBOARD, SHUTTERS, GLAZED WALL TILES, APEX, DISTEMPER, ENAMEL PAINT, PLASTER , BRICK WORK ETC. AND ALL OTHER WORKS CONTINGENT THERETO. CH TO Annual maintenance of staff quarters IN SECTOR 46 FARIDABAD
White wash, distempering, painting, providing fixing of chowkats, flush door shutters and wire guage doorm wall tiles etc and Fiber Shed. In Qtr. No. A-21, Colony No.2 and all other works contingent thereto
Repair and renovation of male General Toilets for Intern Boys Hostel at Ground Floor First Floor Second Floor and Third Floor due to seepage and eliminate the leakages and replacement of drainage pipes wooden flush door and floor tiles in Boys Hostel
HEW 33 A/mtc of officers staff quarter in Sector-15A, Faridabad for the year 2024-25.Repairing of plaster work and providing and laying vitrified floor tiles, water proofing, floor mounted, PCC, flush door shutters paint works, sanitary works, and et
Scope of work will cover repair to damaged plaster of walls and ceiling area along with putty work and whitewash of building, tile tracing work of roof, installation of new floor tiles removing the damaged old tiles and also the required sanitary wor
CA NO. GE AF NO.1/GUR-40/2025-26 PROVISION OF ESD FLOORING ETC. AT STD, CAL LAB, PROVN OF METAL FRAME AROUND OHT , PROVN OF GRILL/COLLAPSIBLE GATE, PROVN OF WALL PANELLING FALSE CEILING AT AFWWA AT 27 ED AT AF STN PALAM UNDER GE AF NO 1 GURGAON
CA No GE(H)-31/2022-23 PROVN OF STONE HARD STANDING 1000 SQM AND COVERED SHED OF SIZE 12M X 13M, 12M X 23M AND 12M X 18M WITH STONE SETT FLOORING IN CERTAIN UNIT IN THE AOR OF AGE B/R II UNDER GE HISAR AT HISAR MIL STN
PEVMENT OF RASTA WITH DRY BOE FLOORING FROM 1. FROM JIND ROAD (F/O RAJBIR S/O BHAAJ SINGH) TO F/O RAMBHAJ S/O RANDHIR (2) BARSANA ROAD (F/O SANTRAM S/O BHARAT SINGH) TO F/O SATISH S/O RANDHIR AT VILLAGE BOHATWALA BLOCK JIND SCHEME HGVY.
White wash, distempering, painting, Providing fixing of chowkats, flush door shutters and wire gauge shutters, wall tiles, fiber shed etc. in Qtr. No.3 G.F. in Colony No.1, Rohtak and all other works contingent thereto
VILLAGE-URLANA KALAN FLOORING IN SHRI KRISHAN GAUSHALA Compli. Of Sikh Community Centre Urlana Khurd
Earth work, RCC work, Brick work, cement plaster, WBM, IPB Flooring, Topping, painting and etc
CONST AND MAITENANCE OF FLOORING AND OUTSIDE ILPB PARKING OF GRAM SACHIVALYA AND COMMUNITY CENTER
Earth work, Cement concrete, RCC work, Brick work, Cement plaster, Flooring, Roofing, Painting etc work
New Mastic on shed columns and repair of mastic flooring at LPG Bottling Plant, Karnal.
Preparation, Brick work, WBM, IPB flooring, topping etc (1st time for Society and Contractor both)
Earth work,Cement conc,Brick work,RCC Work,Steel work,Flooring,Roofing,Painting and etc
Civil work Repairing of Control Room Building flooring and tile tracing at 220 KVSubStation Bhadana
Raising of Nala and Drain Bed , Const. of Cc Paver in Front of Bus Stand and Ayurvedik Dispensary , Const. of Floor Tiles and Painting Works in Old Age Home at Village Khajuri , Block Jagadhri , Distt Yamuna NagarRaising of Nala and Drain Bed at Vi
Construction of Security guard rooms, Pump house, Generator Control Room, Security grill on boundary wall, MS Gate and Parking Area and Glazed wall tiles in staff rooms and shops in New Bus Stand Sewah at District Panipat.
