Loading…
Loading…
7,540 results • Best match
Clearing of accumulated ash at Bottom ash area, ESP area, along and surroundings of the ash conveying pipe line from Buffer hoppers to intermediate silos and along the ash conveying pipe line from intermediate silos to Remote Silos (except under the Silos) of Stage-II and loading it to the tractors and transporting to ash pond for a period of one year (i.e. from April 2023 to March 2024)
Custom Bid for Services - Annual Rate Contract for Operation Maintenance OM of Ash Handling Plant Units 16 4 x 210 MW 2 x 250 MW MTPS including Ash Water Makeup Pumps for U56 Ash Water Pumps Unit14 Ash Seal Water Pumps for AHP of U456 ETPsU13 ETPs.. Similar Category Operation and Maintenance Power House/Power Plant
Annual Maintenance Contract for Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines and transporting the same to the ash pond by trucks or tractors for a period from date of work ... in Ash Handling Plant ...
Annual Maintenance Contract for Clearing of accumulated ash at ESP hoppers area Intermediate silo area Remote Silo area along the ash conveying pipe lines and transporting the same to the ash pond by trucks or tractors for a period from date of work ... in Ash Handling Plant ...
Custom Bid for Services - One 01 no Seven 07 seater Non AC diesel Driven MUV MPV SUV Compact SUV Below 1500 CC or Equivalent battery capacity for kWh for EV Below 55kWh along with a driver for ASH HANDLING PLANT section at RTPS DVC for a period of tw.. Similar Category Monthly Basis Cab & Taxi Hiring Services
Construction of CC road (7.0 m) by widening of existing Bituminous road from Fly ash silo to Gate No. 3 with protection works at SSCTPS, Suratgarh.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Pipelines, Replacement of Fly Ash Conveying Pipeline of OPGC III; As per the SOW
DrNTTPS providing and engaging of 2no poclains on hire basis with engine capacity of 136HP and bucket capacity of 0.91Cum for loading the pond ash in to the vehicles at stage-III ash pond for the period of one month from actual date of commencement of work or from 01-10-2019 to 31-10-2019 for 12hrs per day
Construction/rectification of pedestals at various locations of Ash Disposal pipe line at 1x660 MW Bhusawal Thermal Power Station, Unit-6 Maharashtra
As per SOW
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit-I and Unit-II during the FY 2025-2026
Removal of ash around Coarse Ash Hoppers under ESP Hoppers near ID fans Silos and removal of ash by digging carrying to outside by hand loads using baskets from dry fly ash (i.e. ESP I and II area and canals ID fan canals and area, Compressor House area and canals and Vacuum System area and canals) and disposal of the same from Unit I and Unit II during the FY 2025-2026
Providing Boulder protection work along down stream toe line of pond ash dumped near weigh bridge of Ash Pond, DVC, CTPS.
Providing Data Entry Services for Assisting in Auction and lifting of Pond Ash From Ash Dyke of DCRTPP, HGPCL, Yamuna Nagar.
Procurement of different types of spares for wet ash handling system of stage II and III at GGSSTP Ropar.
Procurement of Spare parts of Branch Isolation valve _200 NB and 250 NB_for ash handling system of NTPC KUDGI
Procurement of 350NB Knife Gate Valve (KGV) for isolation beloweconomizer hopper in stage-1 ash handling system NTPC VINDHYACHAL.
