Loading…
Loading…
1,362 results • Best match
Structural audit of flyovers of New Nizamuddin Flyover,Nehru Place Flyover,Sarita Vihar flyover,Andrews Ganj Flyover
Structural audit of flyovers of IIT Delhi Flyover, Moti Bagh Flyover, Africa Avenue Flyover, Savitri Cinema Flyover, Mayapuri flyover
Providing crash barrier with iron grills on Outer Ring Road from Wazirabad Flyover, Burari Flyovers under Sub Division-I of Division C and ND-Roads, New Delhi.
Structural audit of flyovers of Hanuman Setu Flyover,Ashram Chowk Flyover,Vikas Marg and Road No.57
Structural audit of flyovers of Tilak Nagar flyover near metro station,Punjabi Bagh Club flyover,Raja Garden Flyover,Tilak Nagar flyover near District Centre,Peera Garhi flyover
Repair work flyover mahipalpur-Renovation of lighting arrangement Mahipalpur fly over near IGI airport in Ward no. 133 Under
Strengthening of Outer Ring Road (Chirag Delhi Flyover to IIT Flyover) (ID-1369), A-1 Block, Panchsheel Enclave Road (ID-537) and SMA on Flyovers- IIT Flyover, Panchsheel Flyover and Chirag Delhi Flyover through cold milling and recycling process
Strengthening of Outer Ring Road (Chirag Delhi Flyover to IIT Flyover) (ID-1369), A-1 Block, Panchsheel Enclave Road (ID-537) and SMA on Flyovers- IIT Flyover, Panchsheel Flyover and Chirag Delhi Flyover through cold milling and recycling process
M/o Hort. works at different roads and flyovers under HSD-West, PWD, New Delhi during 2023-24 (SH- Providing and Planting of different species of Trees, Shrubs and Ground Cover plants under Elevated Road and Flyovers etc.)
Provision of LED flood lights for illumination under flyover at (1) Rajouri garden Flyover, (2) Tilak Nagar flyover (3) Mayapuri flyover under West Zone.
Strengthening of Ring Road from Prembari Pull to Azadpur Flyover including recarpeting of wearing course of Shalimar Bagh Elevated Road
Corridor Improvement of Barapullah Elevated road and ramps of Phase I and II from Ring Road Sarai Kale Khan to AIIMS interchange West Kidwai Nagar SH Detailed road safety audit stage 6 as per IRC for Elevated Corridor on Piers
Construction of Flyover at Nand Nagri and Gagan Cinema Junction of Mangal Paney Marg including Elevated Corridor Footpath Road Work and Road Signages Electrical Works Drainage Rain Water Harvesting and Allied works on EPC mode
Maintenance and Payment of electrical consumption charges of street lighting on PWD North West Roads under NWED (SH Installation of Flood Light Fittings at Below Elevated Corridor Flyover Pillars from Mangolpuri to Rani Bagh Police Station)
Repair and Rehabilitation of Bridges and Flyover. SH Examination analysis and Testing of bearings and expansion joints of Gokulpuri and Karampura flyover Delhi
Upgradation and Development of 1 Nos. at Grade Junction to Grade Separator Underpass Flyover structure of Jaipur Rajasthan 200 Feet Bypass Junction project at Km. 273.600 (Delhi Jaipur Ajmer Expressway) in Rajasthan on EPC mode
Additional lighting arrangement in parks of Mahipalpur fly over near IGI airport under NGZ-Additional lighting arrangement in parks of Mahipalpur fly over near IGI airport under NGZ
A/R and M/O to various roads under North East (B and R) Maintenance Division dg 2023-24. (SH-Anti carbonation painting work on concrete structure of 02 Nos Flyovers (Loni Flyover and Gokalpuri Flyover) and painting Kerb stone, Grill .....
Installation of speed calming measures (table top) below Wazirabad Flyover and approaches of signature bridge and repairing of damaged footpath and toe wall below Wazirabad Flyover and providing/fixing SFRC Railing under Sub Division-1.
Conducting noise and vibration assessment study for Metro Lines 2A 2B and 7 of Mumbai Metro Elevated Corridor Phase stage 1
Construction of Horticulture Sub Division office under Gokalpuri Flyover, Delhi Near PWD Sub Division M-2132).
A/R and M/O various roads under PWD Division NWR-2 during 2022-23 ( SH- Repair of settled down Portion and patch work at ORR-26 at West Enclave and other places at Service Road, Flyover and Elevated Corridor under Sub Division NWR-25.)
CS for AE for Cons. of 6 Lane Elevated corridor from 612.582 to KM 617.540 including cons. of dedicated flyover towards Kolhapur City on NH 48 in Flood Affected Zone of Kolhapur (Descoped work of Kagal Satara PKG1). 2nd level Ramp(0.000-1.263) in MH
Provision of Cable laying in kutub minar park Mahipalpur fly over under NGZ
Upgradation of service lane lightning from Shyamlal Collage to Shahdara flyover under PWD Sub Division-3/M2533
Renovation/Repair of portion of office of Executive Engineer (Project),Karol Bagh Zone, Under Zakhira Flyover, Delhi
AR and MO to Rohini Court, Rohini, Delhi, Dg. 2025-26 SH Repair and Renovation of Executive Engineer (Civil) Office, Judiciary Civil Division-4, J.L.N. Stadium, Barapullah Elevated Road, New Delhi 110003
Misc. civil repair works at EVM warehouse, under flyover Loni road, Delhi.
