Provisions included in this work are earthwork, PCC, RR, Solid block, RCC, Plastering, Painting, S.S for hand rail, interlocking tile work, flooring, steel work, finishing works etc.
This estimate includes items for dismantling toilet floor tile and providing new floor tile ,providing WC and its utilites and provisions for rectifing the sheet roof leakage .
PWD WORKS
Conclusion of contract for supply of Atta Whole Meat, Dalia, Suji and Maida (Flour) at Trivandrum for the period 01 Apr 2021 to 31 Mar 2022
provisions such as pot hole filling with 36 mm metal, leveling undulation with 12 mm metal, bit close grtaded chipping carpet surface etc. are included in the estimate
Provisions are included in the estimate are earthwork Plain cement concrete 1 3 6 for foundation PCC M15 for drain side wall PCC M15 for wearing coat etc
Construction of 400 Meter 8 lane track with Elevens football natural turf, including the required sprinkler system, electrical / plumbing works, firefighting provisions, peripheral road and other ancillary works.
Provisions given for supplying and fixing WC pan and wash baisen , pvc septic tank and also suppying pvc pipe ,flooring and wall tiles is provided in this toilet .
The provisions provided in this estimate are earthwork excavation, DR masonry, brick bat filling around the DR, Cover slab for soakpit, construction of manhole, connecting pipeline work etc
estimate includes provision for dismantling existing tiled roof and provisions for new truss roof painting of the existing twin building plumbing work provision for kitchen slab false ceiling
provisions included in the estimate are providing shelves repairs to gents ladies toilet providing sheet roof at existing tile roof damaged portion typist room and other related works
Provisions are given for dismantling the exsisting old tiles and laying new tiles in the bathroom, providing curtains, partitions, painting, and interlocking back side of the office etc.
Provisions for WMM, BM and BC with trafic safety arragements, reconstruction and construction of culverts and drains with covering slab, irish drain, etc are inluded in this estimate
Provisions included in this estimate are Steel work in built up tubular sections,roofing with Galvalume sheet,rain gutter pipe,clamp,110mm PVC for rain water pipe etc
Provisions are included for yard development work withpaving interlock on front area and ceramic tile on parking area , necessary cupboard works and LS provision of electrical works etc
Provisions included in the estimate are conduct topographical survey, cross sectional details , Hydraulic velocity of thode and soil investigation detais of 4 nos of boreholes ateach sides bridges
The provisions provided in the estimate are dismantiling earth work excavation , PCC for foundation, RCC M20 for side wall of drain withcover slab and reinforcement for RCC work
The provisions included in the estimate are providing concrete road from the entrance and up to the office porch area. Also rectifying the plumbing works for sump tank.
This estimate includes Ramps for all buildings one in each floor and one in common necessary plumbing and water supply items etc Also provisions given for urgent main
This Estimate Includes Dismantling of Roof tiles and ridge, Resetting the same, woodwork in Doors and Windows, Urgent ceiling provisions, Bathroom renovation, Urgent painting work, Tree cutting, etc.
The provisions included in the estimate are removal of accumulated earth from the existing drain and culverts, Removing unserviceable soil and waste from side berms,Construction of u
In this estimate the provisions for Scarifying GSB WMM work Filling up potholes Primer coat tack coat 40 mm close graded tarring road safety works Irish drain works
provisions for retaining wall construction includes earth work excavation rr masonry for foundation rcc belt random rubble for retaining wall solid block masonry for compound wall plastering painting
Provisions provided in the estimate are filling up pot holes with 36mm and 12 mm metal, Close graded premix chipping carpet, removal of excess soil from the shoulder
provisions included in this estimate are Removing block ages from sewer manholes removing blocks from bath room trap water closet Taking out damaged aluminium door and repair etc
The bridge is having span of 8.4m and carriage way width of 7.3m without foot path.Theestimate for soil investigation is prepared herewith giving provisions for 4 nos.of boreholes.
This estimate includes provision for Potholes filling GSB WMM Leveling course opengraded 20mm premix Chipping carpet and providing provisions for the construction of retaining wall , concrete works etc.
