Loading…
Loading…
30,244 results • Best match
Recarpeting of the road Chadchana-Kannur Siddapur Jalageri Babanagar Tikota Babaleshwar Karajol Mulwad almatti to join National Highway 50 from Km 163.44 to km 166.67 in Basavanagudi Taluk of Vijayapura District. H.A 4059-80-051-0-60-132
Construction of Approach Road and Protection Works at Chainage 1.25 Km to 1.35 Km and 1.39Km to 1.60 Km (Bridge at 1.35 Km) Girenahalli village to connecting National Highway No 50 (VR-118) in Sandur Taluk Ballari Dist
A M I No. 10.112 / 2023-24 Glyceryl Trinitrate 2.5mg TR/CR Brand :- Angispan TR 2.5 mg TP Mfg By:- M/s Sidmak Laboratories (India) Pvt. Ltd, Survey No. 4662, 4663 and 4779 & 4785 National Highway No-4
Development of Fuelling Facilities at WSA on CPR Dwarka Expressway Gurgaon under Gurgaon DO of Delhi and Haryana State Office
Shifting and erection of LT, 11 KV and 33KV Overhead Power lines in E15 Road Extension to Old National Highway Mangalgiri including dismantling of existing lines and poles obstructing road development works in Amaravati Capital City (2nd call)
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN DBOT BASIS IN THE STATE OF WEST BENGAL AND JHARKHAND(DBOT-NH12/Farakka -Raiganj/Ch.307.200/RHS/UttarDariapur 2PIUMALD
DEV. OF EXPRESSWAY(M/O BUS SHELTER ON EXPRESSWAY CH. 0.00 TO 10.00 KM ) NOIDA.
Plantation work on Dungargarh-Sardarshahar-Rajgarh (SH-06) Road from km 71/0 to 231/0
Engagement of user fee agency on the basis of CB through etender for Kiranj FP Km.55.880 for Const. of 6lane access controlled highway from DND Maharani Bagh to Junc. near KMP Expressway with NH148NA(Delhi Vadodara Expressway) Sec of NH148NA in Delhi
Construction of road from Bhatapada R.I. office to Mahasinghpur high school via Niamatpur link road from Kalyan mandap to State Highway-9A under MMSY-TRIP in the District of Cuttack for the year 2025-26
PROPOSED CONSTRUCTION OF CC ROAD FROM NANDED LATUR STATE HIGHWAY TO USHA CHANDRA NIVAS SITE NO 14 D P ROAD IN PRABHAG NO 3 UNDER DALITOTTAR SCHEME FOR MUNICIPAL COUNCIL AHMEDPUR Tq Ahmedpur District Latur
AR and MO State Highway under Sub Division No-II, CD, APWD, Diglipur. Sw- Construction of RCC road side drain along SH-15 from Chainage 13.00 Km to 13.19 Km under Radhanagar section, CD, Diglipur
Upgradation/Special repair L/R State Highway-11 to Pakhowal via Mazri Nangal (Kalikh Mazri road from the Dehlon upto the Rangian Railway Crossing-Hind Terminals upto Length 2456 MC Kilaraipur Dist Ludhiana LDH2024-02
Construction of Four Lane Concrete Road of Existing Four Lane Section in Wangni Village from Km. 130/500 to 131/500 of Jawhar Wada Badlapur Road State Highway No.76, in Taluka Ambernath, District Thane.
