Loading…
Loading…
684 results • Best match
Annual Overhauling works of 6.6 KV Unit Station and Ash handling switchgear buses of 2x210 MW unit 4 PTPP Parichha
Supply of Spares for Ash Handling System for overhauling of Unit no. 8 and O and M, DTPS, HTPS, Kasimpur.
Annual Overhauling works of 6.6 KV Unit, Station and Ash Handling Switchgear Buses of 250 MW Unit #6, PTPP, Parichha
Supply of pond ash from ash dykes of PTPP Parichha to package 4 and package 5 of Bundelkhand Expressway developed by UPEIDA
Marking and Turning of 400 NB MS ERW ash disposal pipe line of 2x500MW, DTPS, Anpara from Plant Barrier gate to Belvadah Ash dyke
Reclamation and corrosion resistant epoxy painting of Bottom Ash Hopper outer surface clariflocculator system collector tanks with associated structures of unit no 3 4 2x210 MW PTPP
Insulation, refractory and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-7 Of 2x500 M.W DTPS Anpara
Repairing, Fabrication and machining of various items of Ash Water/ Ash slurry pumps of ash handling plant 2x250 MW PTPP Parichha
Supply of LED Colour Monitor and Operation Work Station for APC DFA and Ash Handling System of 2x500 MW, BTPS, Anpara
Supply of Green net AND GI wire for Ash silo for Gorbi for Ash handling division of 2X500 MW DTPS Anpara
Fabrication/ repairing/overhauling of gear box of clinker grinder and other miscellaneous items of ash handling system of 2X250MW, PTPP Parichha
Fabrication/ repairing/overhauling of gear box of clinker grinder and other miscellaneous items of ash handling system of 2X250MW, PTPP Parichha
Routine/Preventive/Breakdown maintenance work (Mechanical, Electrical and C and I) of complete ash handling system, 2x500 MW D-TPS Anpara
Routine maintenance of the four Nos Six Nos Three Nos Ash disposal pipes of 3X210 MW ATPS 2X500 MW B TPS 2X500 MW DTPS Anpara
Insulation, refractory, skin casing repairing and removal of fly ash, debris from pressure part, ducts, hoppers and roof of pent house etc. during overhauling of unit-6,2x500 M.W., DTPS, Anpara
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - Industry Unit; transportation of dry fly ash from SILO of DTPS anpara to NCL gorbi mines pit 03; Service Provider
annual breakdown maintenance of AC,UPS and float battery charger and cleaning of ash handling plc control room of unit 9 10and11
Round the clock maintenance of complete 6.6 KV Station Unit and Ash handling switchgears of 2x210 MW Unit 3and4 PTPP Parichha Jhansi
Fabrication/repairing/fitting of various parts of Bottom Ash Hopper Flushing Apparatus of Eco/APH/Duct and Buffer Hoppers during overhauling of Unit 9 250MW AHD DTPS Kasimpur Aligarh
Repairing, Fabrication and machining of various items of Ash Water/ Ash slurry pumps/clinker grinder of ash handling plant 2x250 MW PTPP Parichha
Operation and Maintenance PLC Based of Ash Handling SystemWet Dry mode of 2x210 MW unit 3 4 at Parichha Thermal Power Project Jhansi
Errection of Reinforced Earth wall with precast penal. Assembling and Joining of Synthetic Geogrid. Supply and Compaction of Flyash and Filter Media.
Handling, Transport and Other Mining Services - Percentage quote based - Rate contract for Transportation of Pond ash from MUNPL to NHAI UPSBCL and other Govt Road projects
Water washing and inspection of ESP internal (20 fields of Unit no.5) and other miscellaneous works of ash handling system of 2X250 MW
Works of Insulation, Refractory works, removal of accumulated fly ash from inside the heating surface and other areas of Boiler and their disposal from Boiler of unit no. 6 and 7 DTPS Anpara
Insulation, refractory works, removal of accumulated fly ash from inside the heating surface and other areas of boiler and their disposal from boiler during overhauling of unit No. 5, 2X500 MW, BTPS, Anpara
Fabrication and replacement work of 200 mm NB/80 mm NB PIP pipeline and 200 mm NB Plain MS ERW dry fly ash conveying pipeline from ESP unit7 to silo of 2x500MW, DTPS, Anpara
Fabrication and replacement work of 200 mm NB/80 mm NB PIP pipeline and 200 mm NB Plain M.S ERW dry fly ash conveying pipeline from ESP unit 7 to silo of 2x500MW, DTPS, Anpara
Fabrication and replacement work of 200 mm NB/80 mm NB PIP pipeline and 200 mm NB Plain M.S ERW dry fly ash conveying pipeline from ESP unit 6 to silo of 2x500MW, DTPS, Anpara
Fabrication and replacement work of 200 mm NB 80 mm NB PIP pipeline and 200 mm NB Plain MS ERW dry fly ash conveying pipeline from ESP unit 6 to silo of 2x500MW, DTPS, Anpara.
