Loading…
Loading…
7,782 results • Best match
Artistic Painting to Kothaguda-Kondapur Flyover Pillars and RE Walls in Serilingampmally Circle-49, Slp Zone, CMC (Item No.2) (2nd call)
Re-carpeting and repair of UER-1(80M ROWroad) starting from Flyover upto WesternYamuna Canal under jurisdiction of NPD-4, Narela zone.
Laying of Table Drain at Kamineni Flyover (near SBI) in Ward No.46-GSI of Nagole Circle-11, LB Nagar Zone, MMC.
RESTORATION OF ASPHALTUM ROAD FROM GARDENREACH FLYOVER UPTO RAJA SANTOSH ROY ROAD JUNCTION AT 34 DIAMOND HARBOUR ROAD IN WARD NO 79.
Repair of existing street light network of 80mtr RoW UER-I from NH-I to western Yamuna canal (except Narela- bawana Flyover).
NIT No. 40/EE(R-III)/2021-22
M o various colonies under Nazul Account II Dwarka Zone
M o various colonies under Nazul Account II Dwarka Zone
SUPPLY INSTALLATION AND COMMISSIONING OF CCTV SURVEILLANCE SYSTEM
NIT No.15/EE(R-III)/2020-21
Deep Cleaning
Day to Day cleaning and annual maintenance of twin bio-toilet at site specialized Work.
Installation of Construction of Water Fall at Santhoshnagar X Road, behind Flyoverin Santhoshnagar, Charminar Zone, UBD GHMC
Maintenance Repairs Supply Delivery and erection of Submersible Pump Set and HDPE Pipe Line repairs Work at L Shape Park, KPHB Colony Road No 1 15Th Phase OS Park (Kethlapur) JNTU Flyover Bridge Garden GYM Theme Park KPHB Colony 4th Phase Park-2, 3 and 4, 15th Phase OS Park (Kethlapur) Ideal Lake Garden in circle -23 Moosapet Kukatpally Zone during the year 2025-26.
Maintenance of Central median opp. Mahaveer Hospital greenery at road side view at Mahaveer Hospital and Masab Tank Bund Green Curtain at Mehdipatnam and Ahmed nagar side view,Mahaveer Stupam TI, green Curtain, Projections on Masab Tank Flyover and pots at TI Scrap Sculputure,Nice hospital green curtain Masab Tank Circle-12 Khairtabad Zone .UBD,GHMC for a period of 6 Months during 2024-25
Submersible Pumpset Repairs and Maintenance material and Laying & Jointing HDPE Pipe Line work at:- Industrial Park Motor-I, Industrial Park Motor-II, SRT 961 Park, Keshav Nagar Park, Sacred Garden, Sai Baba Park Sanath Nagar, KLN Yadav Park ... Thalli Flyover Fountain, ...
Construction of (9No) of public Toilets in various places of Chandrayangutta circle-8 (Dhobhighat, Kanchanbagh near Midhani Depot, Opp. CRPF main Gate Opp. On Srishylam High way, Near Substation on Srishylam road, Barkas Market, Ghouse Nagar ... Falaknuma flyover (station ...
2026-HOR01-CB-197 Maintenance of Existing both side pockets from Dutt Island to Teluguthalli flyover(675 sqmt) and Centrla median and side pockets from WNS to Raghavendra swamy temple jn.(1550 sqmt)including sardar vallabhbhai patel island and AU North campus side pockets from Maddilapalem to III Town PS (0.45 Kms) for a period of 09 months from 01.06.2026 to 28-02-2027
Rate contract for carrying out Final Location Survey (Geotechnical studies, Design, Preparation of drawings) and other preliminary activities for preparation of DPR, Land Acquisition, EPC tender documents in connection with upcoming survey work for ... Doubling/Multi-tracking, flyover etc. ...
Estimate of S&T Work for Rehabilitation and Up-Gradation to 4 lane configuration & strengthening of Thanpuri to Paror section from km.85.135 to km 100.840(Design Length 16.275km) of NH-20(New NH-154) of Pathankot-Mandi section under NH(O) in HP on ... proposed flyover cum ...
Manufacturing, supply, delivery, Lowering, laying, jointing, testing and commissioning of 600mm and 450 mm dia MS line from Big Bazar to Vishal Readymade garments(P.No. DP5 to DP6) existing on 1200mm dia MS gravity main of KDWSP Phase-I for ... Nalgonda-Owaisi Flyover at ...
