Loading…
Loading…
670 results • Best match
Collection of Parking fees from Two Wheeler Parking area below Flyover adjacent to Axis Mall in AA-I, in New Town, Kolkata
Restoring of power supply arrangment newly erected loop box in existing pole on Axis Mall Flyover in New Town Kolkata under WBHIDCO
Strengthening of Service main feeders and arrangement of parallel WBSEDCLs supply source for 2(two) service feeders under NDITA Flyover under NDITA.
Cleaning, washing and single coat painting of parapet wall (inner and top surface) and railing of AJC Bose Road Flyover- West Bound
Painting of 10 Mtr. Long steel tubular Pole and Feeder Pillar Boxes at A.J.C. Bose Road Flyover under Hooghly River Bridge Commissioners.
Emergency repairing of the existing old HPSV Flood light fittings at the underdeck of A.J.C Bose Road flyover there on under HRBC.
Maintenance of Garden Reach Flyover (Connecting the Garden Reach Area and Majerhat In the Port area of South Kolkata) and Doighat bridge.
Improvement of depressed road surface at Technopolish Metro pier median and Chingrighata Flyover Metro pier Down area at Sector-V, under NDITA
Repairing and Servicing of Street light along with Pole and Feeder Pillar at ROB Pachbaga Flyover Bridge in the dist of Bankura.
Cleaning the carriageways and rain water disposal system of A.J.C. Bose Road Flyover for the year 2026-27 only Beck Bagan carriageway.
RESTORATION OF ASPHALTUM ROAD FROM GARDENREACH FLYOVER UPTO RAJA SANTOSH ROY ROAD JUNCTION AT 34 DIAMOND HARBOUR ROAD IN WARD NO 79.
SUPPLY INSTALLATION AND COMMISSIONING OF CCTV SURVEILLANCE SYSTEM
REPAIRING OF ROAD SURFACE AT M.G. ROAD AND STRAND ROAD UP TO UNDER BRABOURNE ROAD FLYOVER IN WARD NO.-42 UNDER BR.-V
Cleaning, washing and single coat painting of parapet wall inner and top surface and railing of New Khiddirpur Flyover the year 2024-25.
Operation and Maintenance of Traffic Signaling system along with Solar operated Blinkers at Garden Reach Flyover for a period of 01 (One) Year.
Cleaning, Painting and Replacement of damaged ornamental grill at devider of Sodepur road from Madhyamgram chowmatha to starting of Flyover under Madhyamgram Municipality.
IMPROVEMENT OF LIGHTING ARRANGEMENT BY GLOW SIGN BOARD UNDER MAA FLYOVER AT 1NO TOPSIA ROAD SOUTH IN WARD NO.59 UNDER BR-VII.
REPAIRING OF MINI MAST LIGHT IN FRONT OF BENGAL ROWING CLUB CROSSING AND STREET LIGHT ARRANGEMENT AROUND LAKE GARDENS FLYOVER UNDER BR-X
Priming and Painting of Parapet wall and railing of AJC Bose Road Flyover including left turning off ramp at Beck Bagan-East Bound
Road marking with Hot applied thermoplastic compound on MAR surface on both directions from Pechar More to Haldiram Flyover in New Town, Kolkata.
Temporary lighting arrangement for the decoration of all the rotary on MAR IIII and 2 nos flyover during the festive season 30 days
Installation of Street Light from Zinzira Bazar to Bata Crossing on BBT Road under Samprity Flyover in the district of South 24 Parganas
Road marking with Hot applied thermoplastic compound on MAR surface on both directions from Pechar More to Haldiram Flyover in New Town, Kolkata
Trench Cutting for Physical verification of Underground Utility services related to the proposed construcation of Manicktala to shyambazar Flyover during the year 2019_2020
Operation and Maintenance of Traffic Signaling System along with solar operated Blinkers at Garden Reach Flyover for a period of 01 (One) Year.
Cleaning, washing and single coat painting of parapet wall inner and top surface and railing of Gariahat Flyover during the year 2024-25.
Maintenance of Arboriculture underneath of flyover in between Axis mall and Clock Tower at Action Area -I New Town Kolkata for 02 Years).