Supply of Slide Plates for SSVs and MHVs for Ash Handling Plant, ETPS, HTPS and Slide Plates 200NB and 250 NB for AHD, DTPS, HTPS, Kasimpur
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 4 Bid Number : GEM/2025/B/6746807 Dated : 07-10-2025 Bid Document 1/8 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Portland - Pozzolana Cement (Fly Ash Based) for Bulk Buying as per IS 1489 (Part 1) (Q2) MSE Relaxation for Years of Experience and Turnover No Startup Relaxation for Years of Experience and Turnover No Document required from seller Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? No Minimum number of bids required to disable automatic bid extension 3, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6986711 Dated : 12-12-2025 Bid Document 1/9 Number of Auto Extension count 3 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Maintenance of bottom ash hopper of 2x210 MW and DP Extension Diversion of ash slurry disposal pipelines 300 350NB in compartment A and B of 2X110MW 2X210MW ash dyke along with other associated works
Preventive checking and mechanical maintenance of Furnace Bottom Ash Hopper Scrapper Conveyor Clinker Grinder and related system and work of Assistance in operational work of all the three units of 3X210 MW ATPS Anpara.
Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) - THERMAL POWER PLANT; Insulation, refractory works, removal of accumulated fly ash from inside the heating surface and other areas of boiler and their disposal from boile..
Servicing and Overhauling of C and I field equipment installed at Boiler, Ash Handling and its auxiliaries during overhauling of Unit 5 of 2X500 MW BTPS, Anpara.
Repairing /Replacement of plates of bottom ash hopper and removal of damaged refractory and casting of new castable/ pourable refractory and other miscellaneous work of BAH during overhauling of Unit no.6, 2x250MW, PTPP, Parichha.
Maintenance of bottom ash hopper of 2 210 MW and DP Extension Diversion of ash slurry disposal pipelines 300 NB in compartment A B of 2 110MW 2 210MW ash dyke along with other associated works.
Work of dismantling fabrication erection of Parnala drain trenche of ESP roof and fabrication of dust dumping arrangement and other miscellaneous works in Ash Handling Division 2x210MW BTPS Parichha
Repairing / overhauling of Compressed air blowers and pneumatic power cylinders of ESP,rotation of 200NB/250NB ash slurry pipelines of Ash handling system of Unit no.#6,2x250MW PTPP, Parichha.
Lifting and disposal of Dry/Wet ash accumulated under ESP area and in peripheral drain trenches of ESP during overhauling of Unit no.6 ,2x250MW, ash handling plant, PTPP, Parichha
Balance Work of Fabrication and Erection of Surge and Settling Tank and Erection of Associated Equipment and Piping for Ash Handling System fort Meja Thermal Power Project (2 x 660MW).
Fabrication of Silencer of Vacuum Pumps, M.S. bends, Flushing apparatus, Various platforms and Painting of Collector Tower in Ash Handling Plant, DTPS, HTPS, Kasimpur for a period of One Year.
Operation and Maintenance (PLC based) of Ash Handling System (Wet and Dry mode) of 2x210 MW Unit 3and4 at Parichha Thermal Power Station Jhansi. (For the period of 02 years)
Operation and Maintenance PLC based of Ash Handling System Wet Dry mode of 2 210 MW Unit 3 4 at Parichha Thermal Power Station Jhansi. For the period of 02 years
As per SOW
Custom Bid for Services - Removal, re-erection and alignment of buried/under earth ash disposal pipeline Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2) Repair, Maintenance and Installation of Plant Systems/Equipments
Break down maintenance and related repairing works of ESP hopper, Rotary vane feeder body (RVF) body and rotor assembly for ESP Hopper and Fabrication WORK of ESP bottom ash system of all the three units of 3X210 MW, ATPS, Anpara
Routine preventive Break down maintenance of ESP Bottom Ash Evacuation System AND general upkeep of dry fly extraction plant including its silo area and Fabrication AND erection of bellow type expansion joints of flushing apparatus of ESP Air pre he