Loading…
Loading…
671 results • Best match
Punched Tape Concertina Coils - PTCC (V2) (Q3)
Automotive Vehicles - Pneumatic Tyres for Commercial Vehicles - Diagonal and Radial Ply as per IS 15636 (Q2)
Hiring of Boats - 18 Nos EFCBs with boatman per boat with POL and 03 Nos CBs with boatman per boat; Less than 5 years; Without Air-Conditioning; 15-20; 1000; HORSE POWER; Wood; Lifebuoys; Service Provider
KMS READING SENSOR WIRE, ENGINE OIL FILTER TVS APACHE, CHAIN SPROCKET SET, SPARK PLUG, BRAKE SHOE REAR, DISC PAD REAR, DISC PAD FRONT, ENGINE OIL FILTER ROYAL ENFIELD 350CC, ENGINE OIL FILTER BOLERO BS-IV, ENGINE OIL FILTER BOLERO BS-VI, FUEL FILTER BOLERO BS-VI, L.T WIRE 4MM, FOG LIGHT BULB 12V, REXINE BLACK, REXINE WHITE, IRON CUTTER BLADE, WELDING ROD, DOUBLE POINT SWITCH 12V, PUSH PULL SWITCH SINGLE POINT, HEAD LIGHT BULB 65 W 12V, INSULATION TAPE ROLE VEHICLE, ANABOND TUBE 100GM, TYRE PUNCHER SOLUTION TUBE
DISPO VAN 5 ML, DISPO VAN 3 ML, MICROPORE 2 INCH, BANDAGE 10 CM, COTTON 500 GM, ECG GELLY 250 ML, ADHESIVE TAPE 10 CM, SPRIT 1000ML, HYDROGEN PEROXIDE 1000 ML, EDTA TUBE, CREAPE BANDAGE 10 CM FLEMINGO, ECG ROLL 6208 CARDIART, TOTAL PROTEIN 5 INTO 50 ML, BILIRUBIN KIT 4 INTO 60 ML, URIC ACID 5 INTO 20 ML, TAB KETORAL DT, TROP T KIT, TAB PETRIL MD 0 POINT 25, CAP SINAREST VAPOCAP, ZYTEE LOTION, OINT BETNOVATE GM, HEXIDINE MOUTH WASH 80 ML, BETADINE GARGLE MINT 50 ML, TAB OROFER XT, CAP D RISE 60 K, TAB ME OD
TAB GALVUS MET, TAB ONDEM MD 4 MG, TAB GLISEN PM, INJ CYCLOPAM, INJ TRAMADOL, CANDID POWDER 60 GM, CAP BECOSULE Z, TAB DIGENE, TAB DROTIN M, ED CANDIBIOTIC, TAB LASIX, TAB OMNACORTIL 10 MG, LIQ CALADRYL 100 ML, OTRIVIN NASAL DROPS, LIQ LIV 52 DS, SYP ZIFI 100, SYP CALPOL 250 MG, SYP COMBIFLAM 60 ML, SYP POWERGYL 60 ML, SYP MEFTAL SPAS 60 ML, STREPSIL LOZENGES, ED NEPAFENAC, TAB HOSIL L
Construction of foothpath by Paver Block along Salkia School Road (Eastern side) from Salkia A.S.School to approach to flyover and (Western side) from jn. Of Sri Aurobindo Road to jn. Of Dr. Abani Dutta Road under ward no-11,12 and 13. (2nd Call)
Rights for display hoardings for seven years on BOT (Build Operate and Transfer) basis of 20(Twenty) Gantry/Unipole 30 sqm each and 700 light pole kiosk,6 square ft each from Southern Bypass after Southern approach of Kamalgazi Flyover 0.00 km .....
Day to day sweeping the main carriageway, service road and footpath and removal and disposal of waste materials from 3.15-5.15 kmp. from both side of KNI Avenue and both flank of VIP Road Flyover under Baguihati Highway SubDivision of BHD-I
Annual Clearing and removing year 2024-25 water hyacinth from U/s and D/s of Nashibpur Bridge an Chandannagar Flyover on North saraswati River in between 20.12 Km and 20.52 Km and 21.91 km and 22.31 km within Chandannagar Municipal Corporation
Sl No 3 Shifting Relaying of pipeline in new alignment of 600mm dia and other pipes for distribution line due to construction of Jhankar more Flyover by PWD NBC at Zone II of Siliguri Comprehensive WSS under Siliguri WS Divn PHE Dte
WBSO ENGG-Construction of new A Site Retail Outlet with facilities like Sales Building Canopy, Paver Block Driveway, Inst of 3 Nos 20 Kl tanks and MPD and other allied Old SH7 (at Telipukur More Flyover), while moving from Kolkata to Durgapur, WBSO
Day to day sweeping the main carriageway and removal disposal of waste materials from both flank of VIP Flyover from 2.95-5.15 kmp. of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No-I for the period of one year.
Improvement Bituminous road With Mastic Asphalt over Bituminous Macadam i)s/f Chittaranjan Das Flyover more to Nagen Roy store ( rail crossing) at Matangini 1 and 2 ii) and iii) Bhagat Mahato house to Hanuman mandir...at Majdoor coloney under w-28
Day to day sweeping the main carriageway and removal disposal of waste materials from both flank of VIP Flyover from 2.95 5.15 kmp. of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division NoI for the period of one year
Day to day sweeping the main carriageway and removal disposal of waste materials from both flank of VIP Flyover from 2.95-5.15 kmp. of KNI Avenue under Baguiati Highway Sub Division of Barasat Highway Division No-I for the period of one
K.N.I. Avenue (V.I.P Road) from 0.00 kmp. To 8.05 kmp. Painting of Road side kerb, Seperator, brick wall, steel fencing, Flyover Crash barrier (6 faces including out side) and repairing of minor damages under Barasat Highway Division No.-I in the di
Construction of drain (i) s/f rasaraj sweet shop near mahabirthan rail gate to end of flyover (s.f road connecting) (ii) s/f patodia printing press to mundra agarbatti both side at tula goli and (iii) s/f shree salasar food mart .. W-8
Day to day maintenance work cleaning rubbish dust and Weeds and removing choke age of gully pit etc at PWD Road Sitaramdas Omkarnath Sarani 0 00 Km to 0 480 Km D P Sashmal Ave R N Tagore Road Bally Bridge and Dunlop Right Turn Flyover Including
Laying of 900 mm and 300 mm dia NP3 Pipe and other ancillary works for shifting of the Existing Under Ground Drainage from Kamalgazi More to Flyover adjacent to the work site of Receiving Pit for Jack Pushing at W 27 under AMRUT within RSM 2nd Call
Urgent surfacing work with premixed carpet and seal coat in stretches for both side service road of Taratala Flyover Metro pier P 264 to LP 241 Ch 6 400 to 7 140 Km and main road upto Behala PS at Eastern lane side Metro pier LP 241 to P 217 Ch 7 140