Yearly maintenance of road starts from S.H. 189 to Madilage Bk. Gangapur Palshivane Talemauli Desaiwadi Paal to State Highway No.189 road. MDR No.99 Km. 0/00 to 14/00, Taluka-Bhudargad, Dist. Kolhapur
Development of new A site retail outlet Togapur Within 10 Km of Main Gate of GMDC Tadkeshwar on State Highway 65 toward Mandvi Taluka-Mandvi District Surat under Surat Divisional Office of Gujarat State Office
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN KM STONE NO. 58, TO KM STONE NO. 60 ON RAJGARH KUKSHI STATE HIGHWAY, UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE Adv No.54
Construction of New A Site KSK at location from Malappuram Kozhikode District border Ateranhimayu to Areecode Bridge on State Highway in Keezhuparamp Village Eranad Taluk Malappuram District for Kozhikode Divisional Office under Kerala State Office
DEVELOPMENT OF NEW A SITE RO AT LOCATION BETWEEN KM STONE NO. 41 AND,KM STONE NO. 43 ON MANAWAR-BANDERI STATE HIGHWAY, UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE Adv No.758
CONSTRUCTION OF NEW A SITE RETAIL OUTLET BETWEEN KM STONE NO. 8 TO KM STONE NO. 12 ON MANAWAR MANDWADA STATE HIGHWAY , TEHSIL MANAWAR DIST. DHAR UNDER INDORE DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
CONSTRUCTION OF NEW A SITE RO AT LOCATION BETWEEN KM STONE NO 96 AND KMSTONE NO 99 ON AGAR BADOD STATE HIGHWAY District Agarmalwa_Location Sr_No 681SRMP 2023_UNDER BHOPAL DIVISIONAL OFFICE OF MADHYA PRADESH STATE OFFICE
Development of A site RO at location Between Nochad Primary Health Centre and Perambra Bus Stand on State Highway 38, Nochad Village, Koyilandi Taluk in Kozhikode District for Kozhikode Divisional Office under Kerala State Office
Construction of New A site RO location From Cherukara Post Office to State Bank of India Pulamanthole Pulamanthole Village Perinthalmanna Thaluk on state highway in Malappuram district for Kozhikode Divisional Office under Kerala State O
Providing Road Safety Interventions in accident prone areas on State highway No 12 at Km40/4-8 Sarvaram Housing Board(GPS Co-ordinates 17 31"17.5'N 80 35"31.5"E) in Bhadradri Kothagudem Distict
Thirthahalli Taluk Mavinkatte-Kalmane-Yadur-Mastikatte-Kavaribailu-Sunnadamane-Nagara-Kanagodu State highway C-25 of chainage 0.00 to 22.42 and 25.25 to 26.90 KM in Thirtahalli Taluk for the year 2025-26 (Reseved for ST)
Repairs to Box Culvert at Bhadravathi to Sasivehalli (Honalli Taluk Border) via Holehonnuru, Sidlipura, Sanyasikodamagge, Nagasamudra, Mangote, Anaveri, Nimbegondi and Syderakallahalli State Highway Road Ch 15.00 Km in Bhadravathi Taluq Reserved For CAT-II(A)
Annual maintenance of SH-127 state highway -10 to Mudhol - yeragera (Andra border) road from KM 95.00 TO 135.73From Ch 105.00to109.00 excluding potholes (ECOFIX) IN DEVADURGA TALUKA RAICHUR DISTRICT (SELECTED REACHES) (Reserved for ST Category)
AR MO State Highway under Mannarghat Sub Division under RCD, APWD, Wimberly Gunj.Sub Work Removal of 01 No Pyinma tree at SN 274 near road at Mannarghat village under Mannarghat Sub Division, RCD, APWD, Wimberlygunj
Providing and laying premix carpet surfacing and seal coat in State Highway No.02 from Zero Point to INS BAAZ Gate 0.00 Km. to 0.56 Km. at Campbell Bay, GNI in connection with VVIP visit.
Renewal of SDBC work by Badethi Banchora Badrigad Motor Road (State Highway No.- 16) under annual the year 2025-26. (Km. 61 to 63, 70 to 80, 94 and 95 (600) Total Length 16.600 Km.)