2026-HOR01-CB-197 Maintenance of Existing both side pockets from Dutt Island to Teluguthalli flyover(675 sqmt) and Centrla median and side pockets from WNS to Raghavendra swamy temple jn.(1550 sqmt)including sardar vallabhbhai patel island and AU North campus side pockets from Maddilapalem to III Town PS (0.45 Kms) for a period of 09 months from 01.06.2026 to 28-02-2027
Monsoon Action Plan-2026 Removal and Conveyance of Wet Silt from Storm Water Drains in Division No.07 at various places i.e., Naaz Centre to East paris church towards GT Road, NTR Statue to Manipuram Flyover and Baaya ENT to Bus Stand Opp Bus Stand Road (Kotha road) and Pothurivari thota 3rd and 4th cross road 3rd line to 6th line Under AE-9 Section LLR
Monsoon Action Plan-2026 Removal and Conveyance of Wet Silt from Storm Water Drains in Division No.07 at various places i.e., Naaz Centre to East paris church towards GT Road, NTR Statue to Manipuram Flyover and Baaya ENT to Bus Stand Opp Bus Stand Road (Kotha road) and Pothurivari thota 3rd and 4th cross road 3rd line to 6th line Under AE-9 Section LLR
The Work for Shifting of 33 KV, 11 KV and LT line in Phase-1 from Pillar No-P-40 to Pillar No-P-32 for Construction of proposed New Fly Over under the area of UEDD-VIII Varanasi under EE, UECD-II in Business Plan-2019-20 on Turn-Key Basis
Request for Proposal for selection of consultant for providing Project Management Consultancy services for construction of Flyover at Mico Circle in Nashik Maharashtra.
M/o Hort. Work at MCD area under Rani Jhasi Flyover , Under Hort. Sub-Division Project, HD-East, PWD, Delhi, Dg 2023-24.
REPAIRING OF ROAD SURFACE AT M.G. ROAD AND STRAND ROAD UP TO UNDER BRABOURNE ROAD FLYOVER IN WARD NO.-42 UNDER BR.-V
Providing, laying and jointing 200mm dia. D.I. and M.S. Rising Main from Sump near Zakhira Flyover to Inderlok SPS under ACE(M)-5.
Cleaning, washing and single coat painting of parapet wall inner and top surface and railing of New Khiddirpur Flyover the year 2024-25.
Operation and Maintenance of Traffic Signaling system along with Solar operated Blinkers at Garden Reach Flyover for a period of 01 (One) Year.
Cleaning, Painting and Replacement of damaged ornamental grill at devider of Sodepur road from Madhyamgram chowmatha to starting of Flyover under Madhyamgram Municipality.
IMPROVEMENT OF LIGHTING ARRANGEMENT BY GLOW SIGN BOARD UNDER MAA FLYOVER AT 1NO TOPSIA ROAD SOUTH IN WARD NO.59 UNDER BR-VII.
REPAIRING OF MINI MAST LIGHT IN FRONT OF BENGAL ROWING CLUB CROSSING AND STREET LIGHT ARRANGEMENT AROUND LAKE GARDENS FLYOVER UNDER BR-X
Unipole Cluster No.14, Starting Near Fire Station Moti Nagar to Near Zakhira Roundabout FTC Moti Nagar to Zakhira Flyover, Karol Bagh Zone
Priming and Painting of Parapet wall and railing of AJC Bose Road Flyover including left turning off ramp at Beck Bagan-East Bound
Road marking with Hot applied thermoplastic compound on MAR surface on both directions from Pechar More to Haldiram Flyover in New Town, Kolkata.
Deployment of environment assistant for cleaning and sweeping, scavenging of UER-I flyover starting from Raja Harish Chander to Bharat Mata School, Narela.
Comprehensive Maintenance and Watch and Ward of Various Type LED Lights, Poles, Panels and its Accessories of Barapullah Flyover and IP Park Stretch
Temporary lighting arrangement for the decoration of all the rotary on MAR IIII and 2 nos flyover during the festive season 30 days
Installation of Street Light from Zinzira Bazar to Bata Crossing on BBT Road under Samprity Flyover in the district of South 24 Parganas
Road marking with Hot applied thermoplastic compound on MAR surface on both directions from Pechar More to Haldiram Flyover in New Town, Kolkata
Construction of Service Road Work at 04 Lane Flyover at Etah Chungi Chauraha on Kanpur-Ghaziabad Marg (G.T. Road) in District Aligarh (U.P.)
Repair and raising of boundary wall of green belt along with 80mtr. Road, Narela (NarelaBawana Flyover to G.T. Road and Opposite Singhola Village)
Trench Cutting for Physical verification of Underground Utility services related to the proposed construcation of Manicktala to shyambazar Flyover during the year 2019_2020
Laying of Rcc Cover Slab for the existing drain Vannan Koil in Periyanickenpalayam Town Panchayat Flyover at KM363/478-364/482.5-364/726.5RHS
Operation and Maintenance of Traffic Signaling System along with solar operated Blinkers at Garden Reach Flyover for a period of 01 (One) Year.
Cleaning, washing and single coat painting of parapet wall inner and top surface and railing of Gariahat Flyover during the year 2024-25.