Loading…
Loading…
7,540 results • Best match
Limit Switch for Turbine HP/IP Stop and Control Valve, Cat No: LL1 -150S-M, Make: BCH, Complete Limit Switch for Bottom Ash Hopper area & use in many Pneumatic valve of FAE tower area of
TTPS Mech II AHP Unit III Breakdown maintenance of ESP APH ECO hoppers ash disposal system for a period of work on or after 08 10 2018 and upto 31 03 2019
TTPS Mech II AHP Unit II Breakdown maintenance of ESP APH ECO hoppers ash disposal system for a period of work on or after 08 10 2018 and upto 31 03 2019
Custom Bid for Services - AMC for Remote Monitoring system at Red mud pond, Ash pond & Intake pump House, NALCO, Damanjodi Similar Category Operation And Maintenance Of Other Machines And Plants
Removal of accumulated fly ash silt from all the storm water drains from CHP Gate to MTPS I Drain near railway track in MTPS-II for the period of 75 days from the date commencement of work.
MTPS II ES CircleEM Division Overhauling works in LT bus of415V LT ESP ABCD Fly Ash Ash Silo switchgears Complete cleaning tightness checking of horizontal Vertical Bus bar Bus bar joint outgoing terminals checking IR Value a
MTPS-II - Civil Circle - Dismantling the existing damaged RR Masonry Protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV /110KV SS yard of K.R.Thoppur 400KV SS. (Chainage 75.00m to 110.00m)
Construction of 32 (thirty two) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb
Collecting and lifting the spilled fly ash from all the four sides of floor areas of ESP hoppers transporting the same to Upper Ash Dyke by using contractors vehicle unloading at Upper Ash Dyke location and return
Single Tender(Urgent)
As per SOW
Replacement of Defective ECo,LTR,LTS, HTS, HTR, ITS hanger feed coil tubes, eroded water wall tubes, fin welding of water wall tubes, metal build up on eroded portions of water wall tubes and coil tubes, providing of carbon steel pads on water wall ... at bottom ash hopper ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes eroded water wall tubes,fin welding of water wall tubes,metal build up on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... at bottom ash hoppers ...
Replacement of eroded and defective ECO,LTS,LTR,HTS,HTR,ITS hanger feed coil tubes,eroded water wall tubes,fin welding of water wall tubes,metal buildup on eroded portions of water wall tubes and coil tubes , providing of carbon steel pads on water ... at bottom ash hoppers ...
Routine Breakdown capital Maintenance works of 2 X 250 MW Unit 3 and 4 Ash Handling Plant System and Various Pumps of Stage II at SSTPS RVUNL Suratgarh
Repairing reconditioning of components of Pumps Drum sub Assembly of Clinker Grinder and different types and sizes of valves in Ash Handling Plant stage I to IV Suratgarh
Improvement works to drain in 263 S road from Ash Handling Sub Division Office to Ash Silo Unit 4 and 5 in ICHS area at TTPS Reach 4
Biennial Job Contract for Routine and Breakdown maintenance of Dry and Wet Ash Handling system of stage III for 2X500 MW Unit 9 and 10 at NTPC Vindhyachal
Routine Breakdown capital Maintenance works of 2 X 250 MW Unit 3 and 4 Ash Handling Plant System and Various Pumps of Stage II at SSTPS RVUNL Suratgarh
Improvement works to drain in 263 S road from Ash Silo Unit 1 to 3 to Ash Handling Sub Division Office in ICHS area at TTPS Reach 3
Supply of Fluidizing fabric/Special Polyster for fluidizing pads for ESP hoppers and buffer hoppers unit- 1 and 2 in Ash handling system of CAM/Stage-I/BTPS
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Annual Overhauling of Ash Handling Plant Unit 4 FY 26-27; As per scope of work
Annual work contract of Stack monitoring Ambient Air Quality meteorological data monitoring Trade Effluent Analysis Sewage water treatment Analysis Ground water Analysis Canal water analysis Coal and bottom ash analysis at SSTPS Suratgarh O and M
Maintenance of bottom ash hopper of 2 210 MW and DP Extension Diversion of ash slurry disposal pipelines 300 NB in compartment A B of 2 110MW 2 210MW ash dyke along with other associated works.
Mine Development & Operations Service(MDO) - Per MT Based - Open Cast Mining; Manganese Ore, Providing of sufficient number of above ground skilled Tippers operators for transportation of ROM Dump materials bottom ash to plants siding stowing plants ..
