Loading…
Loading…
324 results • Best match
Air frame, Antenna, Battery, camera, ELRS, GPS, Prop, STACK, Video transmiter, RC
Mark 4 6 Inch Carbon Fibre Drone Frame, RP1 V2 Elrs Receiver, Speedx2 2105.5 2650KV M5 Shaft, Set of 4 Motors, Basic Flight Controller Kit with GPS Module, V3 GPS with Compass
Vtx 2.5W with Antenna, Remote Controller, ELRS Rx, GPS Module, Li ion Cell
Air Frame, ANTENNA, Battery, camera, ELRS, GPS, prop, STACK, video transmitter, R C
2 Axis Servo, GPS M10, Ground Module, Air Module, 1 KM Optical Fiber
Stack, Air Frame, Video Transmeter, Antena, PC, Battery, ELRS, GPS, Camera, Motors, Propeller, Google
Stack, Air Frame, RC, Battery, ELRS, GPS, Motor, Propeller, Landing Gear, Spaces and Nuts
Air Frame, Antenna, Battery, Camera, ELRS, GPS, Propellers, Stack, Video transmitter, Remote Control, Goggles
Drone frame, Remote Control, Smoke Stopper, Battery 2800mAH, HD Camera Avatar, GPS with battery
VTOL UAV STING, Kit with H7 FC, M10 GPS, 9g Servos Parts, Desoldering Wire
Biometric attendance non aadhaar based device (fingerprint + RFID + PIN) with log extraction via USB/software , fingerprint templates-2000, log capacity-100000, card capacity-2000, fingerprint sensor- 500 DPI optical sensor with all accessories for EM lock, safety features, with materials cabling, conduit, fixings & all types of accessories, spare adaptor, installation, configuration, testing, user training , complete set up & commissioning. (Make- as per ESSL model K30 Pro or ZTecho , Matrix )
10 Fibre Nylon props, Quadcopter Frame, 60 amp ESC, HGLRC M100 Pro GPS, Radiomaster RP1, T-Motor Velox 1950kv, FC Goku F7 less used, GEPRC Maten 2 5 W, M100 Pro GPS, Radiomaster RP3 V2 Receivers, Antenna
Stack, Air Frame, Video Transmitter, Antenna, RC, Battery, ELRS, GPS, Camera, Motors, Propellers, Spacers and Nuts
SERVO MOTOR, BATTERY TESTER, FSC, CONNECTOR 65, CONNECTOR 35, JUMPER, GPS, BATTERY, PX4 FLY CONTROLLER, GPS BASE, PCB HOLDER, MICROSCOPE, PCB RACK L TYPE, OCB RACK I TYPE, MICRO CABLE 2 MTR, MICRO CABLE 1 MTR, DRONE NAME PLATE
DRONE FRAMES, MOTORS, ESC, FLIGHT CONTROLLER, PROPELLERS, BATTERY, GPS MODULE, RECEIVER, VTX, FPV CAMERA, ANTENNA, POWER MODULE
Long Antenna RHCP SMA, 1200VTL Low Latency FPV Camera, 5.8G 2.8W VTX, 800mW VTX, M10 GPS Module
Stack, Air Frame, Video Transmitter, RC, Battery, ELRS, GPS, Camera, Motors, Propellers, Spacers and Nuts, Payload Mechanism
Air Frame, Antenna, Battery, Camera, ELRS, GPS, Stack, RC, Digital Air Unit, Gimbal, Spacer and Nut, Propellers
STACK, AIR FRAME, VIDEO TRANSMITTER, RC, BATTERY, ELRS, GPS, CAMERA, MOTORS, PROPELLERS, SPACERS AND NUTS, PAYLOAD MECHANISM
Air Frame, Antenna, Battery, Camera, ELRS, GPS, Motors, Propellers, Remote Control, Spacer and Nuts, Stack, Video transmitter
Air Frame, ANTENNA, Battery, Camera, ELRS, Goggles, GPS, Motors, Propellers, RC, Spacer and Nuts, STACK, Video Transmitter
STACK, AIR FRAME, VIDEO TRANSMITTER, ANTENNA RHCP, RC, BATTERY, ELRS, GPS, CAMERA, MOTORS, PROPELLERS, SPACERS AND NUTS
Stack, Air Frame, Video Transmitter, Antenna RHCP, RC, Battery, ELRS, GPS, Camera, Motors, Propellers, Spacers and Nuts
Air Frame, Antenna, Battery, Camera, ELRS, Goggles, GPS, Motors, Propellers, RC, Spacer and Nuts, Stack, Video Transmitter
Facility Management Services - LumpSum Based - Library; Supply, Installation, Commissioning and Training of RFID Based Library Automation System; Consumables to be provided by service provider (inclusive in contract cost)
Stack, Air Frame, Video Transmitter, Antenna RHCP, RC, Battery, ELRS, GPS, Camera, Motors, Propetters, Spacers and Nuts, Goggle
