Loading…
Loading…
7,540 results • Best match
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 5 Bid Number : GEM/2025/B/6753543 Dated : 06-10-2025 Bid Document 1/10 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank ICICI EMD Amount 200000 ePBG Detail Required No (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : AGM NTPC Limited, AGM (C&M), USSC 9th Floor Tower – C, Commercial Complex Plot No. C - 03, Central Business District (CBD), Sector -21, Tuta Atal Nagar, Naya Raipur (CG)- PIN: 492101 (Ntpc Limited)
Handling and Transport on Lumpsum Basis - Contract for Exc., loag. Pond Ash from Dyke & trnp./unlog. at stone mine Kh. no. 452/2, 453, 452/1, 480/1 & 480/4, 479/2 & 479/3 Umred Nag.
PROCUREMENT OF MandP MAKE COMPLETE SEAL WATER PUMP FOR STAGE-II BPH ATNTPC KORBA AND COMPLETE ASSEMBLY OF BAHP PUMP and BALP PUMP AND SPARESOF BALP, BAHP, FAHP and FLUSHING WATER PUMP FOR BOTTOM ASH SYSTEM ATSTAGE-II OF NTPC VINDHYACHAL STPS
TTPS Mech II AHP Unit I II III Breakdown works in AWPH equipments Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump for the period of work on or after 08 10 2018 and upto 31 03 2019
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motors feeder motors
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per speci
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per speci
Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors mill motors lub oil motors feeder motors and associated
EMII Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors, mill motors lub oil motors feeder motors and assoc
Environmental Base Line Data Generation for one season (Non-Monsoon) in respect of (GROUP I) Air, Water, Noise and Soil Analysis for 01 Project of M/s NTPC Vindhyachal ( Back-Filling of fly ash in Mine voids of Gorbi Mines of M/s NCL)
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
Construction of Leach pit / soak pit/Filter Chamber or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with 1st class bricks, fly-ash or ce
Construction of 65 (sixty five) nos. Leach pit or soak pit with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per specification of IS c
EM II Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance works of boiler side fan motors mill motors Lub oil motors feeder motors
Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area, etc., and routine cleaning and minor maintenance work of boiler side fan motors, mill motors, lub oil motors, feeder motors unit 2
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors mill motors lub oil motors feeder motors and associated
routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area etc and minor maintenance work of boiler side fan motors in Unit I for the period from 01 04 2023 to 31 03 2024
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
TTPS Mech II BM Unit I II III Cleaning of zero meter floor in between BAH Mill and disposal of fly ash debris etc from to debris yard for the period from the date on or after 08 04 19 and upto 30 09 19
Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motors feeder motors
NCTPS I SE MI circle R M 23 24 BM Dn Unit I II III Cleaning the entire boiler structures buckstay beams cable trays walk ways staircase handrails pipes burner corners pipelines of various systems from fly ash coal powder deposite in all the three
Routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc routine cleaning and minor maintenance works of boiler side fan motors mill motors lub oil motors feeder motors and associated
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with earth work in excavation, cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey c
Construction of Leach pit / soak pit or any GWM structure as per direction of the Engineer in charge with cement concrete work as per proposed ratio, 250mm/125mm brick work with fly-ash or cement concrete bricks with honey comb structure as per speci
Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area and mill area etc and routine cleaning and minor maintenance work of boiler side fan motors mill motors lub oil motors feeder motors
MTPSI ES Circle EM II Division SD III complete rewinding of Kirloskar make 150KW 415V 1480RPM Sl.No 2851124 7 LT motor released from HP 1A motor bed in Ash handling Pump House stage I
Custom Bid for Services - Comprehensive Mega O&M Contract for Operation, Mechanical, Electrical and C&I Maintenance for STG2 Ash Handling System at NTPC Vindhyachal Similar Category Operation and Maintenance Power House/Power Plant
Hiring of Earth Moving Equipments, Material Handling Equipments and Cranes (per Hour basis) - As Per Buyer's Requirement; Hiring of Backhoe Loader for Mechanical Maintenance Activities related to OPGC Ash Pond Ash Slurry Line Corridor; Hiring of Ba..
