Loading…
Loading…
7,540 results • Best match
Fabrication work of expansion joints Distance piece Reducer of different size Flushing apparatus of ESP bottom ash system of 3X210 MW ATPS Anpara.
Hiring of excavator, Vibro-compactor and other needed T and P to maketemporary approaches in both Bottom Ash and HCSD lagoons at GwSTPP
Work for Pavement for approach road and storage area at Switchyard UsingFly ash and Bottom ash in place of sand at NTPC Mouda
Supply, Erection, Commissioning, Testing and Comprehensive AMC of 100 MTRoad Weigh Bridge for Pond Ash Weighment at NTPC Barauni
Filling of pond ash from ash dykes at PTPP, Parichha to abandoned quarry mines near Bijauli Industrial area, Jhansi.
SUPPLY OF CASTABLE REFRACTORY FOR Unit 7and 8 OF BOILER AND ASH HANDLING AREA AT SSCTPP SURATGARH
Procurement of Knife gate valves for Ash slurry pumps installed at Ash Handling plant of NTPC Solapur
Procurement of non-metallic, asbestos free round gland packing rope andgasket for ash handling system NTPC VINDHYACHAL
M CPG1 695 PROCUREMENT OF COUPLING ASSEMBLIES FOR ASH HANDLING PLANT FORNTPC BONGAIGAON AND NTPC TALCHER STPP.
PROCUREMENT OF SCRAPPER CONVEYOR CHAIN, D-Link FOR ST-1 ASH HANDLING SYSTEM OF NTPC-KORBA (Q3)
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Carrying out the Operation (including PLC operation), Mechanical Maintenance, Preventive maintenance, emergency and break down maintenance, Electrical and C&I Works & House Keeping of complete Ash Handling System of SDSTPS/Stage-2 including T&P and Consumables for a period from 01.11.2023 to 31.03.2024 or from the date of actual commencement of work to 31.03.2024
Routine/Preventive/Breakdown maintenance of control instrumentation field equipments of Dry Fly Ash Extraction System installed in Unit 4 AND 5, 2x500 MW Anpara BTPS.
Construction of 02 Nos. Isolation stopping 1.0 mtr. thick (Fly ash brick) at depillaring panel 14 of Ghorawari Colliery No-1 under Ghorawari Sub Area
Construction of 09 Nos isolation stotppings (03 Nos. preparatory already com-plete) by Fly Ash bricks at T-4 panel of Tandsi Mine, Kanhan Area.
Removal of dumped earth, Mill rejects, etc. from Railway Track forfacilitating direct loading of Dry Fly Ash from Stage-II Ash Silo Areaat NTPC Kahalgaon
Biennial maintenance contract for 02 nos of Electronic Weigh Bridge installed at Dry Fly Ash Silo of Stage 2 And Stage 3 at NTPC Vindhyachal
PROCUREMENT FOR ASCO MAKE SPARES for FGDAsh Handling System and Boilerat NTPC Khargone 2660MW
Engaging manpower to clear chocked Bottom ash hopper and routine maintenance of SC and CG in Boiler Unit No.8 and 9 STPS,Sarni
M3235040000: 12/10FF-AH: ASH SLURRY DISPOSAL PUMP ASSY, M3235010000: 8/6EE-AH: BOTTOM ASH TRANSFER PUMP ASSY, M5657270000: A-552: CLINKER GRINDER ASSY
As per SOW
As per Tender documents
Providing Data Entry Services for assisting in auction and lifting of pond ash from Ash dyke of DCRTPP, HPGCL, Yamunanagar
M CPG1 718 PROCUREMENT OF SEGREGATING VALVES ASSEMBLY AND THEIR SPARES FOR ASH HANDLING SYSTEM AT NTPC SIPAT
Procurement of Slurry Sump plug gate complete assembly and its spareparts for ash handling system of NTPC KUDGI
Procurement of Valve Seat and Gate for 200 NB AND 250 NB Segregating valve in Ash Handling Plant.
Procurement of Kirloskar Make Compressor Model 2HA2TERT Non RateContract Spares for Ash Handling System Stage 4 NTPC Vindhyachal
KUDGI-Procurement of spare parts of Ash discharge valve (200 NB and 250NB)for dry ash handling system
Procurement of Impingement plate of collector tank and spares of 3 inch equalizing valves in Ash Handling Plant.
Procurement of bag filters and cage for Silo, Vent filter Bufferhoppers of Ash handling system, St2 NTPC Barauni
Procurement of Honeywell Make Diaphragm Seal Pressure Transmitter andlimit switches for Ash Handling System,U-6,NTPC Unchahar
Procurement of Charge pump 6_4 D_AH complete assembly and its spareparts for ash handling system of NTPC KUDGI
Procurement of Valve Seat and Gate for Rotary Segregating valve and Equalizing valve in Ash Handling Plant (AHP).
Biennial job contract for Routine and Breakdown Maintenance of Dry andWet Ash Handling Systems of StageII NTPC Vindhyachal
Procurement of Valve Seat and Gate for 200 NB AND 250 NB Segregating valve in Ash Handling Plant
Procurement of spares for different size of ash intake valves installed in ash handling system of STPS-IV.
Painting of Pipes and Structures in Ash Handling System along with Supply of Painting Materials for NTPC Simhadri
Routine/Preventive/Breakdown maintenance work (Mechanical, Electrical and CandI) of complete ash handling system, 2x500 M.W. DTPS Anpara
Procurement of 200 Nb Ci alloy pipes for ash handling system of 2X250 MW units of STPS, Sarni.
Operation and Maintenance of complete Ash Handling Plant of extension units No.10 and 11 of STPS,Sarni
Procurement of different size of gate valves for ash handling plant of 2X250 MW units of STPS, Sarni
Procurement of Sleeve Coupling for FA Conveying Pipe lines for main siloof Ash Handling System of NTPC Darlipali
Supply of Single Point Auto Greasing system for Clinker Grinder andvacuum pump of Ash Handling system ST II
Procurement of Model: 200X250 Wetting Head Assembly Spares in Ash Handling Plant of CAM Division/Stage-II/BTPS
Procurement of Refrigerant Compressor, Oil heater and Compressor Oil forTAC dryer of ash handling system of NTPC KUDGI
Restoration , Re commissioning and trial operation and Maintenance of Ash Handling Plant and ESP of U 6 DPPS.
KTPS-V&VI Stages-Civil-O&M-II-Ash pond- Engaging of excavator on hire basis for excavation of bottom ash by mechanical means using excavator of 200 capacity (track machine) and depositing the same in the trucks/tractors from V Stage ash pond towards PVK-5 of SCCL for underground stowing for the period of one month during December and January from ash ponds of V Stage.
Clearing of accumulated ash at bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to remote silos (except under the silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 24 to Mar 25)