BOQ for Settlement of Foreign Liquor Ware House From shalbagan to mohanpur including mohanpur municipal area under west Tripura district along the state highway for the period from 1st April 2026 to 31st March 2027
Improvement and asphalting work on selected reaches of State Highway-94 from Bagepalli to Halaguru via Gudibande Tondebhavi Mavattur Kolala Uradigere Kyathasandra Neralapura Kudur Magadi Ramanagara in Channapatna Taluk from Chainage 221.93km to 227.93 km
Conducting Automated Traffic census at counter posts in state highway and major districts roads which comes under K.R.Nagara pwd sub division for the year 2026 (From 26.02.2026 Morining 6 A.M upto 28.02.2026 Morning 6 A.M )
AME for the year 2025-26 for State highway 111, Ramanagara Jalamangala road to join Chowdanakuppe via Doddagangawadi-Akkuru-Virupasandra-Tavarakere, from Ch 0.00 to 12.00km, in Kootagal Hobli, Ramanagara taluk.(Ch 0.00 to 12.00km)
Conducting Automated Traffic census at counter posts in state highway and major districts roads which comes under Hunsur pwd sub division for the year 2026 (From 26.02.2026 Morining 6 A.M upto 28.02.2026 Morning 6 A.M )
Improvements and Gradient Cutting to the State Highway SH-34 Aurad-Sadashivgad from chainage km 395.45 to 395.95 in jamkhandi taluka of Bagalkote District. Under-5054 Appendix-E SH Improvements for the year 2024-25
Development of New A Site RO at Within 4KM from ZP UPP PRI. School, TIWSA on Darwha Yavatmal Road on State Highway, Village- JAMWADI, Taluka Yavatmal Dist Yavatmal under Nagpur DO of Maharashtra State Office
Repair To Gandhari Bridge Across Ulhas River On S.T. Depot Parnaka Arnala Ambadi Padgha Kalyan Shil Mahape Road, State Highway No.81, In Kalyan Taluka, District Thane. Ch.78/025 (Expansion Joint and Wearing Coat)
DEVELOPING, OPERATING AND MAINTAINENCE OF WAYSIDE AMENITIES ON DIFFERENT SECTIONS OF NATIONAL HIGHWAY ON LEASE BASIS IN EAST ZONE IN DBOT BASIS IN THE STATE OF WEST BENGAL AND JHARKHAND(DBOT-NH18/Purulia -Chandil /Ch.146.430/RHS/Chandil/PIU-PuruliaJH
Providing and Laying 12.00mtr wide road Yamuna Expressway to Village- Ronija at Sector- 22E, YEA Wc-02
SITC of LT line on 8Mtr ST Poles with 120mmsq ABCable and dismantling of existing LT line coming in the alignment of the work at Pamposh Colony from National Highway near K.C Hyundai to Channi Rama on turnkey basis
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of hydraulic excavator on NH.05 between Km 280.00 TO 307.0
Periodical Maintanance and Repairs for One Years to SH-13 (National Highway-753A) to Asola Jahangir - Sindkhed Raja - Shivni Taka- Dawargaon Road MDR 93 km. 0/00 to 22/00, Deulgaon Raja - Giroli B. - Nimkhed - Golegaon - Tuljapur - Palaskhed - Malakd
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of Hydraulic excavator on NH.05 between Km 236.00 to 280.0
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Supplying and stacking of approved crushed sand at site on NH.505A
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Supplying and stacking of approved crushed sand at site on NH.305
Rough Cost Estimate for Providing and Erection GALVANIZED STEEL OCTAGONALPOLES/ LED Point On Kurali Chuuni raod From National Highway to Kurali tea Point, Chandigarh Road in Front of Palm Enclave, Kurali Tea Point toward Kurali, From Punjab Dairy to
restoration of rain snow damages including other maintenance activities of various National Highway within the jurisdiction of NH Division Rampur in the state of Himachal Pradesh. SH. Hiring of hydraulic excavator on NH.05 between Km 307.00 to 368.0
Supplying of machineries along with drivers, cleaners, staffs including traffic control arrangement etc. for removal of land slide materials and soft rock cutting etc. in hilly region along National Highway No.10 from 0.00 kmp Sevoke to 52.100 kmp
Performance Based Maintenance Contract PBMC for NH 150A from km 142.000 to 171.601 in selected stretches and from km 180.800 to km 184.700 for the year 2024 25 pertaining to National Highway Division, Vijayapura in the State of Karnataka