Loading…
Loading…
7,540 results • Best match
TGGENCO BTPS STAGE II Instrumentation Division Removing, cleaning, testing and refixing of solenoid seal kits, Pressure switches, limit switches, auto drain valves timer based drain valves, vacuum transmitters, level switches, level transmitters, ... in Ash handling plant, ...
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years Of Experience Yes Startup Exemption for Years Of Experience Yes Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled Yes RA Qualification Rule H1-Highest Priced Bid Elimination Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Inspection Required (By Empanelled Inspection Authority/Agencies pre- registered with GeM) No Bid Number ( ) : GEM/2024/B/5656264 Dated : 07-12-2024 Bid Document 1/7 Payment Timelines Payments shall be made to the Seller within 90 days of issue of consignee receipt-cum-acceptance certificate (CRAC) and on-line submission of bills (This is in supersession of 10 days time as provided in clause 12 of GeM GTC) Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No MII Purchase Preference MII Purchase Preference Yes MSE Purchase Preference MSE Purchase Preference Yes 1. If the bidder is a Micro or Small Enterprise as per latest definitions under MSME rules, the bidder shall be exempted from the requirement of "Bidder Turnover" criteria and "Experience Criteria" subject to meeting of quality and technical specifications. If the bidder is OEM of the offered products, it would be exempted from the "
Dome valve replacement reconditioning works in ESP APH duct hoppers Bottom Ash Hoppers and cleaning of bag filters replacement of damaged fluidizing pad in ESP hopper buffer hopper and clearing the ash chokes inside hoppers Strengthening wornout po
Monitoring and Attending Patch welding works in fly bottom ash conveying lines reconditioning of worn out bends spool pieces dismantling the worn out expansion joints Bellow joints and flanges joints renewing and reassembling the joints to resume the
Dome valve replacement reconditioning works in ESP APH duct hoppers Bottom Ash Hoppers and cleaning of bag filters replacement of damaged fluidizing pad in ESP hopper buffer hopper and clearing the ash chokes inside hoppers Strengthening wornout port
Procurement of different types of spares for water pumps (Beacon weir make ) of stage-II and III of Ash handling System for 4 X 210 MW units at GGSSTP Ropar.
Lifting and disposal of Dry/Wet ash accumulated under ESP area and in peripheral drain trenches of ESP during overhauling of Unit no.6 ,2x250MW, ash handling plant, PTPP, Parichha
Balance Work of Fabrication and Erection of Surge and Settling Tank and Erection of Associated Equipment and Piping for Ash Handling System fort Meja Thermal Power Project (2 x 660MW).
Fabrication of Silencer of Vacuum Pumps, M.S. bends, Flushing apparatus, Various platforms and Painting of Collector Tower in Ash Handling Plant, DTPS, HTPS, Kasimpur for a period of One Year.
PROCUREMENT OF ASSEMBLY AND SPARES FOR 250 NB ALV PNEUMATIC ISOLATIONVALVES AND SPARE PARTS FOR CHAIN WHEEL OPERATED KNIFE EDGE GATE VALVEFOR ASH HANDLING SYSTEM FOR NTPC RAMAGUNDAM AND KUDGI
Operation and Maintenance (PLC based) of Ash Handling System (Wet and Dry mode) of 2x210 MW Unit 3and4 at Parichha Thermal Power Station Jhansi. (For the period of 02 years)
Construction of Community soak pit and plantform with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS code mentio
Arresting fly ash seepage from the damaged portions of concrete by providing micro concrete and Pressure grouting around ash conveying pipe between supporting column and silo top ceiling of ASh Silo 1 and letter writing to the newly constructed buil
Reconstruction of tilted Boundary Wall (North side) of approx. length 120 m considering fly ash brick along with conventional brick Guard Wall and painting of full Boundary Wall and other allied works at Raina 132/33 KV Substation under Burdwan Area
Construction of Community soak pit and plantform with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS code mentio
Construction of 16 Nos 0.35m Thick Ventilation Stopping with Fly ash Bricks in between 9L and 10L from 13D to 28D in RV Seam (Panel No-03 Development District ) Through C and E Pit under under Nakrakonda Kumardihi B Colliery
Supply and laying of Fly Ash Earth GSB WMM DBM 60mm thick and BC 40mm thick 60mm thick interlocking tiles complete in all respect and all other works contingent thereto Including three years defect liability and mtc period free of cost
Dismantling of existing heavily wornout 150NB 200NB 250NB MS ERW Headers and pipe lines and erection of new MS ERW Headers and pipe lines in TAC water system TAC air system and fly ash vacuum system to ESP in compressor house
Construction of 17 (Seventeen) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification
Construction of 60 (sixty) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification
Construction of Community soak pit and plantform with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS code mentio
9" : BAND CLAMP, 65NB: VALVE DISC, 9" : SEAL STRIP, 200NB: REPLACEABLE SEAT/WEAR RING, 65NB: LEVER, 65NB: VALVE SEAT, 12" X10" : FLY ASH DIFFUSER, 65NB: CASING, 12" X10" : GATE SHAFT GASKET, 12" X10" : LEVER SEAL DISC, 12" X10" : DIFFUSER MOUNTING PLENUN
Construction of 22 (twenty two) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification
