Loading…
Loading…
1,062 results • Best match
PROCUREMENT OF ALLOY CI PIPE FITTINGS FOR ASH HANDLING SYSTEM.
SUPPLY OF HP SEAL WATER PUMP FOR ASH HANDLING SYSTEM.
PROCUREMENT OF SPARES FOR EQUALISING VALVES FOR ASH HANDLING PLANT
PROCUREMENT OF ASH EXTRACTION VALVE SPARES FOR ASH HANDLING SYSTEM
PROCUREMENT OF ASH EXTRACTION VALVE SPARES FOR ASH HANDLING SYSTEM
Dr. MVR RTPP-M12-CAM-Stage1-Procurement of inclined bottom ash feed gate assembly -reg
Supply of Spares for L and T Mmake single roll clinker grinder of Bottom ash
PROCUREMENT OF SEAL KITS FOR NUCON MAKE POWER CYLINDERS FOR BOTTOM ASH HOPPER FEED GATE
PROCUREMENT OF SEAL KITS FOR NUCON MAKE POWER CYLINDERS FOR BOTTOM ASH HOPPER FEED GATE
PROCUREMENT OF 300MM NEOPRENE RUBBER GASKETS FOR ASH DISPOSAL LINES OF STAGE III
Procurement of 300MM Neoprene Rubber Gaskets for Ash Disposal Lines of Stage-III
SUPPLY OF MS ORDINARY SLEEVE FOR 400MM CI PIPE OF ASH DISPOSAL LINES.
Labour charges for major welding works of Bottom ash hoppers clinker grinder bodys feed gate bodys bottom ash conveying pipe lines of 200NB size from Bottom ash hoppers to ash pump house and Refilling of material for clinker grinder and gear box shafts of Unit-I and II as and when required for the year 2024-2025.
Supply of spares for material handling valves and Rotary segregating valves in dry fly ash evacuation system.
Carrying out the Lifting and Transportation of ash, ash slurry etc collected in the Fly Ash System
PROCUREMENT OF NRV ASSEMBLIES FOR DRY FLY ASH HANDLLING SYSTEM OF UNITS 3 and 4/STAGE-II
PROCUREMENT OF NRV ASSEMBLIES FOR DRY FLY ASH HANDLLING SYSTEM OF UNITS 3 and 4/STAGE-II
Dr. NTTPS - Construction of fly ash silo of 450cum capacity for stage-I at Dr. NTTPS, Ibrahimpatnam
SUPPY OF 200NB,250NB AND 300NB SLEEVE COUPLINGS FOR THE FLY ASH SYSTEM OF AHP/STAGE-I
SUPPY OF 200NB,250NB AND 300NB SLEEVE COUPLINGS FOR THE FLY ASH SYSTEM OF AHP/STAGE-I
PROCUREMENT OF FLOWMORE ASH SLURRY SEAL WATER AND FLY ASH HP ANDFLUSHING WATER PUMPS FOR NTPC KUDGI
procurement of spares for GA-110 Atlas copco compressor of dry fly ash system of stg-I
Procurement of pulse valves and diaphragms for pulse valves of dry fly ash system of stg-II
PROCUREMENT OF ALLOY CI BENDS OF 125NB SIZE FOR UNIT-1 AND 2 DRY FLY ASH SYSTEM.
SUPPY OF 25ONB DOUBLE DISC VALVES AND SPARES FOR THE FLY ASH SYSTEM OF AHP /STAGE-I
SUPPLY OF DUST FILTER BAGS (ALONG WITH SAMPLES) FOR THE FLY ASH SYSTEM OF AHP/STAGE-I
Dr. MVR RTPP-M12-CAM-Stage-2-Spares for equilising valves in dry fly ash system-reg
PROCUREMENT OF ALLOY CI BENDS OF 125NB SIZE FOR UNIT-1 AND 2 DRY FLY ASH SYSTEM.
air filters and lubricators installed in Ash Handling System atTelangana STPP Station.
SUPPLY OF 200NB 22.5 DEGREE AND Y-SECTION BENDS FOR BOTTOM ASH AND DRY ASH SYSTEM
PROCUREMENT OF SPARES FOR L&T MAKE SINGLE ROLL CLINKER GRINDER OF BOTTOM ASH EQUIPMENT-Reg
PROCUREMENT OF 65MM AND 100MM CI GATE VALVES FOR ASH PUMP HOUSE/ESPS/BOTTOM ASH HOPPERS
PROCUREMENT OF 65MM AND 100MM CI GATE VALVES FOR ASH PUMP HOUSE/ESPS/BOTTOM ASH HOPPERS
PROCUREMENT OF SPARES FOR L&T MAKE SINGLE ROLL CLINKER GRINDER OF BOTTOM ASH EQUIPMENT-Reg
procurement of MS sleeve coupling assembly sets for ash disposal lines of stg-I
Procurement of Gate Valves for Ash disposal pumps, seal water pumps and Silo System
PROCUREMENT OF 300MM & 200MM KNIFE EDGE GATE VALVES FOR BAH AND ASH DISPOSAL LINES
PROCUREMENT OF 300MM & 200MM KNIFE EDGE GATE VALVES FOR BAH AND ASH DISPOSAL LINES
PROCUREMENT OF 300MM & 200MM KNIFE EDGE GATE VALVES FOR BAH AND ASH DISPOSAL LINES
Procurement of spares for Schneider make PLC in Ash Handling PlantSimhadri
PROCUREMENT OF VARIOUS TYPES OF V-BELTS FOR ASH HANDLING SYSTEM
Procurement of GLAND ROPES FOR ASH HANDLING SYSTEM OF STAGE-III
Procurement of GLAND ROPES FOR ASH HANDLING SYSTEM OF STAGE-III
PROCUREMENT OF ASH EXTRACTION VALVE ASSEMBLY FOR WET ASH HANDLING SYSTEM
PROCUREMENT OF FILTRATION MESH FOR HYDROBIN FOR WET ASH HANDLING SYSTEM
PROCUREMENT OF MONO BLOCK PUMPS 7.5HP/5.5KW FOR ASH HANDLING SYSTEM
Procurement of Butterfly Valves for Ash Handling System of Stage-IV
Procurement of Butterfly valves for wet ash handling system/Stage-IV
Procurement of Vacuum Pumps Heads for Dry Ash Handling Plant-Reg.
PROCUREMNET OF SPARES FOR BRANCH ISOLATION VALVES FOR ASH HANDLING SYSTEM