SAFETY POSTER WITH FRAME, GPS TRACKER DEVICE, CP PLUS CAR CAMERA, 128 GB MICRO SD CARD, POWER SOCKET
Stack, Air Frame, Video Transmitter, Antenna RHCP, Battery, ELRS, GPS, Camera, Motors, Propellers, Space and Nuts, Remote Contoller
TBS Tracer micro TX FPV, Ovinic lipo battery, Run cam FPV Night eagle HD Camera, HGLRC GPS, Capacitor
Go pro HD Camera for Drone, Shaft Brushless motor for FPV, GPS module, LI-ON cell, Spunge ball
hand held gps Average Turn Over of Last 3 Years 3 Lakh (s) Experience with Gov. Required 3 Year (s) Hand Held Gps ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Type Hand Held - Built-in Antenna Yes - ... equipment GPS UNIT ...
Air Frame, Antenna, Battery, Camera, ELRS, GPS, Stack, RC, Digital Oculus, Digital Air Unit, Gimbal, Spacer and Nuts, Propellers
Stack, Air Frame, Video Transmitter, Antenna RHCP, RC, Battery, ELRS, GPS, Camera, Motor, Propeller, Landing Gear, Spaces and Nuts
Drone Frame, Motors, ESC, Flight Controller, Propellers, Battery, GPS Module, Receiver, VTX, FPV Camera, Antenna, Power Module, Remote Controller
Air Frame, Antenna, Battery, Camera, ELRS, GPS, STACK, Remote Controller, Digital Oculus, Digital Air Unit, Gimbal, Spacers and Nuts, Propellers
ONE COACH SET OF PU FOAM CUSHION MATERIAL FOR LWACCW/EOG COACHES TO DRG.NO. LWSCWAC/EOG 6-1-042 ALT-e, COL-01. CUSHIONING MATERIAL SHALL BE OF PU FOAM CONFORMING TO RDSO SPECIFICATION RDSO/2007/CG-04 REV.01 OR LATEST. NOTE 1: FIRM HAS THE OPTION FOR ... WITHOUT RFID .
hand held gps Average Turn Over of Last 3 Years 10 Lakh (s) Hand Held Gps ( 5 ) Technical Specifications Specification Specification Name Values Allowed Values GENERIC Type Hand Held - Built-in Antenna Yes - Dimensions (mm x mm x mm) 54*103*33 - Weight with Batteries (grams) 141.7 - Channels (No.) 12 - Pre-loaded Handheld Software yes yes, no Compatible Office Software yes - Slip Resistant Grip Yes - Base Map Yes - WAAS Enabled Yes - Inbuilt Electronic Compass yes - Paperless Geocaching yes yes, no Sun and Moon Information yes - Inbuilt Barometric yes - 1/4 Altimeter Facility Audio Microphone and Speaker, Recrd and Playback Option - PORT/CONNECTIVITY Bluetooth Connectivity yes - USB yes - STORAGE RAM (GB) 4 1, 2, 3, 4, 5 Micro SD Card Slot yes yes, no Expandable upto (GB) 32 - DISPLAY Display Type Transflective Colour TFT - Display Size (Diagonal) (Inches) 2 to 2.5 2 to 2.5, 2.6 to 3, 3.1 to 3.5, 3.6 to 4, 4.1 to 4.5 Display Resolution 240*320 - Touchscreen no yes, no BATTERY Type of Battery Rechargeable - Battery Chemistry Li-ion - Battery capacity (Vah) 100 - Battery Back up (Hour) (N >= 16) 25 - TRACK DETAILS Waypoints/Favorites Locations (No.) 2000 - Routes (No.) 200 - Track Log 10000 Points, 200 saved Tracks - Area Calculation Yes - VARIOUS TEST Drop/Free Fall Test Drop/Free Fall Test in unpacked, Switched Off and normal handling conditions (Height- 1 m, Total no. of falls- 2) - Vibration Test Vibration test in packed and Switched off condition (10-150 Hz, 0.15mm/2g, 10 Sweep, cycles/axes - Bump Test Bump test in packed and Switched off condition (1000 Bumps, 40 gm, in vertical position) - PERFORMANCE Processor Base Band - Operating Temperature (Degree C) 20 - 2/4 Operating Humidity (RH) (%) 95 - Accuracy 3-5 meter - Update Rate (Hz) 1 - Time taken to give first fix (Second) 1 - ACCESSORIES Standard Accessories to be supplied with the equipment etrex 30x USB Cable - Carry Case Yes - SERVICE Warranty (Year) 1 1, 3 CERTIFICATION Ingress Protection (IP Rating) IPX7 - BIS Registration under Compulsory