Loading…
Loading…
324 results • Best match
SELECTION OF TECHNICAL AGENCY FOR GPS-BASED VEHICLE TRACKING SYSTEM SERVICES
GPS Tracking System
GPS Tracking System (Q3)
GPS Tracking System (Q3)
GPS Tracking System (Q3)
GPS Tracking System (Q3) (3 (3 ))
Supply, Installation, Operation and Maintenance for 5 years of GPS and GPRS based Vehicle Tracking System for vehicles of Silchar Municipal Corporation on turnkey basis under 15th FC
Provisioning of Vehicle Tracking System (VTS) along with determination of Round-Trip Distance (RTD) and verification by Geo-database creation for Route Mapping under Service Delivery Model for Packed / Bulk LPG Trucks (IOAOD SO)
Supply of AIS 140 GPS devices includes GPS device cost, installation cost, 3 years warranty with software license fees per user per year and SIM card with 4G data package for IWT ferry vessels
GPS Tracking System Bidder Turnover (Last 3 Years) 25 Lakh (s)
GPS Tracking System (Q3) MSE Exemption for Years of Experience and Turnover
1. Supply and commissioning of GPS Tracking devices all complete including two years of AMC with necessary repairs after completion of one year warranty period following RDSOs guideline. 2. AMC of GPS devices with necessary repairs (for two years) after completion of one year warranty period following RDSOs guideline.
SITC of GPS Based Time Synchronization System in New
SITC OF IP based Master and Slave GPS Clock with GPS based NTP Server
Supply and commissioning of GPS Tracking devices all complete including of one year warranty period following RDSOs guideline.
Colour Printer as per attached technical specifications, GPS units for Vehicle Tracking system
AMC of GPS tracking with necessary repairs (for two years) after completion of one year warranty period following RDSOs guideline.
AS_VTS_EOI_01 EXPRESSION OF INTEREST AND FINANCIAL PROPOSAL FOR PROVIDING INSTALLATION AND SERVICES FOR GPS ENABLED VEHICLE TRACKING SYSTEM (VTS) ON ALL EQUIPMENTS / VEHICLES USED FOR ROAD / BRIDGE CONSTRUCTION UNDER PMGSY
Supply and commissioning of GPS Tracking devices all complete including two years of AMC with necessary repairs after completion of one year warranty period following RDSOs guideline.
Custom Bid for Services - Yearly maintenance of GPS based Fog Safe Device at RNY division for 24 months
Custom Bid for Services - Annual Maintenance contract of GPS Based FSD for a period of 1095 days 3 Years in LMG Division
Vehicle Tracking Services - 1; 0-5; Yes; 12 Months; Less than 5 Sec
Custom Bid for Services - Quarterly maintenance of GPS based Fog Safe Device at RNY division for two years Similar Category Manpower Outsourcing Services - Minimum wage
Hiring of Vehicle Tracking Services - 1-3; 0-5; Yes; 12 Months; Less than 5 Sec
RFID TAGS FIT 210, RFID TAGS FIT 400
RFID, HEAT SHRINKABLE SLEEVE, GLUE
Quadro EXE, Peoplelink Icam FHD 10 Camera, Projector Stand, Vehicle Tracking System Prototype Training Model, Airtel SIM alongwith Subscription for Prototype Model, Protector Cover for Galaxy
1.Supply and commissioning of GPS Tracking devices all complete including two years of AMC with necessary repairs after completion of one year warranty period following RDSOs guideline. 2.AMC with necessary repairs (for two years) after completion of one year warranty period following RDSOs guideline.
1.Supply and commissioning of GPS Tracking devices all complete including two years of AMC with necessary repairs after completion of one year warranty period following RDSOs guideline. 2.AMC with necessary repairs (for two years) after completion of one year warranty period following RDSOs guideline.
Blind Rivet for RFID Tags, AND RFID TAG as per GSI Standard
RFID TAGS FIT 400, RFID TAGS FIT 210, HEAT SHRINKABLE SLEEVE, GLUE
RFID TAGS FIT 400 (Q3), RFID TAGS FIT 210 (Q3)
RFID- BOLT SEAL (Q3)
LIBRARY AUTOMATION WITH RFID SYSTEM
RFID Staff Station cum Tagging Station integrated with System, Security Gate -Single Lane, Self Service Kiosk, Wireless RFID Handheld Reader, Smart Display with Attendance RFID Reader, RFID Web Based Application Integration Software, RFID Smart Card, ... Card, RFID Anti-Theft ...
GPS Tracking System (Q3) MSE Exemption for Turnover Yes | Complete Startup Exemption for Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance, Bidder Turnover, Certificate (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6724952 Dated : 25-09-2025 Bid Document 1/5 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled Yes RA Qualification Rule 50% Lowest Priced Technically Qualified Bidders Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No