Rehabilitation and strengthening of Nehru Nagar Flyover (ROB) near Ashram on Ring Road, New Delhi
Repair and Rehabilitation of Mayapuri Flyover Delhi. (SH Repair of Spalled and Honeycomb Concrete, Replacement of Expansion Joints and Bearing).
Construction of 6-lane Grade Separator at km.36.530 with LVUP at km. 36.894 including Approaches to Grade separator-LVUP from km.35.840-km.37.240 in Barhi-Hazaribagh Section(Hazaribagh Bypass) of the NH-33 in Jharkhand on EPC mode
Construction of SPS for Sub Division office Civil M 2211 and Electrical M 2534 under Akshardham Flyover Delhi Civil and Electrical Work
Printing of Handbook on Rehabilitation works of Flyovers and Underpasses
M/O Completed Scheme under Flyover Nazul A/C-II SH. M/O Dwarka Flyover and Connected Road (Chainage 0 to 2150 Mtrs.) Providing and Fixing M.S Grill as Anti Glaring Screen and Road safety Measures on Dwarka Flyover
Construction of Elevated Corridor at Kherwara Town on Udaipur Ratanpur Shamlaji Section of NH-48 in Udaipur District in the State of Rajasthan on EPC mode.
M/o Hort. Work at Hari Nagar, Subhash Nagar, Rajouri Garden, Tilak Nagar, Janakpuri, Vikaspuri and Lajwanti Flyover, under HSD West, HD North, PWD, Delhi During 2022-23. (SH- Comprehensive Maintenance of Roads and flyovers.
M/o Hort. work at Hari Nagar, Subhash Nagar, Rajouri Garden, Tilak Nagar, Janakpuri, Vikaspuri and Lajwanti flyover under HSD-West, HD-North, PWD, New Delhi During 2021-22. (SH- Comprehensive Maintenance of Roads and Flyovers.)
M/o Hort. work at Hari Nagar, Subhash Nagar, Rajouri Garden, Tilak Nagar, Janakpuri, Vikaspuri and Lajwanti flyover under HSD-West, HD-North, PWD, New Delhi During 2021-22. (SH- Comprehensive Maintenance of Roads and Flyovers.)
Consultancy Services for Preparation of Detailed Project Report (DPR) for elevated corridor for connectivity from AIIMS to Mahipalpur Bypass project with further extension to Gurgaon- Faridabad Road.
Construction of 4 Lane Elevated corridor from near Madiaon to IIM Crossing (Km 486.285 to Km 488.231) on Lucknow-Sitapur Section of NH-24 on EPC Mode
Consultancy for Identification and Design of Spaces under Flyovers in Delhi.
Repair and Rehabilitation of Hanuman Setu Flyover Delhi. (SH Repair of Spalled and Honeycomb Concrete, Replacement of Expansion joints and Bearing)
Repair and Rehabilitation of Vikash Marg Flyover and Road No. 57 Delhi. SHRepair of Spalled and Honeycomb Concrete, RCC Jacketing of Piers, Carbon Fibre wrapping of Pier Cap, Replacement of Expansion joint, Repair of Bearing Pedestal and Maintenance
Repair and Rehabilitation of Flyovers SH Repair of edge beam and providing and fixing new crash barrier at Bhism Pitama Marg Flyover and replacement of expansion joints at Bridge over Barapullah Nallah Near Nizamudin Railway Station, Delhi
Const. of 4lane elevated corridor including approaches from Old Pune Naka to Boramani Naka on NH65 in Solapur City on HAM in Maharashtra (Km 0.050 to Km 9.710)
Consultancy services for feasibility study and preparation of DPR for construction of proposed elevated corridor at MB Road from Sangam Vihar to Maa Anadmayee Marg and Pulprahaladpur to Badarpur
AR AND MO TO VARIOUS ROADS PWD DIVISION NW R1 DG 2022 23 SH IMPROVEMENT OF RIDING QUALITY OF RING ROAD FROM AZADPUR FLYOVER TO PREMBARI UNDERPASS INCLUDING SHALIMAR BAGH ELEVATED ROAD UNDER SUB DIVISION NW R14
Strengthening of Road No. 56 i.c Service Road from Gazipur Grade Separator to Apsara Border and its subsequent maintenance for three years.
MOEI, Pump, Lifts of Subway, Under Deck and FOB on Delhi PWD Roads under PWD Electrical Division South during 2021-22 (SH- Routine Maintenance E and M Services at FOB, Subways and under deck of flyovers.)
MOEI, Pump, Lifts of Subway, Under Deck and FOB on Delhi PWD Roads under PWD Electrical Division South during 2019-20 (SH- Routine Maintenance E and M Services at FOB, Subways and under deck of flyovers.)