Registration Scheme yes - BIS Registration No. and its validity na - TEST REPORT DETAILS Availability of Test Reports from Central Govt/NABL approved ILAC acredited lab to prove conformity to the specification (Test Reports are to be furnished when demanded by the buyer) Yes - Test Report no. and date (Not a part of biddable parameter) 2014/53/EU, 2011/65/E U & 13/6/2017 - Name and Address of the Lab (Not a part of biddable parameter) Garmin International - * Bold specifications are the golden parameters. Consignees and Quantity S.No. Consignee Address Quantity Delivery Days 1 Biplab Sarkar N 783331, COMMANDANT 48 BN CRPF, Dicc Complex, Gauripur, P.O- Gauripur, Distt. Dhubri(Assam), Pin-783331 5 15 Required No ePBG 3/4 Required No
Stack, Air Frame, Video Transmitter, Antenna RHCP, Battery, ELRS, GPS, Camera IR, Motors, Propellers, Spacers and Nuts, FPV Goggle, Battery Charger, RC
Projector Screen cloth, Projector Stand, AC and DC Adapter 12 V 5 Amp, GPS Gramin, Sansui LED TV 65 Inch, Wall Mount
hand held gps (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Past Performance, Bidder Turnover *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 2, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6931979 Dated : 25-11-2025 Bid Document 1/5 Number of Auto Extension count 2 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stack, Air Frame, Video Transmitter VTx, Antenna RHCO, RC Receiver, Battery, ELRC Module, GPS Module, Camera, Moters, Propellers, Spacers and Nuts, FPV Goggle
hand held gps (Q2) ( PAC Only ) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 2 Bid Number : GEM/2025/B/6452268 Dated : 27-07-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
hand held gps (Q2) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6793525 Dated : 15-10-2025 Bid Document 1/6 Number of Auto Extension count 1 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No
Stack Flight Controler, Air Frame, Video Transmitter, Antenna RHCP, RC Receiver, Battery, ELRS Module, GPS Module, Camera, Motors, Propellers, Spacers and Nuts, FPV Goggle
Air Frame, RHCP Anteena, 5000MAH Battery, 2 point 1 mm Camera, Nano ELRS, Micro GPS, 7TH INC Propeller, Stack, Video Transmeter, Pocket Remote Control, Goggles
hand held gps (Q2) ( PAC Only ) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Past Performance *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 3 Bid Number : GEM/2025/B/6687084 Dated : 15-09-2025 Bid Document 1/6 Number of Auto Extension count 1 Past Performance 10 % Bid to RA enabled No Type of Bid Two Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
hand held gps (Q2) ( PAC Only ) MSE Exemption for Years Of Experience and Turnover Yes | Complete Startup Exemption for Years Of Experience and Turnover Yes | Complete Document required from seller Experience Criteria, Bidder Turnover, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6610216 Dated : 27-08-2025 Bid Document 1/6 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
HMC 221 SPDT SWITCH, RECEIVER SUB ASSY GPS, DIODE TVS SM 14KESD33, COMP ACCE HW CPU, RES FXD CH 680 5 PERCENTAGE 1 W 200 V
X5690 frame TL69A01 Multi-Copter-Frame, Speedy Bee F405 V5 OX32 55A 30x30 Model Aircraft, Drone Connector Type A, M10 GPS Standard GHR 1.25mm 10 Pin, Drone Connector
BLDC Motors, BLDC Pusher Motor, 15 x 5 Carbon Fiber Propeller, 16 x 8 Propeller, Multi Rotor UAVs ESC, Flight Controller, GPS Module, Gimbal Camera, Airspeed Sensor Kit, Telemetry Receiver, Telemetry Radio TX and RX, Power Distribution Board 120A, RC ... FC GPS Supply, ...