Annual maintenance of HSVP, Administrator residence cum camp Office Sector-27 Gurugram. Repairing of cement plaster,Exterior and interior paint ,vetrified floor and wall tiles ,Repair of Doors and windows , wood work,Glass work ,Electric and plumb
Repairing of staff quarter with distempering, painting, providing and fixing of PVC door Frame, shutters, verified tiles, ceramic glazed wall tiles etc in HSVP Staff Quarter No-I, Sector-14, Rohtak and all other works contingent thereto
AMtc of Staff Quarter in Sector 8 Urban Estate Ambala City Replacement of damage GI pipe Wall Tiles in various staff quarter Sector 8 UE Ambala City complete in all respect and all other works contingent thereto
PEVMENT OF RASTA WITH DRY BOE FLOORING FROM 1. SAFIDON RAOD TO F/O RAMPHAL S/O RANVIR VIA F/O RAJPAL 2. MANDO KHERI RAOD TO F/O AMARJEET S/O BHAGTA 3. LOCHAB ROAD TO F/O RAJBIR 4. KHOKHRI ROAD TO F/O RAJESH AT VILLAGE MANOHARPUR BLOCK JIND SCH
CONST OF PHIRNI FROM H/O NARESH JAAT TO H/O MANISH SAINI (1.50 LAKH), PAINTING WORK AND TILE WORK IN BC CHAUPAL (1.50 LAKH) AT VILLAGE SHABPURA SCHEME VANGY 2022-23
Upgradation of existing channel of 24MLD STP from CCT to newly constructed collecting tank (Tile work, Path way, boundary wall etc.) upgradation to Kesar Nagar IPS and all other works contingent thereto.
Maintenance of Staff Quarter No. 1 at Tubewell No. 9, Sector-31, Gurugram with repairing of cement plaster, tile work, electricity work, wooden work, sanitary work, paint etc. complete in all respect.
Maintenance of Staff Quarter No 3 at Water Works, Sector-31, Gurugram with repairing of Brick work, tile work, putty, door shutter, wooden work finishing paint and all other works contingent thereto.
Working Table, panelling, false ceiling 2x3, aluminium dooe, aluminium window, light, flooring 45x60, flex bds, bin
Preparation, Brick work, WBM, IPB flooring, Topping, etc (1st time for L and C Society only)
Excavation, PCC, RCC frame work, flooring, tile terracing, plastering, joinery, painting and Road and Parking etc
construction of bwall ,toilet and flooring in government ayurvedic dispensary at village-khizarpur ahir block-ganaur
PNP CONSTRUCTION OF SHEED AND FLOORING IN SHAMSHAN GHAT AT VILLAGE BHAUPUR BLOCK ISRANA DISTRICT PANIPAT
Earth work, c.conc.,Brick work,steel work,rcc work,plaster,flooring,roofing,painting etc civil work.
Preparation, Brick work,WBM,IPB flooring, Topping etc (1st time for L and C Society only)
WHITE WASHING, SANITARY ITEMS, PAINTING, FLOORING AND WOOD WORK ETC. AT BOOSTING STATION, SECTOR-27and28, HISAR
Const of B/Wall, IPB Flooring, Shed in Kishanpura Samshan Ghat in Village Nizampur Block Panipat
A/mtc of Staff Quarter in Sec-8, Fbd. Repairing of plaster work, flush door shutter, virtrified floor tiles, CPVC pipe, painting works and all other works in staff quarter house no. 2494 GF and 2497 FF in Sector-8, Fbd and all other works contingent
Annual Maintenance of HSVP Staff Quarters in Sector-46, Gurugram. Providing and laying of ceramic glazed wall tiles, brick work, Plaster, Finishing and Painting work, Sanitary works and various misc. works in Staff Quarter Sector-46, Gurugram and all
JAPTEWALA - CONST. OF IPB FLOORING AND TOILET IN PANCHAYAT GHAR AT VILLAGE JAPTEWALA BLOCK TOHANA DISTT. FATEHABAD
Providing and Fixing Tactiles Flooring and Braille Symbols in Judicial Court Complex at Tohana in Fatehabad Distt
PNP Construction of Varanda and IPB Flooring in Shamshan Ghat at Village Seenkh Block Israna District Panipat
PNP CONSTRUCTION OF SHED AND FLOORING IN SAMSHAN GHAT AT VILLAGE JONDHAN KALAN BLOCK ISRANA DISTRICT PANIPAT
MUSEPUR INDERGARH PS PLASTERING,VITRIFIED FLOORING,GLAZED TILE,TILE TERRACING,SAINITARY WORK ETC. Const of New Toilet
BRICK WORK,CONRETE WORK,WHITE Washing ,Water Proofing, False Ceiling, painting ,flooring, Door window ,paver block, Grill.
R/COST OF B/WALL PHOOLYAN and KASHRAN SHAMSHAN AND IPB FLOORING AT VILLAGE SISANA-1 (VANGY)
Providing and Fixing Tactiles Flooring and Braille Symbols in Judicial Court Complex at Ratia in Fatehabad Distt
Estimate for the work Completion of Bhasu Dham Flooring Work in ward no 14 in MC Sampla
Supply and fixing of interlocking Mat 30mm and vinyl flooring 4.5mm for Badminton in Stadium Nakhrola Village