Clearing the jungle growth, removal of accumulated fly ash silt from the drains and upkeeping around H2 Plant and providing concrete flooring in the loading point area at Hydrogen Gas generation Plant and miscellaneous works at Time Office, PTP Moto
Construction of 18 (eighteen) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification
Construction of 67 (sixty seven) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification
Construction of Community soak pit and plantform with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS code mentio
Customized AMC/CMC for Pre-owned Products - BMC for Hitachi Hirel make UPS systems in Unit-1, 2, 3, 4, 5, 6, 7 and Dry Fly Ash of TPS-II; Thermal Power Plant; Annual Maintenance Contract (AMC); As per Scope; No
ST030300009 Self aligning carrying rollers with bracket assembly for Bottom Ash Conveyors, ST030300010 Self aligning return roller with bracket assembly for Bottom Ash Conveyors, ST030300016 Impact idler frame assembly along with idlers 35 degree frame, ST030300017 Carrying idler frame assembly along with idlers 35 degree frame, ST030300020 Return Roller with Bracket assembly for 650 mm BW Conveyor, ST030300046 Self Cleaning return roller assembly with 2 nos of J Bracket, ST030300047 Carrying Idler frame of 8 mm Thick 35 deg with 3 number of rollers assembly
As per SOW
The Work of Routine Breakdown capital Maintenance works of 2 X 250 MW Unit 3 and 4 Ash Handling Plant System and Various Pumps of Stage II at SSTPS, RVUNL, Suratgarh
Operation and Maintenance PLC based of Ash Handling System Wet Dry mode of 2 210 MW Unit 3 4 at Parichha Thermal Power Station Jhansi. For the period of 02 years
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Service Contract for Preservation for life enhancement of Buffer Hopper in Unit 3 & 4 Ash Handling Plant; Service Provider
Custom Bid for Services - 200141709 BMC for routine patrolling, overhauling and breakdown for Ash disposal lines and AWRS System at NTPC Barh ST-I and ST-II Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - Removal, re-erection and alignment of buried/under earth ash disposal pipeline Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Excavation, loading of Pond Ash from 111-hectare Ash Dyke of STPS, Sarni Distt. Betul (M.P.), transporting and unloading at construction site of road projects of NHAI (4 Lanning project of Itarsi-Betul section)
Handling and Transport on Lumpsum Basis - Excavation, loading of Pond Ash from Ash Dyke & transportation and unloadling at Stone mine at gat no 411, 413 & 418, Area 3 point 77 Hec, Village Panchgaon, Nagpur
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6325024 Dated : 10-06-2025 Bid Document 1/10 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 500000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AGM (C&M), USSC NTPC Limited, AGM (C&M), USSC 9th Floor Tower – C, Commercial Complex Plot No. C - 03, Central Business District (CBD), Sector -21, Tuta Atal Nagar, Naya Raipur (CG)- PIN: 492101 (Ntpc Limited) Splitting
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days Bid Number : GEM/2025/B/6307201 Dated : 05-06-2025 Bid Document 1/10 ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 500000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AGM (C&M), USSC NTPC Limited, AGM (C&M), USSC 9th Floor Tower – C, Commercial Complex Plot No. C - 03, Central Business District (CBD), Sector -21, Tuta Atal Nagar, Naya Raipur (CG)- PIN: 492101 (Ntpc Ltd) Splitting
Break down maintenance and related repairing works of ESP hopper, Rotary vane feeder body (RVF) body and rotor assembly for ESP Hopper and Fabrication WORK of ESP bottom ash system of all the three units of 3X210 MW, ATPS, Anpara
Routine preventive Break down maintenance of ESP Bottom Ash Evacuation System AND general upkeep of dry fly extraction plant including its silo area and Fabrication AND erection of bellow type expansion joints of flushing apparatus of ESP Air pre he
Routine preventive Break down maintenance of ESP Bottom Ash Evacuation System AND general upkeep of dry fly extraction plant including its silo area and Fabrication AND erection of bellow type expansion joints of flushing apparatus of ESP Air pre he
TGGENCO BTPS STAGE II CAM Division Emergency rectification, Preventive and periodical maintenance of HP Ash water pumps, LP Ash water pumps,Economizer water pumps,Bottom ash Overflow transfer pump, Drain Pumps and ESP Water Wash Pumps during the year 2026-27
Periodical cleaning of all drains in Bottom ash hopper plant area, boiler area and mill area in Unit I Unit II and III and C row drain at Power House for a period of six months from the date of commencement
Providing RCC road at Ch-200 meter and CH 1900 meter of HCSD extended bund to provide proper approach to ash lifting vehicles at 130 hectares ash dyke of extension unit No-10 and 11 at STPS, Sarni.
Construction of Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm 125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS code mentioned in PRD
Construction of Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm125mm brick work with fly ash or cement concrete bricks with honey comb structure as per specification of IS code mentioned in PRD
Construction of 80 (eighty) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification r proposed
Construction of Vertical filter chembar/Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement conc
Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motors feeder motors