Loading…
Loading…
3,191 results • Best match
Work includes new toilet near verandah of High School block and ramp.Estimate includes DR foundation, RR basement, solid block masonry, RCC roofing, ceramic floor and wall tiles,vitrified tile primer painting fittings RCC septictank waste pit etc
The provisions included in this estimate are dismantling WC and tiles, providing floor and wall tiles, providing new WC pan (European type), fixing health faucet, towel rod, soap dish , FRP door, PVC septic tank, soak pit etc
Work includes new toilet near verandah of High School block and ramp.Estimate includes DR foundation, RR basement, solid block masonry, RCC roofing, ceramic floor and wall tiles,vitrified tile primer painting fittings RCC septictank waste pit etc
Work includes new toilet near verandah of High School block and ramp.Estimate includes DR foundation, RR basement, solid block masonry, RCC roofing, ceramic floor and wall tiles,vitrified tile primer painting fittings RCC septictank waste pit etc
Work includes new toilet near verandah of High School block and ramp.Estimate includes DR foundation, RR basement, solid block masonry, RCC roofing, ceramic floor and wall tiles,vitrified tile primer painting fittings RCC septictank waste pit etc
Work includes new toilet near verandah of High School block and ramp.Estimate includes DR foundation, RR basement, solid block masonry, RCC roofing, ceramic floor and wall tiles,vitrified tile primer painting fittings RCC septictank waste pit etc
AS PER BOQ AND TENDER DOCUMENT
plastering truss work painting
refer tender documents
Refer tender docs
items included in the estimate are Repairs to plaster fixing of sanitary fixtures fixing of pipe and pipe fittings door fittings cleaning of watertanks, Desludging the existing septic tank engaging labour acid washing the flooring ceramic flooring wa
The proposed estimate includes works suchas filling of pot holes using 36mm, levelling undulations in road using 12mm metal, 20mm thickclose graded BT patch work and Tile work in water logging areas.
The proposed estimate includes works such as filling up potholes using 36mm, leveling undulations in the road using 12mm metal,, and 20mm thick Closed graded patch work. Tile work, PCC , M15 etc
This estimate includes dismantling damaged tile work and providing new tiles providing shelves with ferroslab its painting providing aluminium shutter for ferroslab shelves, repairing and installing sanitary fittings, wall painting work etc
Painting and Flooring all class rooms in GF and FF and Ground floor Toilet and Varandah,
Re-tender-DEPOSIT-S.N.G.S COLLEGE PATTAMBI FLOORING WORK OF GENERAL AND PG BLOCK-General Civil Work
Annual Plan-THOLICODU GP -2023-24 - FLOORING IN LP SCHOOL CLASSROOMPro.No.138/24-General Civil Work
Demolishing, PCC, Flooring works, false ceiling, electrification including providing AC,LCD projector,UPS , providing chairs etc
DEPOSIT-Govt.Poly Technic College Kannur- Heat Engine Lab - -Flooring and other repair works -General Civil Work
Extension works of No.2 transformer repairing workshop with truss work, roofing, Flooring and drainage construction.
Dismantling doors and windows Plastering Painting Tiling Providing PVC and wooden doors Dismantling asbestos sheet Providing polypropylene Sheet Dept supplied structural steel work Sanitary and water supply works etc.
dismantling existing false ceiling works and replacing with calcium silicate ceiling plumbing works inside and outside wall painting tiling on walls for dining area, providing frp door for toilet
This estimate includes frame work for raising auditorium floor in GI hollow tubes, and which is covered with chequered ply wood at top and sides.
Compound wall construction and other building works
Building
The estimate includes provision for construction of drain for 60m with cover slabs and interlock tile work for 75m. The items included in the estimate are WMM, M40 interlock tiles, M20 concrete, etc.
Estimate is included with the works like surface dressing Jungle clearance cleaning grass ,Repairing of damaged Plaster Tile work Plumbing Labours for Cleaning plumnbing work Septic tank cleaning in Mini civil station Anchal
The provisions included are dismantling tile repairs to plaster dismantling block works in many areas repairs of door and windows repairs of sanitary lines tile work and painting drain cleaning aluminum windows etc
Provisions for dissabled friendly toilet with ramp in Govt. Poly Technic college pala is included in the estimate.Items such as earth work excavation ,PCC,concrete work, brick work, plastering,tile work,painting etc
The provisions in the estimate are earth work excavation , DR masonry ,R.R masonry ,structural steel work with GI profile sheet ,dismantling tile work, waterproofing ,ceramic tile, epoxy grouting, sanitary works, plastering, painting etc
Painting works and leak rectification works to toilets and water proofing works and The tile work etc. plastering works ,. The damaged toilet doors are to be replaced with new PVC doors. sanitary fittin
Dismantling Tile Work, Earth work excavation, Random Rubble, centering shuttering,PCC,RCC, Steel, Solid Block work, 12mm Plastering, filling available excavated earth,PCC,Vitified floor tile, Stainless steel handrail, Plumbing work, Water proofing
The items included in the estimate are tack coat, Filling up pot holes, BM patch, BC, BC plastic, road markings, studs, safety boards, side concreting for road, RCC drain work and tile work
The provisions included in the estimate are cleaning, demolishing cement concrete, plumbing work, tile work, aluminium work, water tank cleaning etc. The period of second half RC work for the year 2025-26
Clearing the site ,earth work excavation , PCC 1 4 8,RCC 1 1.5 3 for concrete work ,solid block masonry ,,Wood work,plastering, painting ,tiling,septic tank ,water tank etc
The main items are included in estimate are racks, gate, Toilet tiling, toilet sanitary fittings,toilet doors , aluminium partitons in Road section, reparing, ( plumbing line and civil structure ) painting etc.
Earth work excavation Solid block masonry Truss work Ceiling Plastering Painting Tiling Paving tiles Hand rail Aluminium windows Sheet roofing Plumbing Works Electrical works in Ground floor and First floor
This work consists of construction of Reinforced cement concrete work of column,beam and slab,steel work,block work,shuttering,Plastering, floor Tiling ,Aluminium fabrication work, painting and Plumbing work
The items included in this estimate are paver block Earth work DR RR RCC PCC Solid block masonry FRP doors floor and wall tiles water proofing plastering painting Al ventilators GI sheet work Mosquito net chain links plumbing etc
The proposal for constructing a Dining Hall cum Kitchen ,items included in estimate areRaft foundation, block work , tiles work ,RCC roof, GI Sheet ,sanitory fittings,paintings ,Electrical works etc
GENERAL-RHS Quarters , Melaranoor , Tvpm-Maintenance of Manholes , sewage lines , flooring and allied works-General Civil Work
Construction of humidification trenches,RCC Flooring for the entire area with dewatering finish,including all related works
GENERAL-Providing roofing , side protection and flooring to open jim at AMMRS ,Naloornad-Work-General Civil work
Repair to damaged masonry, joinery, roofing, dismantling works, flooring, drainage and water supply, SITC of Lift etc