Custom Bid for Services - TEST STACK EMISSION, Custom Bid for Services - TEST DG EMISSION, Custom Bid for Services - TEST AMB AIR QUALITY, Custom Bid for Services - TEST TRADE EFFLUENT, Custom Bid for Services - TEST DOMESTIC SEWAGE, Custom Bid for ... TEST FLY ASH LEACHAT, ... TEST FLY ASH , ...
Handling, Transport and Other Mining Services - Percentage quote based - Slabwise Rate Contract for Ash Transportation to construction site of road projects of NHAI and other Central or State Government Road construction department Authority/PMGS..
AHP Dn Unit I- ECO Hopper Rerouting of hopper discharge pipe line and shifting of mixing apparatus and its accessories from 0 mtr to 22 mtr elevation fabrication and erection ECO hopper platform for economizer ash disposal system in unit I
Round the Clock Operation Preventive Maintenance of Ash Slurry Pumps, their sealing pumps, Sump Pumps, HP and LP flush pumps of Ash Handling System of Unit No. 7 (110MW) for a period of One year
Emergency break down preventive maintenance of 6.6 KV station switchgear 9th 10th 11th unit switchgear coal handling and ash handling switchgear including daily monitoring checking and cleaning of 6.6 KV switchgear of 3x200 MW BTPS
Assistance to maintenance and operational activities of elect equip associated with BTG Control Room, Lighting installat and equip of Ash Handling Plant n Assist to opernl activities of electrical equipment associated with switchyard and GIS.
Procurement of Feeder Discharge valve complete assembly, Butterfly andBall vales of CPU ssystem and KGV complete assembly for 450 NB sizes andspare parts for KGV of different sizes used in ash handling system ofNTPC KUDGI
Custom Bid for Services - Excavation, loading, transportation and unloading of pond ash from ash dykes of NTPC Vindhyachal to the abandoned pit of Gorbi mine of NCL Similar Category Goods Transport Service – Per MT per KM Based Service
TTPS Mech II AHP Unit I II III Breakdown works in Ash Water Pump House Overhauling of Bottom ash water pump High pressure water pump Low pressure water pump for the period of work on or after 08 04 2018 and upto 30 09 2018
Taking down of old unserviceable LT Panel, Supplying installing erecting commissioning and testing, Material and Labour for shifting of BMC three phase energy electric meter, Excavation in trenches, Returning filling in trenches spreading levelling ... trenches fly ash bricks, ...
Portland Pozzolana Cement using fly Ash as per IS 1489 (Part 1) (Q2), A Coarse sand free from vegetation, B Coarse sand free from vegetation, Coarse aggregate 40mm graded, Stone Boulder 9inch to 12inch, PVC Pipes 75mm each 3 Mtr long Make Prince or Finolex or Supreme
Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area etc and minor maintenance work of boiler side fan motors in Unit III for the period from 01 04 2023 to 31 03 2024
Charges for routine cleaning of fly ash and coal dust from the cable trays and cable ducts in and around boiler area etc and minor maintenance work of boiler side fan motors in Unit II for the period from 01 04 2023 to 31 03 2024
Unit V - Cleaning of I and II Pass Boiler structures, from 0 m. to 56 m elevation, PRDS floor, HWMP and BFP room, collection and devolution of scrap materials and disposal of fly ash, debris etc. from the date on or after 8.10.18 and upto 31.03.18
Handling, Transport and Other Mining Services - Percentage quote based - Slab-wise Rate Contract for Ash Transportation to construction site of road projects of NHAI and other Central or State Government Road construction department/Authority/PMG..
Handling, Transport and Other Mining Services - Percentage quote based - Ash Transportation, Rate Contract for Excavation, Loading and Transportation, Unloading of Ash form NTPC SIMHADRI to unloading at construction site of road projects of NHAI and ..
Rate Contract of CAND I system of (Package 1) Main Plant, (Package 2) Ash handling plant (AHP) AND its Auxiliaries including SILO and (Package 3) Combined Ash Slurry and Recovery Water System of BTPS-A (1x500MW)
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; Service Contract for Supply and Installation of Insulation and Cladding Sheet in ESP Hopper Ash Handling Plant Unit 3 & 4; As mentioned in Scope
Transportation Contract for 0-50 KM slab for Excavation, loading of Pond Ash from NTPC Khargone Ash Dyke, transporting and unloading at construction site of road projects of NHAI and other Central or State Government road construction department / Au