Loading…
Loading…
30,240 results • Best match
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2) ()
guardrail for highways (Q2) ()
guardrail for highways (Q2) ()
guardrail for highways (Q2)
guardrail for highways (Q2)
guardrail for highways (Q2)
Road Marking at 30.00mtr wide road (ch.10.65km to 12.55) along Yamuna Expressway yea Wc-03
Annual maintenance of State Highway 1) Chadchana Kannur Siddapur Jalageri Babanagar Tikota Babaleshwar Karajol Mulwad Alamatti to NH50 Road from km 124.20 to 128.93. 144.55 to 147.08. 149.88 to 152.80 and 166.20 to 166.67 2) Bharkheda Bilagi State Highway...
Resurfacing Work on 60mtr Wide Road LHS (Ch.22.50km to 27.00km) Along Yamuna Expressway, Yea
Resurfacing Work on 60mtr Wide Road RHS (Ch.22.50km to 27.00km) Along Yamuna Expressway, Yea
Construction of balance 30mtr wide road(5 year maintenance) along Yamuna Expressway, YEIDA WC-02
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of tipper on NH.05 between Km 307.00 to 368.00
Estimate for shifting of existing 11KV HT LT line of rural feeder above the under construction of ropeway between Chandigarh Manali national highway near pandoh dam reservoir Mata Baglamukhi Temple (Bakhli) distt Mandi in (E) section Saroa Pandoh
Construction of of road from National Highway to Mohalla Lundi by way of balance Earth work in Cutting,Cross Drainage,Walling and Providing and Laying 75mm thick WBM Grade-II in Km 1st and Km 2nd RD 500 .
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of tipper on NH.05 between Km 280.00 TO 307.00
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of Tipper on NH.05 between Km 236.00 to 280.00
Consultancy Services for AE for Supervision of Rehabilitation and widening work for 2Lane with PS of Existing National Highway 122B Alignmentfrom Km 29.730 to Km 72.348 of Mahnar Bachhwara section in the State of Bihar on EPC Mode
Renewal work by BC of the road connecting NH-58, Iris Bridge to Jwalapur-Laksar-Purkazi National Highway via Bairagi Camp, Vishwa Kalyan Ashram and Matra Sadan Ashram in Haridwar city Under Kumbh Mela 2027. (Length-6.740 km)
DEVELOPMENT OF NEW A SITE RO AT VILLAGE KALLAR MOHRA FROM KM STONE NO 199 to 202 ON RAJOURI POONCH NATIONAL HIGHWAY NH 144A DIST POONCH JAMMU and KASHMIR UT UNDER JAMMU DO OF IOCL PUNJAB STATE OFFICE.
Engagement of user fee agency through e-tender at Kulhariya Fee Plaza at Design Km 39.700 for the use of four and more lane of Koilwar-Bhojpur section of National Highway number 922 in the State of Bihar
Engagement of user fee collection agency on the basis of CB through e-tender for Kumhari FP at four lanes of Raipur-Durg Section from km 281.000 to 307.600 of National Highway 6 (New NH-53) in Chhattisgarh
Development of new A site RO with facilities like Sales Building Canopy Paver block driveway and other allied civil and electrical works at location within Municipal Limits of Hardoi Not on National Highway Distt. Hardoi under Lucknow Divisional
STBR/SOPD-G/Barhampur-06/35 Construction of RCC Drain from National Highway to KK Road (Lachit Nagar) under Mukhya Mantrir Path Nabikaran Aachani(MMPNA) under SOPD-G for the year 2025-26 of Nagaon District, Barhampur LAC
Proposed Construction of WBM Road From kachade Madam to National Highway 7 at Indira Gandhi Ward, Prabhag No. 17, In Municipal Council Hinganghat, Dist Wardha In municipal Council Hinganghat (Under Nagari Dalitettar Vasti Sudhar Yojana Funds (2023-2
NABARD RIDF XXIV-WSS to Erumely-Road Restoration on National Highway NH 183 A from KM 93-860 to KM 107-170 damaged by laying distribution system in Zone I part and Zone VI of Erumely grama panchayath
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of tipper on NH.305 between Km 53.00 to 97.00
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of tipper on NH.305 between Km 0.00 to 53.00
Kodanda Rama Swamy LIS - Restoration of M.S. Pipe crossing National Highway-65 by Horizontal Directional Drilling method for Pressure main of Kodanda Rama Swamy Lift Irrigation Scheme located near Akupamula Village, Munagala Mandal of Suryapet District (2nd Call).
Repairs to Plaster Colouring Rain Water Lines Polymer Microconcrete, Flooring, Windows, Door, Miscellaneous items etc to Asst. Chief Engineer 1 an 2 Accountant Cabin Computer Room and Waiting Area National Highway PWD 5th floor Konkan Bhavan Annexe B
Installation of street light poles and electrification work at National Highway 8 to Shri. kailas Ravate Home and Nityanand Baswant Home to Madhukar Dubey Home and Various Place Ward Committee C in Vasai Virar City Municipal Corporation Area.
Performance Based Maintenance Contract PBMC for the stretches from Km 69.90 to km 84.33 of NH 766C and from km. 0.00 to km. 1.40 of NH 169A pertaining to National Highway Division Shivamogga in the state of Karnataka
Engagement of user fee collection agency on the basis of CB through etender for Kaithi Fee Plaza At Km 28.585 (existing km 28.170) for Varanasi Gorakpur section of National Highway number 29 in the State of Uttar Pradesh
Engagement of user fee collection agency on the basis of CB through for Kokpara FP at km 32.125 on Mahulia Bahragora-JH/WB Border Section of National Highway No 6 (New NH-49) in the State of Jharkhand
Advance Action for rectification of 15 Nos of accident spots by providing Road Safety Furniture in AP 06, AP 07, AP 08 packages on Nagpur to Hyderabad section of National Highway No.44 in the State of Telangana.
TILE WORK OF LINK ROAD FROM NATIONAL HIGHWAY TO RESIDENTIAL AREA NEAR HOUSE OF GHULAM HASSAN BABA,GH MOHD BHAT,MOHD ABASS HANJIWAR SINGHPORA BARAMULLA,UNDER CD-PYT FOR FY 2026-27,HALQA HW PAYEEN-A, BLOCK SINGHPORA
Construction of RCC Drain with Cover on Existing Drain And Providing And Fixing Paving Blocks Both Side of Road From H/o Mahalgave To National Highway At Prabhag No 11 Under Nagari Dalit Wasti Sudhar Yojana MC Bhandara
CONSTRUCTIO OF CC ROAD FROM BHAVANNA NIRMANA KARMIKA SAMGAN TO J.RAMBABU HOUSE RAOD AND ELEC POLE NO.105/A7 TO NATIONAL HIGHWAY ROAD PARK EAST SIDE ROAD AND SOUTH SIDE CROSS SIDE ROADS,AGRAHARAM IN WARD NO.1
Providing Decorative Median street Lights to Sankeshwar City Limits from Old P.B. Road heera sugar factory cross to Circuit house gate and from Rani Chennamma Circle to National Highway Bridge(5054-04-337-0-01-154 MDR improvement)
CONSTRUCTION OF RETAINING WALL AND PROTECTION WORK TO SLIDED ROAD PORTION DUE TO HEAVY RAIN IN SH-252 ROAD JOINING TO NATIONAL HIGHWAY-169 VIA MAGUNDI TO BALEHONNUR, CHIKKAGRAHARA ,AND KUDREGUNDI AT CHAINAGE 113.00 KM IN N.R.PURA TALUK.