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Experience Criteria, Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC), Compliance of BoQ specification and supporting document *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 1 Bid Number : GEM/2026/B/7138231 Dated : 23-01-2026 Bid Document 1/11, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 5 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Payment Timelines Payments shall be made to the Seller within 21 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Item wise consignee wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI Schedule 1 EMD Amount (In INR) 3173400 Schedule 2 EMD Amount (In INR) 528900 ePBG Detail Advisory Bank ICICI (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 29 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and 2/11 Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b). The EMD Amount will be applicable for each schedule/group selected during Bid creation. (c)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Manager Materials (IP) Materials Department, Oil India Limited, Duliajan, District - Dibrugarh, Assam - 786602. The vendor shall submit to OIL the copy of the SFMS message as sent by the issuing bank branch along with the original bank guarantee. E-mail id of Buyer: "[email protected]" (Oil India Limited) (Partho Nath)
Custom Bid for Services - 200152734, REPLACEMENT OF MS ASH DISPOSAL LINES WITH CAST BASALT LINES FROM PLANT BOUNDARY TO ASH POND OF NTPC RAMAGUNDAM Similar Category Operation and Maintenance Power House/Power Plant
Construction of Leach pit or soak pit with earth work in excavation, cement concrete work 250mm125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification Nahani trap, Silt chamber, PVC Junction
Repair and maintenance works in Chimney 1 for Unit 1 and 2 to arrest flue gas leakage and rectification work in fire brick lining and removal of fly ash from the hopper of Chimney at 18 mtr. level
MTPS-II - Civil Circle - Dismantling the existing damaged RR Masonry protection wall and constructing the same using Fly ash Bricks at Southern side of 230 KV / 110KV SS yard of K.R.Thoppur 400 KV SS. (Chainage 250.00m to 285.00m)
KTPS V Stage - Fal - G - Brick Plant - Leasing out of Plant and premises for manufacture of fly ash bricks on lease basis including maintenance of plant in working condition for the Period from April 2026 to March 2027
Unit I, II, III - Cleaning of zero meter floor in between BAH and Mill and disposal of fly ash, debris etc., from to debris yard for the period from the date on or after 08.04.18 and upto 30.09.18
Facility Management Services - LumpSum Based - THERMAL POWER PLANT; Housekeeping, Work of removing & disposing of fly ash collected at floor below ESP hoppers of unit 3 to 5; Consumables to be provided by service provider (inclusive in contract cost)
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC), Additional Doc 1 (Requested in ATC), Additional Doc 2 (Requested in ATC), Additional Doc 3 (Requested in ATC), Additional Doc 4 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 3 Bid Number : GEM/2026/B/7077968 Dated : 20-01-2026 Bid Document 1/8, -- Number of days for which Bid would be auto -- extended 7 Number of Auto Extension count 1 Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Estimated Bid Value 379595000 Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 5700000 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 15 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be 2/8 in favour of Beneficiary, wherever it is applicable. Beneficiary : NHPC LIMITED NHPC Office Complex, Sector-33, Faridabad, Haryana-121003 Bank Account No.: 00000010813608692, Credit Bank: State Bank of India, IFSC Code:SBIN00017313, Branch: CAG-II New Delhi (Branch Code :17313) SWIFT Code: SBININBB824 (Nhpc Limited)
Portland Pozzolana Cement (Fly Ash Based) (V3) Conforming to IS 1489 (Part 1) (Q2) MSE Exemption for Years Of Experience and Turnover Yes Startup Exemption for Years Of Experience and Turnover Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days Bid Number ( ) : GEM/2025/B/6195496 Dated : 05-05-2025 Bid Document 1/6 Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Portland Pozzolana Cement (Fly Ash Based) (V3) Conforming to IS 1489 (Part 1) (Q2) MSE Relaxation for Years Of Experience and Turnover Yes | Complete Startup Relaxation for Years Of Experience and Turnover Yes | Complete Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/7041900 Dated : 24-12-2025 Bid Document 1/7 Number of Auto Extension count 2 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 3 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
As per SOW
Dome valve Replacing and reconditioning works in ESP, APH, duct hoppers, Bottom Ash Hoppers and cleaning of bag filter, reconditioning of sleeve coupling, damaged fluidizing pad in ESP buffer hopper and clearing ash choke inside hoppers, Strengthenin
Work of dismantling fabrication erection of Parnala drain trenche of ESP roof and fabrication of dust dumping arrangement and other miscellaneous works in Ash Handling Division 2x210MW BTPS Parichha
Providing shelf arrangements inside the Time office Building for keeping Civil Project records, O and E Division records and for Oil Ash Handling Sub Division offices of MTPS II
Repairing / overhauling of Compressed air blowers and pneumatic power cylinders of ESP,rotation of 200NB/250NB ash slurry pipelines of Ash handling system of Unit no.#6,2x250MW PTPP, Parichha.
Procurement Fluidising cloth and fluid insert for Air lock Vessel belowBuffer Hopper Intermediate Silo and aeration panel for Buffer Hopperand HCSD Silo for ash handling system of NTPC KUDGI
Procurement of fast consuming spares of Sam Turbo make Ash Slurry Pump (Model No. AR-150/510) installed in ash pump house of ash handling plant of STPS-IV
Custom Bid for Services - BMC for Routine, Overhauling & Breakdown for Wet & Dry Ash handling System in Stage-I, NTPC-Barh Similar Category Operation and Maintenance Power House/Power Plant
AHP Dn PDFACS Providing 3 Nos 1400 CFM capacity screw compressors for Operation of PDFAC system to transport the fly ash from one Intermediate Surge hopper of one unit to 1000 MT Silo on Rental basis for 90 days
Protection of existing RCC road top by OGPC over RCC road in between Gdya-Sarni main road to fly ash loading point and up-to approach road to 111 hectare ash pond from sub-station side at STPS, Sarni
Collecting and lifting the spilled fly ash from all the four sides of floor areas of ESP hoppers transporting the same to Lower upper ash dyke by using contractors vehicle unloading at Lower Upper Ash Dyke location and return
Unit I, II and III - Cleaning of zero meter floor in between BAH and Mill and disposal of fly ash, debris etc., from to debris yard for the period from the date on or after 08.10.2018 and upto 31.03.2019
TN-MM-1949 Supply and Erection, Testing and Commissioning of twin lobe air blowers with associated items for ESP fluidizing system for wet ash disposal system, AHP Unit 1 to 4, STPS, RVUNL, Suratgarh
Anticipated breakdown rectification and maintenance works to be carried out on 3Nos ash disposal lines of Stage-II as and when required during the year 2026-27 from the date of commencement to 30.09.2026.