Daily maintenance of arboriculture from Westin to Finance Centre below Metro Flyover in New Town, Kolkata. Pillar No 607 to 633 12 months
Consultancy Services for preparation of Project Report regarding Bridge Management,Inventory,Inspection and Mtc using MBIU for Bridges,Flyovers,ROB(as per IRC SP 35,IRC SP 40) in 3 zones in WB under PWD and PWRD.Package1(SZ, PWRD and PWD) (2nd call)
Installation of iron fencing at the southern slope of Taratala Flyover up to Sil Thakurbari Lane under Alipore Division during the year 2025 2026
Cleaning, washing and single coat painting of parapet wall inner and top surface and railing of Park Street Flyover during the year 2024-25.
Providing, fitting and fixing of MS rectangular hollow based and designed M.S. Grill at Wipro Crossing below Nabadiganta Flyover at Sector-V, under NDITA.
Repairing of damaged worn-out Bituminous surface from Nicco Park to chingrihata Flyover of saltlake bypass (Biswa Bangla Sarani), in Sector-V, under NDITA.
Improvement of bituminous road surface adjacent approch of Wipro flyover at Bihar warrior side of Salt Lake By-pass at Sector-V under NDITA.
CONSTRUCTION OF PAY AND USE TOILET ALONGWITH LANDSCAPING WORK INFRONT OF INDIAN MUSIUM UNDER PARK STREET FLYOVER, KOLKATA IN WARD NO 63, BOROUGH-VII
WASHING and PAINTING OF VERTICAL KERB AT A.J.C.BOSE ROAD (EASTERN FLANK) FROM JN. OF PARK STREET TO SEALDAH FLYOVER UNDER BR- V and VI
WASHING and PAINTING OF VERTICAL KERB AT A.J.C.BOSE ROAD (WESTERN FLANK) FROM JN. OF PARK STREET TO SEALDAH FLYOVER UNDER BR- V and VI
Special Repair and Rehabilitation work of Dunlop Right Turn Flyover under Kolkata North Division in the district of North 24 Parganas, Project Id PD222353157S000
Consultancy Services for preparation of Project Report regarding Bridge Management,Inventory,Inspection and Mtc using MBIU for Bridges,Flyovers,ROB(as per IRC SP 35,IRC SP 40) in 3 zones in WB under PWD and PWRD.Package 3 (NZ, PWRD and PWD)(2nd call)
Consultancy Services for preparation of Project Report regarding Bridge Management,Inventory,Inspection and Mtc using MBIU for Bridges,Flyovers,ROB(as per IRC SP 35,IRC SP 40) in 3 zones in WB under PWD and PWRD.Package 2 (WZ, PWRD and PWD) (2nd Cal)
P.Way Maintenance work at HWH Passenger and Non-Passenger Yard in the jurisdiction of SSE(P.Way)HWH under AEN/Track/HWH. (In between Jurisdiction HWH - BLY Main - Up, DN & REV ( 0/0-2/0 ) , HWH - BLY HBC - UP HBC & DN HBC ( 0/0-2/0 ) , HWH-SRC- UP, ... Goods Flyover )
Cleaning the carriageways and rain water disposal system of A.J.C. Bose Road Flyover for the year 2024-25 including Beck Bagan Ramp - East Bound carriageway
Electrical Wiring and allied works in connection with Permanent Structure at EJC Yard for rehabilitation of 82 Nos. family beneath Garden Reach Flyover of KMDA.
Improving the illumination level with power saving LED street light luminairs by the replacement of existing old conventional HPSV light fittings--- Gariahat Flyover, under HRBC
Improving the illumination level with power saving LED street light luminairs by the replacement of existing old conventional HPSV light fittings--- Nagerbazar Flyover, under HRBC.
Maintenance including daily ON and OFF operation of street light installation from Kamalgazi flyover end to Padmapukur on Southern Bypass (Both side of Adi Ganga)
Cleaning the carriageways and rain water disposal system of A.J.C. Bose Road Flyover for the year 2023-24 including Beck Bagan Ramp - East Bound carriageway
Cleaning the carriageways and rain water disposal system of A.J.C. Bose Road Flyover for the year 2025-26 including Beck Bagan Ramp - East Bound carriageway
Improving the illumination level with power saving LED street light luminairs by the replacement of existing old conventional HPSV light fittings--- Kidderpur Flyover, under HRBC
Cleaning the carriageways and rain water disposal system of A.J.C. Bose Road Flyover for the year 2020-21 including Beck Bagan Ramp - East Bound carriageway