Procurement of Spares Ash Extraction Valve Cylinder and Seal Kit of Ash Handling System of Stage-IV
Procurement of Filter Bags and Cages for Silo Vent filter of Ash Handling System of Stage-IV
Dr. MVR RTPP-M12-CAM-Stage3-Procurement of 150NB plate isolation valve for ash handling plant-reg
Dr. MVR RTPP-M12-CAM-Stage3-Procurement of 150NB plate isolation valve for ash handling plant-reg
PROCUREMENT OF SLEEVES SUITABLE FOR 200 NB & 300 NB PIPE SLEEVE COUPLINGS FOR DRY ASH HANDLING PLANT
PROCUREMENT OF VACUUM PUMP OF SIZE 140 PERTAINING TO ASH HANDLING PLANT OF STAGE-IV/500MW UNIT
DrNTTPS/Supply of Rotex make 5/2 solenoid valves and its spares kits for Ash Handling Plant
PROCUREMENT OF SLEEVES SUITABLE FOR 200 NB & 300 NB PIPE SLEEVE COUPLINGS FOR DRY ASH HANDLING PLANT
Dr. MVR RTPP_M12-BM&CAM-Stage3-Procurement of domes for dome valves of ash handling plant-reg
Providing and Painting of Equipments & Pipe Lines installed at Unit-3 Ash Handling System, BTPS during AOH.
Clearing & cleaning of Rat hole inside the ESP hoppers of unit-1 Ash handling during Overhauling/shutdown.
Procurement of Rubber Gaskets of different sizes for Sleeve Couplings for Ash Handling Plant, DSTPS, DVC, Andal.
PROCUREMENT OF 100MM &200MM CERAMIC LINED DOUBLE DISC VALVE ALONG WITH PNEUMATIC CYLINDER FOR ASH HANDLING SYSTEM
PROCUREMENT OF SPECIAL CAST IRON WELDING ELECTRODES PERTAINING TO DRY ASH HANDLING OF STAGE IV DR NTTPS
PROCUREMENT OF SPECIAL CAST IRON WELDING ELECTRODES PERTAINING TO DRY ASH HANDLING OF STAGE IV DR NTTPS
Procurement of Feeder Ejector Complete Assembly Below APH and Duct Hoppers and spares of Ash Handling System.
PROCUREMENT OF 100MM &200MM CERAMIC LINED DOUBLE DISC VALVE ALONG WITH PNEUMATIC CYLINDER FOR ASH HANDLING SYSTEM
Procurement of spares of vacuum pump model 140 in ash handling system of 210 mw ATPS Chachai
Procurement of spares of silo drain pump for ash handling system of 210 MW ATPS MPPGCL Chachai.
Procurement of spares of Avcon make instruments in Ash Handling System installed at 2X660MW, SSTPP, MPPGCL, Dongalia
Dr. MVR RTPP-M12-BM&AHP-Stage4-Procurement of bends and tees for ash handling plant-reg.
Supply of Polyurethane (PU) Tubes and Pneumatic Connectors for the Main Plant and Ash Handling Plant (AHP)
Dry Fly Ash Powder From Thermal Power Plant Sealed In 50 Kg Bags To Avoid Moisture ( 6000 kilogram ), Steel Slag GBFS Powder For Construction Sealed In 50 Kg Bags To Avoid Moisture ( 4000 kilogram )
operation and maintenance of mechanical, electrical and Control andInstrumentation systems of Ash handling Plant of Unit #1 and includingall related sub-systems/ auxiliaries /common supporting systems of allthe units
TGGENCO BTPS STAGE-II CAM Division Preventive Periodical Maintenance and Regular maintenance works of Economizer Hoppers, APH Hoppers, Duct Hoppers and Discharge lines from Bottom Ash Hoppers and Coarse Ash lines from Coarse Ash Tank upto Ash slurry ... 4 Ash Handling System ...
