Loading…
Loading…
4,617 results • Best match
DEVELOPING, OPERATING AND MAINTAINING OF WAYSIDE AMENITIES ON SHAMLI-AMBALA EXPRESSWAY IN VARIOUS SECTIONS ON LEASE BASIS
CONSTRUCTION OF 02 NO.ENTRANCE GATE ( FIROZABAD ROAD AND EXPRESSWAY ROAD ) AT BATESHWAR DHAM IN DISTRICT AGRA (U.P)
p/o trees and Shurbs on pond area between 60mtr wide road and Yamuna expressway 50mtr wide green belt in front of sector 19 gaur Yamuna city and central verge on 45mtr wide road and remaining length of120mtrwide road near7 percent abadi in Sector 22D
101 sachendi highway me chabutra nirman karya
Route 384H from Nevada Highway to Tubbell
37/47 main road highway se lepan
O/M Sewer Line and MSPS/SPS at Expressway (Two year Jungle Cleaning and Maint. of Park of Compound area in IPS-5,6,7,8, MSPS-2 and New Mini Pumping Station MSPS-2 Sec-168 (Part-B) along RHS NGN Expressway) Noida
M/O of Sewer line and MSPS/SPS at Expressway(Supply and Laying of Sewer line (Rising main) from IPS-5, Sec-154 and IPS-6,Sec-166 to MSPS-2, Sec-168 along RHS of N.G.N. Expressway)Noida.(Part-B)
O/M of sewer line and MSPS/SPS at Expressway (Shifting of Pressure Rising main line from IPS-4 to IPS-3 Due to Construction of Under Pass at Chanage 6.10 Km Near Sec.108 LHS Noida Gr. Noida Expressway) Noida
M/O of Sewer line and MSPS/SPS at Expressway(Supply and Laying of Sewer line (Rising main) from IPS-1, Sec-147 and IPS-2,Sec-145 to MSPS-1, Sec-136 along LHS of N.G.N. Expressway)Noida.(Part-A)
O/M of Sewer line and MSPS/SPS at Expressway (Shifting of Pressure Rising main line from IPS-8 to IPS-7 due to Construction of Under pass at change 6.10 Km near Sector-128 RHS Noida Gr. Noida Expressway) Noida
IE services for Supervision of Construction of 4lane Greenfield Delhi Amritsar Katra Expressway from Junction with KMP Expressway near Jussur Kheri to Junction with Jind Panipat road NH352A near Gangana (Km 0 to Km 60.800) on HAM under BP in Haryana
Independent Engineer during O and M for Four-lane Greenfield Delhi-Amritsar-Katra Expressway from junction with KMP Expressway near Jussur Kheri village to junction with Jind-Panipat road (NH-352A) near Gangana village (Km. 0.000 to Km. 60.800)on HAM
Pot Holes Filling Work at State Highways which Renewal by Departmental Hot Mix Plant Under Jurisdiction of Assistant Engineer I
Pot Holes Filling Work at State Highways which Renewal by Departmental Hot Mix Plant Under Jurisdiction of Assistant Engineer II
MISC
Unnao Balaji Road Highway Brij ke aage Maa Kalkapuri colony main Park ke pass apex Road ka Nirman karya.
Work No 12 Block Nakur ke Gram Jhabiran me Highway Jhabiran ke ore anurakshan Lapan and CC Karya
Under District Ambedkarnagar, Interlocking construction work from Baskhari to Tanda Highway to Tanda Highway in village Mujahidpur Lot No 17
Renewal of Lalganj Highway to Todarpur, Pure Jodha, Manna Ka Purwa, Lalganj Kalakankar Highway tak Road (VR) (Length 3.500 Km)
AS PER BOQ
Improvement of black spots and installation of warning sign boards at accident prone places and state highways
Patch Repair and Pot Holes filling work at State Highways of Constituency Sahaswan In Year 2025-26
Patch Repair Work and Pot Holes Filling work at State Highways and ODRs in Year 2025-26
Construction of Agra Bypass (Northern) connecting km. 174.500 of NH-19 (old NH-2) to km 141.000 of Yamuna Expressways in the district of Mathura in the state of Uttar Pradesh on EPC mode
E-TENDER FOR PROVIDING PROJECT MANAGEMENT CONSULTANCY SERVICES AT NRO COCO BANDA ON BUNDELKHAND EXPRESSWAY DIST. BANDA - PRAYAGRAJ TERRITORY Ok
D/o green Belt near Advant Building 08 km to 10 km Expressway with two year maintenance. Noida
CONSTRUCTION OF CULVERT ALONG WITH SECTOR-98 AT T-JUNCTION OF SECTOR-98 AND 105 TO EXPRESSWAY) NOIDA
Maintenance of Feeder Panel for Power supply VMS and CCTV in H.T.M.S Project Center Verge Noida Expressway, Noida
Design, Development and Implementation of Web Portal Turnkey Software Solution For Uttar Pradesh Expressway Industrial Development Authority, Lucknow
Maintenance of 4 wire rope Crash Barrier for the Three years at Noida-Greater Noida Expressway, Greater Noida.
Construction of RCC Protection wall in Noida-Greater Noida Expressway From Zero Point to Pari chowk, Greater Noida.
Cleaning and Desilting of main drain from Expressway Sec126 to Irrigation drain via Sec-127,128,129,130 and 135 Noida.
D/o Sector-161 (Repair of 45M Wide Road Connectivity with Expressway Service Road in Sector-161) Noida
M/o Road (Painting work on Central Verge, Footpath and BC work on Damage Road on Expressway), Noida
M/o Road (Widening of Road under DND Flyover and R/o Footpath and Drain in Expressway), Noida
Vikas khand Nauhjhil ke Gram Suhagpur me Rajaram ke ghar se expressway Nale ki aur Nali Nirman karya
Providing and laying mastic work of four lane road from Noida - Greater Noida Expressway to GBU, Greater Noida
M/o Road (Reconstruction of RCC Footpath Janpath Road Expressway side upto Culvert infront of Sec-136)Noida
Supply, Installation, Testing and Commissioning of Gobo Projections and Light Art Installation along the Noida-Greater Noida Expressway
Augmentation of Electrical Installations on parallel road to Noida Greater Noida Expressway from sector 145 to 148, Noida.
Augmentation of Electrical Installations on parallel road to Noida Greater Noida Expressway from sector 142 to 144, Noida
M/o Road (Proposed Noida Entrance gate in front of Sector-14A (Renovation Existing Structure on Expressway), Noida
Electrical work for Golf Course in Noida Sector -151A Expressway, Noida. (Air Conditioning System and Elevators/Lift system)
ADVERTISING RIGHTS ON UNIPOLE ON BOT BASIS ON NOIDAGR. NOIDA EXPRESSWAY FOR A PERIOD OF 05 YEARS, NOIDA
Electrical work for Golf Course in Noida Sector -151A Expressway, Noida. (External , Internal Electrification work with Fire fighting)
Construction of road work in Village Khirni, extending from the old Prathama Bank up to the Ganga Expressway.
Gram Panchyat Nehru Nagar block moth main highway se Suresh ke makan ki aur Apex road va nali ka nirman karya.
Imp.of H.M.P. Road from Bypass highway to muna Singh Chauhan house to Veshano Devi Xing in Ward 65 Zone 03
PATHSHALA ROAD BASI NALE (00.00CH) CHAINAGE SE LEKAR NATIONAL HIGHWAY 709 B DEHLI SAHARANPUR ROAD CHAINAGE 19.75 (19.75CH) TAK R.C.C. DWARA NALA NIRMAN KARYA