Procurement of Ash Slurry Disposal Motor and Air Compressor Motor forKBUNL ST 2 Main Plant and Ash Handling System
Contract for Routine Overhauling and Breakdown maintenance forequipments of wet and dry ash system in Ash Handling Area FGUTPPUnchahar
Procurement of different types of CI Bends, Couplings and Spun pipes for wet ash handling system at GGSSTP Ropar
Repair of TAC HT Motor 315 kW, 6.6kV, 1490 RPM, Make Marathon of Ash Handling Plant, DCRTPP, HPGCL, YamunaNagar
FABRICATION, ERECTION, ASSEMBLY OF 02 NOS. DRYFLY ASH SILO (CAPACITY1500 MT EACH) FOR ASH HANDLING SYSTEM GADARWARA STPP (2X800MW)
Cleaning the roof tops of various buildings such as power house, ash handling, boiler, Bunker ESP 4 and 5
FABRICATION, ERECTION, ASSEMBLY OF 04 NOS. DRYFLY ASH SILO (CAPACITY1500 MT EACH) FOR ASH HANDLING SYSTEM DARLIPALI STPP (2X800MW)
SUPPLY OF MS BENDS AND PIPES LINED WITH CAST BASALT FOR ASH SLURRY DISPOSAL LINES OF ASH HANDLING SYSTEM
Supply of ACI Flanged bends for APH and DUCT Hoppers in ash handling plant of CAM/Stage-II/BTPS
Construction of 10 Nos. Explosion proof Sectionalisation stoppings (fly ash bricks) including all materials for W5 developed district of Bagdona Seam at Tawa Mine Pathakhera Area WCL
Construction of 16 Nos. Ventilation stoppings (fly ash bricks) including all materials for 11LN (A) depillaring district Lower Workable Seam at Tawa II Mine Pathakhera Area WCL
Water washing the fly ash loaded vehicle by the spray nozzle system in the silo area to avoid the air pollution for the period of 366 days
MTPS II O AHS FAM Water washing the fly ash loaded vehicle by the spray nozzle system in the silo area for the period of 180 days
Water washing the fly ash loaded vehicle by the spray nozzle system in the silo area to avoid the air pollution for the period of 365 days
Construction of 5 Nos explosion proof Isolation Stoppings Fly Ash Bricks including all materials in E4 developed district of Bagdona Seam at Tawa Mine Pathakhera Area WCL
Supply of traditional Fly Ash Bricks for construction of Jawan Barrack at different location under 73 Bn BSF, Kahar para Camp Raninagar II Block PS Raninagar Murshidabad
The work includes CC flooring, PCC, RCC, Fly ash Brick work, Iron profile roof sheets, steel work, water supply, Interior and Exterior painting, CC road work etc.
ANNUAL RATE CONTRACT FOR MAINTENANCE OF LT, HT DC MOTORS OF UNIT 4 AND COMMON SERVICES INCLUDING MOTORS OF DRY FLY ASH SYSTEM, DTPS, DVC, DURGAPUR-713207
Cement, sand, Aggregate, Tor Steel, Binding wire, Bamboo, plasticizer, Fly Ash, Recron, Plastic sheet, Engine Oil, Paint, Thinner, Hessian cloth, Master Emaco, Master protect, ISMB, Mild Steel
Ordinary Portland Cement (OPC) GR-43 as per IS: 269 (Q3), Portland-Pozzolana Cement (fly ash based)for bulk buying as per IS:1489 (Part 1) (Q2)
Work of Operation and maintenance of complete dry fly ash system Dense Phase System of unit 1 to 5 stage I II III of STPS RVUNL Suratgarh
MTPS II O AHS FAM Water washing the fly ash loaded vehicles by the spray nozzle system in the silo area for the period of 180 days
Construction of RCC drains, culverts and WBM road along newly developedrailway siding for ash transportation at NTPC VSTPS,Vindhyanagar
Handling, Transport and Other Mining Services - Percentage quote based - Slabwise Rate contract for ash transportation from NTPC Sipat STPS
Handling, Transport and Other Mining Services - Percentage quote based - Slabwise Rate Contract for Ash Transportation from NTPC Gadarwara Plant
Biennial Contract for Ambient Air Quality Monitoring Liquid Effluent Analysis Ground Surface Water Analysis Bottom Ash Analysis Noise Level Monitoring Analysis of Mercury and Particulate Matter
Repair/Construction of damaged Boundary wall along hindun cut canal with Flyash Brick Masonary in pocket-C, IFC Gazipur.
Supply of pond ash from ash dykes of PTPP Parichha to package 4 and package 5 of Bundelkhand Expressway developed by UPEIDA
Construction of 6 Nos Sectionalisation stoppings Fly Ash Bricks including all materials in 8LS MD development district of Lower Workable Seam at Tawa II Mine Pathakhera Area WCL
Construction of 10 Nos. Isolation stoppings (Fly Ash Bricks) including all materials in 61LS/MD development district of Lower Workable Seam at Tawa II Mine Pathakhera Area WCL
Construction of 16 Nos. Isolation stoppings (Fly Ash Bricks) including all materials in 11LN (A) depillaring district of Lower Workable Seam at Tawa II Mine Pathakhera Area WCL
Insulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-03, 3x210 M.W., ATPS, Anpara
Providing GI sheet cladding arrangement on the Southern side of 1255N road to prevent the deposit of fly ash particles emanating from ESP area to the nearby village.