RCC / CC Flooring 1 Around CT-1 Cell I and J, Instrument air compressor 2 Around Ash Lifting Area Outside factory area
Hiring of 16-Wheels Dumpers for ash transportation from silos to contingent ash dyke for 30 days
Custom Bid for Services - Excavation and loading the pond ash from dyke, Custom Bid for Services - Transp unloading of ash at mines, Custom Bid for Services - Providing and laying earth cover
CONTRACT FOR ASSISTANCE IN O and M, HOUSEKEEPING OF ASH HANDLING SYSTEM ANDASH MOUND/DYKE MANAGEMENT IN PHASE I (3X800MW) OF PVUNL Patratu.
RC for Operation of LWTP and AWRS St-I and Dry Ash Handling St-II including Silo loading/unloading system
Custom Bid for Services - Annual Rate Contract for Mechanical maintenance of Ash Handling Plant including round the clock Operation assistance of Ash Handling System and Upkeepment AND removal of technological waste of Unit 1 AND 2 2X500 MW of DSTPS ..
Procurement of Ash Slurry Discharge valve for Ash Handling SystemStage-V and spares for Sistag make MH-400DN PN25 valve of Ash HandlingSystem Stage-II
Transportation of pond ash from ash dykes of NTPC Farakka to NHAI sitesof NH -34 for Raiganj- Dalkhola section and New 4 lane Farakka bridgeover river Ganga including approaches
Procurement of Different types CI pipes Couplings and bolts for ash disposal lines of stage II and III at GGSSTP Ropar
Procurement of Spares of Darling make Ash Disposal Pumps for dump ash system for AHP-I, PH-I, SGTPS, MPPGCL, Birsinghpur
Ash Disposal and Utilization Study related to Environmental Clearance of proposed 2X660 MW Chhabra (Extension) Coal based Supercritical Thermal Power Project.
Maintenance Contract of Ash Disposal Pipe Line and Ash Water Pipe Line of Stage I and Stage II and Stage III
Dr. MVR RTPP-M12-CAM-Stage1-Procurement of shaft sleeve suitable for ash disposal pump of model AR 300/650-reg
Custom Bid for Services - Maintenance of Ash Disposal Pipeline for NTPC Farakka Similar Category Operation and Maintenance Power House/Power Plant
Custom Bid for Services - ASH DISPOSAL PIPELINE EXTENSION WORK IN ASH POND Similar Category Operation and Maintenance Power House/Power Plant
Construction of additional 02 nos. isolation stoppings (fly ash bricks) including all materials in 53LS DEP district LWS at Tawa 2 Mine, Pathakhera Area, WCL
Construction of 0.375 mtr thick 2 nos ventilation stopping (fly ash) and 1 No repairing of ventilation stopping in R-VII Seam at Shyamsundarpur Colliery
Insulation, refractory removal of fly ash, debris from pressure part, ducts, hoppers roof of penthouse etc. during overhauling of Unit-03, 3X210 M.W., ATPS, Anpara
Construction of 05 No. Isolation Stoppings (fly ash bricks) including all materials in 53LS/MD dep. district, LWS at Tawa-2 Mine Pathakhera area, WCL.
ARC of Hiring of compressor machine for transfer of excess fly ash from one bulker to another empty bulker at Silo area in RGTPP Khedar
Procurement of 100 NB and 150 NB PIPE-IN-PIPE (PIP) for dry fly ash dense phase system of AHP Unit 4, ESP Pass-A
Construction of 4 no fly ash bricks Ventilation Stoppings (with door) for return airway of Lower Workable Seam at Chhatarpur 1 Mine Pathakhera Area WCL
Renovation and repairing of damaged road of ash bulker movement for transportation of fly ash from different silo, inside the plant area at DVC, MTPS
Custom Bid for Services - Fly Ash Trench Cleaning and Legacy Ash Removal Works at NTPC Kaniha Similar Category Operation and Maintenance Power House/Power Plant
Construction of 11 nos. ventilation stopping (fly ash bricks) including all materials in B-4 Development panel in BWS at Tawa-II Mine, Pathakhera, WCL.