Provisions included in this estimate are Total station surveying for preparation of site plan . For soil investigation 5no.s bore holes Disturbed soil sample collection conducting standared penetration Test
MP.LADS. 2019.20. Drinking water Project. Providing rider line from Ration shop jn to Kunnappallymala in ward No. XII of Muvattupuzha Municipality
PDMNA 177/23-24 Retarring works of Aayakkadu ration kadapady canal road and Ayakkaadu anganvadi canal bund road in ward- 8 -
Upma, Cornflakes, Fruit Juice, Veg Pulao, Veg Curry, Chicken Curry, Gulab Jamun, Tinned Fruit, Veg Soup, Chicken Soup, Instant Rice, Biscuit Glucose, Biscuit Cream, Biscuit Salt, Milk Chocolate, Beaten Rice, Roasted Chana, Roasted Groundnut, Protein Bar, Assorted Mixture, Drinking water
Conclusion of contract for supply of Atta Whole Meal, Dalia, Suji and Maida (Flour) at Trivandrum for the period from 01 Apr 2022 to 31 Mar 2023.
The bridge having span of 19.5m and carriage way width of 6.50m without footpath. The estimate for Soil Investigation is prepared herewith giving provisions for 6 nosof bore holes.
provisions for scrapping removing the existing paint applying primer and then painting the surface with a new colour tile work providing name board to rooms renovation of toilets etc
Provisions such as filling up pot holes using with 36 mm metal,12 mm and 6 mm metal,WMM filling for more damaged areas,GSB for tile relaying, etc..
Provisions provided are EW Scarifying GSB WMM SS RS BM BC concrete works like culvert drain Traffic safety work Survey KSEB posts and water supply pipe lines shifting etc
The estimate is prepared and herewith submitted for sanction. Provisions such as 36 mm filling up pot holes, 12 mm filling up potholes, close graded premix chipping carpet etc
Provisions for periodic grass cutting and jungle clearance are included in this estimate. Also sometimes the zoological waste due to the decayed dead bodies of animals has also occurre
Provisions provided in the estimate are filling up pot holes with 36mm and 12mm metal, close graded premix chipping carpet and removal of excess soil from the shoulder etc.
Provisions given are total station survey boring with rotary power drilling conducting SPTs recovering samples compailation of filed data conducting CBR tests Hydraulic velocity calculation river cross section etc
The provisions included in the estimate are dismantiling doors, window , demolishing RCC works and brick work ,laying mat finished vitrified floor tile,SS hand rail works,Ceiling works etc.
Provisions has been made in this estimate for demolishing existing cement concrete and tile works in the kitchen portion and layingvitrified floor tiles with epoxy grouting in joints etc
Provisions for supplying and fixing of tables with shelves, particle board partitions, painting with emulsion, vitrified tile laying in some areas, aluminum ventilator works etc included in the estimate
The provisions are roofing with GI sheet ,GI tube work,MP tile and ridge tile,rearranging mp tile roofing, and other items for maintenance are included in this estimate.
provisions such as 36 mm with filling up pot holes, WMM for fully damaged portion, prime coat, tack coat, bit close grtaded chipping carpet are included in the estimate
this estimate for Visiting room and Toilet, provisions are included for Block work, sheet roof, ceramic floor tile, plastering, painting etc. LS provision for electrical works is also provided
necessary provisions such as filling up pot holes with 36 mm metal, leveling undulation with 12 mm metal, bit close grtaded chipping carpet etc. are included in the estimate.
Provisions are included for dismantling old culvert, earth work for foundation, PCC 136, M15 abutment, M20 for bed block, slab and parapet, HYSD Earth work for foundation , 136 , M15
The provisions included in the estimate comprise PVC pipes PVC door shutters with frames door handles aldrops tower bolts engaging plumber fitter and scavenger etc and other related items
Estimate provisions are bit CC, 12mm metal6mm metal, 36mm metal, pothole filling with 36mm metal, 40mm leveling course with 36mm metal, 20mm leveling with 12mm metal and berm cutting